The Scottsdale rule
The City's Home Improvement page (read 23 October 2026) says "Work that involves a single trade (plumbing, electric, mechanical, demo) may only require a Minimum Permit". For electrical work it sorts jobs like this:
| Job | Permit | The City's wording |
|---|---|---|
| New ceiling fan | Minimum Permit | "Ceiling fan (new installation)" |
| New or altered circuit | Minimum Permit | "Adding a new or altering an existing electrical circuit" |
| Move the panel | Minimum Permit | "Relocate panel box" |
| Raise the mast | Minimum Permit | "Raise electrical mast" |
| Service upgrade or change-out | Minimum Permit, up to 400 A | "Service upgrade or change out (400 AMP max.)" |
| Rewire | Minimum Permit | "Electrical re-wire" |
| Main breaker | Minimum Permit | "Replace main breaker" |
| Load controller | Minimum Permit | "Residential load controller" |
| Temporary power pole | Minimum Permit | "Temporary power pole" |
| Low-voltage landscape lighting | Courtesy review, no permit | "Low-voltage landscape accent lighting" |
| Adding or relocating systems in a remodel | Building permit with plan review | "adding or relocating mechanical, electrical, or plumbing systems require a permit" |
A service over 400 amps falls outside the Minimum Permit list, so expect plan review. Wiring for a pool or for AC equipment is electrical work too; if the same job also touches plumbing or mechanical, the $379 Minimum Combination permit covers all disciplines. Solar has its own permit: see Scottsdale solar permit.
Who can pull it
Arizona licenses electricians through the Registrar of Contractors; the license class has to be residential (or dual) and cover electrical work. The ROC says "The only sure way of knowing that your contractor is licensed is to call the Registrar of Contractors" (Before You Hire). Owners are exempt from licensing when they do the work themselves on property they will occupy, provided it is "not intended for sale or for rent"; a sale or rental within one year of completion counts as evidence that it was (A.R.S. 32-1121, read 23 October 2026). The City's page does not say how it handles owner electrical permits, so ask the One Stop Shop (480-312-7725) first.
How to apply
- Open Scottsdale SPUR, the City's planning and permitting portal, and create an account. The City says "All permit requests require a completed application to be submitted through the planning and permitting portal."
- Click Apply and search for the permit type; Minimum Permits need "only a Minimum Permit application", no plan review.
- Pay in SPUR by card, or by cash or check at the One Stop Shop, 7447 E. Indian School Road.
- Book inspections in SPUR. The first inspection must happen within 180 days of issue, and each later one within 180 days of the last, or the permit expires.
What it costs
From the City's Permit Fee Schedule: Miscellaneous, effective July 1, 2026 (on the fees page, Resolution No. 13661):
| Fee | Amount |
|---|---|
| Minimum Permit (one discipline) | $121 |
| Minimum Combination (all disciplines) | $379 |
| Temporary power pole | $121 |
| Reinspection | $121 |
| Off-hours building inspection | $379 |
| Building permit extension request | $379 |
| Work done without a permit | Double the permit fee |
A failed inspection costs another $121, as much as the permit. Labour and job prices are in electrical work cost.
What 2,365 Scottsdale electrical permits show
| Measure | Scottsdale electrical |
|---|---|
| Permits on homes, October 2023 to September 2026 | 2,365 |
| Firms | 760 |
| Firms that filed exactly one | 502 (66.1%) |
| Firms with a permit in the last 12 months of the window | 386 |
| Finalled (permits a year or more old) | 58.8% |
| 10th / 90th-percentile firm (10+ permits) | 44.0% / 84.7% |
| Firms with 10+ permits finalling under 70% | 16 of 27 |
| Busiest / quietest month | July (120) / December (76) |
Electrical permits close less often here than pool or solar permits: 58.8% were finalled, against 81.1% for pools. Among the 27 firms with 10 or more permits, 16 finalled under 70%, so the finalled share on a firm's row is worth reading before you sign. Most firms are occasional: 66.1% filed one permit in three years, which is often a pool, solar or remodel company pulling the electrical permit for its own job. Scottsdale permits record no job value and no final date, so we show neither a price nor a days-to-final figure.
See every Scottsdale electrician by permits finalled →
Next steps
Compare firms on the Scottsdale electrician list and check the ROC license with the Scottsdale contractor license lookup or how to check a contractor's license in Arizona. Past permits on your address: Scottsdale building permit search. Other cities' rules: do I need a permit for electrical work and do I need a permit for an electrical panel upgrade; the hiring checklist: hiring an electrician. Monthly counts: Scottsdale permit statistics.
What this does not tell you
We count permits the City issued; exempt low-voltage work and unpermitted work leave no record. A finalled permit means the inspection passed, not what the job cost. We have not matched Scottsdale firms to the ROC license file, so no license status is shown. Fees change each July 1.
How we know this
The job list and permit wording are quoted from the City of Scottsdale's Home Improvement page, read 23 October 2026; fees from the Permit Fee Schedule: Miscellaneous effective July 1, 2026 (Resolution No. 13661); the owner exemption from A.R.S. 32-1121, read the same day. Counts are City of Scottsdale electrical permits on homes, October 2023 to September 2026; finalled share uses permits a year or more old. Scottsdale records no final date or job value on trade permits.
Numbers come from City of Scottsdale building permits (the City's open-data permit file up to January 2026, and the City's SPUR permit system since), with the contractor named on each permit, data through October 22, 2026. Nobody paid to be on this page and nobody can.
Questions
- How much is an electrical permit in Scottsdale?
A Minimum Permit for one discipline is $121 under the City's fee schedule effective July 1, 2026, and a Minimum Combination permit covering all disciplines is $379. A temporary power pole is $121 and a reinspection $121. Work done without a permit is fined double the permit fee.
- Do I need a permit to replace an electrical panel in Scottsdale?
Yes. Replacing the main breaker, relocating the panel box, raising the mast and a service upgrade or change-out up to 400 amps are all on the City's Minimum Permit list, so they need a permit but no plan review.
- Do I need a permit to install a ceiling fan in Scottsdale?
For a new installation, yes: 'Ceiling fan (new installation)' is on the City's Minimum Permit list. Low-voltage landscape accent lighting needs only a courtesy review, not a permit.
- Can a homeowner pull an electrical permit in Scottsdale?
Arizona law exempts owners who do the work themselves on a home they will occupy, not one built or improved for sale or rent (A.R.S. 32-1121). The City's home improvement page does not set out owner rules for electrical work, so ask the One Stop Shop on 480-312-7725 before you apply in SPUR.
- How long do Scottsdale electrical permits take to final?
Scottsdale records no final date, so we cannot time them. The City says the first inspection must happen within 180 days of issue or the permit expires, and 58.8% of electrical permits a year or more old in our file were finalled.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Do I need an electrical permit in Anaheim? Panel upgrades, the utility meter spot, fees and inspections
- Do I need an electrical permit in Arlington, VA? What's exempt, who pulls it, how long it takes
- Austin building permit search: how to look up permits on an address
- Do I need an electrical permit in Austin? The exempt list, the homestead permit, fees and inspections
For one city
- Home Improvement — City of Scottsdale Planning and Development (accessed 2026-10-23)
- Permit Fee Schedule: Miscellaneous, effective July 1, 2026 — City of Scottsdale (accessed 2026-10-23)
- Planning and Permitting Portal — City of Scottsdale (2026-10-23)
- A.R.S. 32-1121 Persons not required to be licensed (accessed 2026-10-23)
- Before You Hire — Arizona Registrar of Contractors (2026-10-22)