Which office has your permit
The Miami-Dade County Building Department permits unincorporated land: Kendall, Westchester, Fontainebleau, The Hammocks, the Redland and the other areas outside a city. The county's Microfilm Plan Library page says a property in unincorporated Miami-Dade has a folio number starting with "30". Miami, Miami Beach, Hialeah, Coral Gables and the other cities run their own building departments; see the Miami and Miami Beach guides for two of them.
| Tool | Search by | What it shows |
|---|---|---|
| Building Permit Selection Menu | Address, folio number, permit number, process number, contractor or qualifier number | Permits on a property, permit history, inspection history, holds and outstanding requirements |
| EPS portal | Tracking, application, permit or process number; address or folio in Advanced Search | Plan review status, only for applications that need plan review |
| E-Microfilm | Address or permit number | Digitized plans and records, for a fee |
The EPS portal itself says its results are "limited only to applications that require plan review" and sends you to the Building Permit Selection Menu "to search for all permits/applications by address or folio" (EPS, read 24 October 2026).
How to look up the permits on a Miami-Dade address
- Find the property's 13-digit folio number on the Property Appraiser's site and check that it starts with 30.
- Open the Building Permit Selection Menu and choose Open Permits by Folio, or Process/Permit Number Cross-Reference to search by address (the page links the address format it expects).
- Note each permit number. A roof or window job is usually one building permit; a remodel adds separate electrical, plumbing and mechanical permits.
- Run Permit Inspection History on each number to see which inspections passed, and Permit Project Status for where it stands.
- To see a contractor's other county permits, use Contractor Permit Inquiry with C or T and the contractor or qualifier number.
What the statuses mean here
The county's open permit file has no status and no final inspection date. Its CO/CC date, filled on 4.5% of permits in the evaluation export, applies only to jobs that end in a certificate of occupancy or completion, and its last approved inspection date can be a rough-in rather than a final. So the inspection history in the permit menu is the place to check that a final inspection passed. Open Master Permits and Permit Inspection Holds show what is still open on an address.
When the record is not online
Older plans and permit records are in the county's Microfilm Plan Library. You need the address or permit number and the folio number. Plans already digitized can be downloaded from E-Microfilm. Otherwise book an appointment online, by phone at 786-315-2340, or in person at the Permitting and Inspection Center, 11805 SW 26 Street, Room 201. The county lists a non-refundable research fee of $18.75 for residential and $46.34 for commercial properties, plus $0.15 per 8½x11 page, $6.25 per 11x17 page and $1 per page to certify (read 24 October 2026).
What our Miami-Dade County pages add
Our Miami-Dade County page counts permits on unincorporated parcels from November 2024 to September 2026:
| Kind of work | Permits (Nov 2024–Sep 2026) | Share | Last 12 months | Homes |
|---|---|---|---|---|
| Roofing | 21,395 | 20% | 10,860 | 88% |
| Electrical | 19,768 | 18% | 10,273 | 62% |
| Remodels and repairs | 15,315 | 14% | 7,924 | 100% |
| HVAC | 10,248 | 9% | 5,415 | 46% |
| Plumbing | 8,740 | 8% | 4,619 | 61% |
| Fences and walls | 6,420 | 6% | 3,325 | 90% |
| Pools and spas | 4,795 | 4% | 2,439 | 91% |
| Additions | 2,264 | 2% | 1,189 | 100% |
| New homes | 1,497 | 1% | 715 | 100% |
ZIP 33176 had the most permits, 6,478, and roofing led there. Each kind-of-work page lists the contractors named on the most permits, which is volume, not quality. The permit statistics page has month and ZIP counts, and browse permits lists the rows. To check the license behind a name, see How to check a contractor's license in Florida.
What this does not tell you
The county publishes a rolling file of roughly the last two years, so our pages start in November 2024 and have no earlier year to compare with. With no status or final date we show no finished share or time to final. The value is the estimated cost written on the permit, not what the job cost. A building permit and its electrical, plumbing and mechanical permits are separate rows, so one project can count several times. We have not matched contractor names to state license records, so we don't rate or rank firms.
How we know this
The search options are from Miami-Dade County's Building Permit Selection Menu and EPS portal, and the records route and fees from its Microfilm Plan Library page, all read 24 October 2026. Our counts are the county's Building Permits Issued By Miami-Dade County layer, read 20 October 2026: permits issued November 2024 to September 2026 on parcels whose folio starts with 30.
Numbers come from public permit records in 57 cities, data through October 20, 2026. Nobody paid to be on this page and nobody can.
Questions
- How do I find out if a permit was pulled on my house in Miami-Dade County?
If the folio number starts with 30, the house is in unincorporated Miami-Dade and the county has its permits. Use the county's Building Permit Selection Menu: Open Permits by Folio takes the folio number, and Process/Permit Number Cross-Reference takes the address. If the folio starts with another code, ask that city's building department.
- Can I look up Miami-Dade County permits by contractor?
Yes. The Building Permit Selection Menu has a Contractor Permit Inquiry that takes C or T followed by the contractor or qualifier number. The county's open permit file also names the contractor on most permits.
- How do I get old building plans for a house in unincorporated Miami-Dade?
Through the Microfilm Plan Library. Plans already digitized can be downloaded from E-Microfilm by address or permit number; otherwise book an appointment online or at 786-315-2340. The county lists a non-refundable $18.75 research fee for residential properties.
- How many building permits does unincorporated Miami-Dade issue?
About 56,500 a year: 108,268 permits from November 2024 to September 2026 in the county's open permit file, counting only parcels in unincorporated Miami-Dade. Roofing led with 21,395.
- Does the county's permit file show whether a permit was finaled?
No. The public file has no status and no final inspection date. Use Permit Inspection History or Permit Project Status in the Building Permit Selection Menu with the permit number.
Build your own list
Pick your city and the kind of work. Every firm with a permit on record, sorted by what you value.
Related guides
- Adams County, CO building permit search: the e-Permit Center, statuses and CORA
- Alachua County building permit search: Citizenserve, statuses and old records
- Anaheim building permit search: Anaheim NEXT and the Building Permit Report
- Arlington, VA building permit search: Permit Arlington lookups and FOIA requests
- Prince George's County building permit search: Momentum, ePermits and MPIA requests
- Richmond, CA building permit search: iMS, Transparent Richmond and old records
- Building Permit Selection Menu — Miami-Dade County e-Permitting (2026-10-24)
- RER Electronic Permits & Reviews System (EPS) — Miami-Dade County (2026-10-24)
- Microfilm Plan Library — Miami-Dade County Building (2026-10-24)
- E-Microfilm — Miami-Dade County (2026-10-24)
- Building Permits Issued By Miami-Dade County - 2 Previous Years to Present (ArcGIS layer) (2026-10-20)