Contractor Records
Home › Hartford › HVAC

HVAC permits in the City of Hartford, CT

Data through September 2026 · updated 19 Oct 2026

974 HVAC permits were issued in the City of Hartford, October 2024 through September 2026: about 487 a year and 12% of all permits. 493 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 2% more than the 481 in the 12 months before. The busiest month is March. 06106 has the most, 301.

974permits issued
493last 12 months
Marbusiest month
47%finished
$14,000usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 48Oct2024Nov 2024: 42Dec 2024: 44Jan 2025: 57Jan2025Feb 2025: 39Mar 2025: 41Apr 2025: 36May 2025: 29Jun 2025: 19Jul 2025: 44JulAug 2025: 43Sep 2025: 39Oct 2025: 40Nov 2025: 54Dec 2025: 45Jan 2026: 37Jan2026Feb 2026: 24Mar 2026: 80Apr 2026: 52May 2026: 26Jun 2026: 28Jul 2026: 40JulAug 2026: 33Sep 2026: 34
The same numbers as a table
MonthPermits
Oct 202448
Nov 202442
Dec 202444
Jan 202557
Feb 202539
Mar 202541
Apr 202536
May 202529
Jun 202519
Jul 202544
Aug 202543
Sep 202539
Oct 202540
Nov 202554
Dec 202545
Jan 202637
Feb 202624
Mar 202680
Apr 202652
May 202626
Jun 202628
Jul 202640
Aug 202633
Sep 202634

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (149), June the quietest (58). A busy month at the permit counter usually means a longer wait for a contractor.

January: 116 (100 = an average month)February: 78 (100 = an average month)March: 149 (100 = an average month)149April: 108 (100 = an average month)May: 68 (100 = an average month)June: 58 (100 = an average month)July: 103 (100 = an average month)August: 94 (100 = an average month)September: 90 (100 = an average month)October: 108 (100 = an average month)November: 118 (100 = an average month)December: 110 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January116
February78
March149
April108
May68
June58
July103
August94
September90
October108
November118
December110

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025481
Finished46.6%
Expired0.2%

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 974 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,000
Middle half$8,000–$25,000

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 974 HVAC permits.

ZIP codePermitsShare
0610630131%
0611417518%
0610516317%
0611215816%
0612010811%
06103606%
061192under 1%
061172under 1%

Download this table (CSV)

How Hartford compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Hartford Open Data, Building Permits 20200101 to Current, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, demolition and fire suppression permits the City of Hartford issues inside the city limits only. West Hartford, East Hartford, Wethersfield, Windsor and the other towns around it run their own building departments and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Hartford.
  • The city records a closing date on only about one permit in sixteen, so we show no time to final. A permit counts as finished when the city marks it Closed, Closed - Complete or Final Inspection Complete; Closed - Incomplete counts as expired.
  • The value is the total construction cost declared on the permit, which sets the fee. It is not a final cost.
  • The city files electrical, plumbing and mechanical permits as commercial whatever the building, so homes are permits filed as residential or on a parcel the assessor lists as a one-, two- or three-family house or a residential condominium.
  • Electrical, plumbing and mechanical work is filed as its own permit, so one job can count several times.
  • Temporary structure (tent) permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Hartford, CT", https://contractorrecords.com/hartford/hvac-permits, data through September 2026, from the City of Hartford Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits: declared value · HVAC permits by ZIP code.

Common questions

  • How many HVAC permits does Hartford issue a year?About 487 a year in the City of Hartford: 974 permits issued October 2024 through September 2026, 493 of them in the last 12 months.
  • When do people in Hartford file the most HVAC permits?March (149 against an average month of 100); June is the quietest (58). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Hartford?06106, with 301 of the 974 (31%); then 06114 (175).