Data through September 2026 · updated 19 Oct 2026
2,711 building permits were issued in the Town of Holly Springs from October 2025 to September 2026, about 2,711 a year. HVAC permits lead with 782, then electrical (563) and new homes (297). 79% were for homes. The town's file doesn't name contractors, so we can't rank, compare or profile firms here: these pages show what was built, where and when.
Building and trade permits the Town of Holly Springs issued for property in the town and its planning area: new homes, home alterations and additions, HVAC and water heater change-outs, electrical, plumbing, pool, solar, sign and commercial building permits. Wake County, Apex, Fuquay-Varina, Cary and Raleigh run their own permit offices and are not in this file (some Holly Springs addresses carry an Apex or Fuquay-Varina mailing ZIP). Zoning-only, driveway, encroachment, utility, civil drawing, alcohol (ABC) and temporary-use permits are left out.
The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the North Carolina Licensing Board for General Contractors, then ask the town whether they pulled the permit for your job.
Permits issued October 2025 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026. Homes is the share issued as residential permits.
| Kind of work | Permits | Share | Last 12 mo |
|---|---|---|---|
| HVAC | 782 | 29% | 782 |
| Electrical | 563 | 21% | 563 |
| New homes | 297 | 11% | 297 |
| Remodels & repairs | 187 | 7% | 187 |
| Plumbing | 168 | 6% | 168 |
| Other | 446 | 16% | 446 |
Fewer than 100 permits, so no row: additions (88), pools & spas (63), solar (58), garages, sheds & shade structures (44), demolition (10), roofing (3), fences & walls (2).
Local permit rules and lookups, each with Holly Springs's own permit numbers.
Permit data for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.
Source: Town of Holly Springs Monthly Reporting, Permits Issued reports (xlsx), read 19 Oct 2026. We count permits issued October 2025 through September 2026; denied and withdrawn permits are left out. The town's monthly reports list permits as they were issued, with a status on only some months, so they can't show which permits were later finished, so no finished share is shown.
Building and trade permits the Town of Holly Springs issued for property in the town and its planning area: new homes, home alterations and additions, HVAC and water heater change-outs, electrical, plumbing, pool, solar, sign and commercial building permits. Wake County, Apex, Fuquay-Varina, Cary and Raleigh run their own permit offices and are not in this file (some Holly Springs addresses carry an Apex or Fuquay-Varina mailing ZIP). Zoning-only, driveway, encroachment, utility, civil drawing, alcohol (ABC) and temporary-use permits are left out.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "The Town of Holly Springs, NC building permits", https://contractorrecords.com/holly-springs/, data through September 2026, from Town of Holly Springs Development Services building-permit records.Link to a table: By kind of work · Browse the permits · Permits each month.
Download the tables (CSV): Permits by kind of work · Permits in the last 12 months.
Every permit in the file issued October 2025 through September 2026, newest first. Pick a month, a kind of work or a ZIP code. Each row is one permit: no street address, no names.
The list loads as you reach it (2,711 permits).
| Issued | Kind of work | Town permit type | ZIP |
|---|
Permits issued each month and the kind of work with the most. A month opens its permits in the list above.