Electrical permits in the City of Hartford, CT

Data through September 2026 · updated 19 Oct 2026

2,281 electrical permits were issued in the City of Hartford, October 2024 through September 2026: about 1,140 a year and 28% of all permits. 1,063 electrical permits in the last 12 months (Oct 2025–Sep 2026), 13% fewer than the 1,218 in the 12 months before. The busiest month is July. 06106 has the most, 741.

2,281permits issued
1,063last 12 months
Julbusiest month
58%finished
$2,500usual declared value
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 115Oct2024Nov 2024: 91Dec 2024: 89Jan 2025: 124Jan2025Feb 2025: 68Mar 2025: 75Apr 2025: 111May 2025: 101Jun 2025: 73Jul 2025: 158JulAug 2025: 126Sep 2025: 87Oct 2025: 107Nov 2025: 60Dec 2025: 90Jan 2026: 102Jan2026Feb 2026: 88Mar 2026: 84Apr 2026: 78May 2026: 112Jun 2026: 74Jul 2026: 87JulAug 2026: 96Sep 2026: 85
The same numbers as a table
MonthPermits
Oct 2024115
Nov 202491
Dec 202489
Jan 2025124
Feb 202568
Mar 202575
Apr 2025111
May 2025101
Jun 202573
Jul 2025158
Aug 2025126
Sep 202587
Oct 2025107
Nov 202560
Dec 202590
Jan 2026102
Feb 202688
Mar 202684
Apr 202678
May 2026112
Jun 202674
Jul 202687
Aug 202696
Sep 202685

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (129), June the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 119 (100 = an average month)February: 82 (100 = an average month)March: 84 (100 = an average month)April: 99 (100 = an average month)May: 112 (100 = an average month)June: 77 (100 = an average month)July: 129 (100 = an average month)129August: 117 (100 = an average month)September: 90 (100 = an average month)October: 117 (100 = an average month)November: 79 (100 = an average month)December: 94 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January119
February82
March84
April99
May112
June77
July129
August117
September90
October117
November79
December94

Download this table (CSV)

How many electrical permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20251,218
Finished58.5%
Expired0.1%

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 2,281 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$2,500
Middle half$695–$9,155

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 2,281 electrical permits.

ZIP codePermitsShare
0610674132%
0611243119%
0611438117%
0610530213%
0612025311%
061031497%
061177under 1%
061103under 1%

Download this table (CSV)

How Hartford compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Hartford Open Data, Building Permits 20200101 to Current, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, demolition and fire suppression permits the City of Hartford issues inside the city limits only. West Hartford, East Hartford, Wethersfield, Windsor and the other towns around it run their own building departments and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Hartford.
  • The city records a closing date on only about one permit in sixteen, so we show no time to final. A permit counts as finished when the city marks it Closed, Closed - Complete or Final Inspection Complete; Closed - Incomplete counts as expired.
  • The value is the total construction cost declared on the permit, which sets the fee. It is not a final cost.
  • The city files electrical, plumbing and mechanical permits as commercial whatever the building, so homes are permits filed as residential or on a parcel the assessor lists as a one-, two- or three-family house or a residential condominium.
  • Electrical, plumbing and mechanical work is filed as its own permit, so one job can count several times.
  • Temporary structure (tent) permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Hartford, CT", https://contractorrecords.com/hartford/electrical-permits, data through September 2026, from the City of Hartford Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits: declared value · Electrical permits by ZIP code.

Common questions

  • How many electrical permits does Hartford issue a year?About 1,140 a year in the City of Hartford: 2,281 permits issued October 2024 through September 2026, 1,063 of them in the last 12 months.
  • When do people in Hartford file the most electrical permits?July (129 against an average month of 100); June is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Hartford?06106, with 741 of the 2,281 (32%); then 06112 (431).