900 roofing permits were issued in the City of Hartford, October 2024 through September 2026: about 450 a year and 11% of all permits. 429 roofing permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 471 in the 12 months before. The busiest month is October. 06106 has the most, 250.

900permits issued
429last 12 months
Octbusiest month
41%finished
$14,602usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 50Oct2024Nov 2024: 27Dec 2024: 37Jan 2025: 48Jan2025Feb 2025: 20Mar 2025: 37Apr 2025: 28May 2025: 32Jun 2025: 53Jul 2025: 43JulAug 2025: 40Sep 2025: 56Oct 2025: 41Nov 2025: 36Dec 2025: 42Jan 2026: 32Jan2026Feb 2026: 19Mar 2026: 34Apr 2026: 55May 2026: 29Jun 2026: 30Jul 2026: 36JulAug 2026: 47Sep 2026: 28
The same numbers as a table
MonthPermits
Oct 202450
Nov 202427
Dec 202437
Jan 202548
Feb 202520
Mar 202537
Apr 202528
May 202532
Jun 202553
Jul 202543
Aug 202540
Sep 202556
Oct 202541
Nov 202536
Dec 202542
Jan 202632
Feb 202619
Mar 202634
Apr 202655
May 202629
Jun 202630
Jul 202636
Aug 202647
Sep 202628

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (121), February the quietest (52). A busy month at the permit counter usually means a longer wait for a contractor.

January: 107 (100 = an average month)February: 52 (100 = an average month)March: 95 (100 = an average month)April: 111 (100 = an average month)May: 81 (100 = an average month)June: 111 (100 = an average month)July: 105 (100 = an average month)August: 116 (100 = an average month)September: 112 (100 = an average month)October: 121 (100 = an average month)121November: 84 (100 = an average month)December: 105 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January107
February52
March95
April111
May81
June111
July105
August116
September112
October121
November84
December105

Download this table (CSV)

How many roofing permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025471
Finished41.0%
Expired0.0%

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 900 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,602
Middle half$9,500–$25,192

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 900 roofing permits.

ZIP codePermitsShare
0610625028%
0611421824%
0611219822%
0612012113%
061059010%
061038under 1%
061175under 1%
061102under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Alteration65873%
Commercial Alteration24227%

Download this table (CSV)

How Hartford compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Hartford Open Data, Building Permits 20200101 to Current, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, solar, demolition and fire suppression permits the City of Hartford issues inside the city limits only. West Hartford, East Hartford, Wethersfield, Windsor and the other towns around it run their own building departments and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Hartford.
  • The city records a closing date on only about one permit in sixteen, so we show no time to final. A permit counts as finished when the city marks it Closed, Closed - Complete or Final Inspection Complete; Closed - Incomplete counts as expired.
  • The value is the total construction cost declared on the permit, which sets the fee. It is not a final cost.
  • The city files electrical, plumbing and mechanical permits as commercial whatever the building, so homes are permits filed as residential or on a parcel the assessor lists as a one-, two- or three-family house or a residential condominium.
  • Electrical, plumbing and mechanical work is filed as its own permit, so one job can count several times.
  • Temporary structure (tent) permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Hartford, CT", https://contractorrecords.com/hartford/roofing-permits, data through September 2026, from the City of Hartford Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: finished share · Roofing permits: declared value · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Hartford issue a year?About 450 a year in the City of Hartford: 900 permits issued October 2024 through September 2026, 429 of them in the last 12 months.
  • When do people in Hartford file the most roofing permits?October (121 against an average month of 100); February is the quietest (52). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Hartford?06106, with 250 of the 900 (28%); then 06114 (218).