Contractor Records
Home › Huntsville › Additions

Home addition permits in the City of Huntsville, AL

Data through September 2026 · updated 19 Oct 2026

655 home addition permits were issued in the City of Huntsville, October 2024 through September 2026: about 328 a year and 12% of all permits. 343 home addition permits in the last 12 months (Oct 2025–Sep 2026), 10% more than the 312 in the 12 months before. The busiest month is October. The usual one took 262 days from issue to the city's final.

What this file covers: The city publishes building permits only; electrical, plumbing, mechanical, gas and roofing permits are not in the file.

655permits issued
343last 12 months
Octbusiest month
262days, usual issue to final
24%finished
$37,424usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 40Oct2024Nov 2024: 19Dec 2024: 28Jan 2025: 32Jan2025Feb 2025: 19Mar 2025: 16Apr 2025: 26May 2025: 36Jun 2025: 17Jul 2025: 29JulAug 2025: 31Sep 2025: 19Oct 2025: 33Nov 2025: 25Dec 2025: 16Jan 2026: 30Jan2026Feb 2026: 25Mar 2026: 35Apr 2026: 20May 2026: 20Jun 2026: 42Jul 2026: 34JulAug 2026: 33Sep 2026: 30
The same numbers as a table
MonthPermits
Oct 202440
Nov 202419
Dec 202428
Jan 202532
Feb 202519
Mar 202516
Apr 202526
May 202536
Jun 202517
Jul 202529
Aug 202531
Sep 202519
Oct 202533
Nov 202525
Dec 202516
Jan 202630
Feb 202625
Mar 202635
Apr 202620
May 202620
Jun 202642
Jul 202634
Aug 202633
Sep 202630

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (134), February the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 114 (100 = an average month)February: 81 (100 = an average month)March: 93 (100 = an average month)April: 84 (100 = an average month)May: 103 (100 = an average month)June: 108 (100 = an average month)July: 115 (100 = an average month)August: 117 (100 = an average month)September: 90 (100 = an average month)October: 134 (100 = an average month)134November: 81 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January114
February81
March93
April84
May103
June108
July115
August117
September90
October134
November81
December81

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 75 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025312
Finished24.0%
Usual days, issue to final262
Middle half, days149–399

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 627 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$37,424
Middle half$13,416–$102,035

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Addition (Single Family)62696%
Addition (Townhomes)264%
Addition (Duplex)3under 1%

Download this table (CSV)

How these numbers are made

Source: City of Huntsville GIS: BuildingPermits and OccupancyCerts layers (Licenses/BuildingPermits MapServer layers 0 and 1), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Huntsville, Alabama issues inside city limits (in Madison, Limestone and Morgan counties): new construction, alterations, additions, accessory buildings and demolitions for homes and commercial buildings. The city does not publish its electrical, plumbing, mechanical, gas or roofing permits, so those trades are not in this file. Madison, unincorporated Madison County and the other nearby towns run their own permit offices and are not in this file, and neither is Huntsville, Texas.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Huntsville.
  • Only building permits are published; electrical, plumbing, mechanical, gas and roofing permits are not in the city's file.
  • The file has no permit status or final inspection date. A permit counts as finished once the city issues a certificate of occupancy for it, and the certificate's date stands in for the final date. Alterations and additions often get no certificate, so they mostly show as open.
  • The value is the contract amount on the permit.
  • Homes are permits for single-family homes, townhomes, duplexes and condos; apartment buildings count as other.
  • The file has no ZIP code we can publish, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in the City of Huntsville, AL", https://contractorrecords.com/huntsville/addition-permits, data through September 2026, from City of Huntsville Inspection Department building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by permit type.

Common questions

  • How many home addition permits does Huntsville issue a year?About 328 a year in the City of Huntsville: 655 permits issued October 2024 through September 2026, 343 of them in the last 12 months.
  • How long does a home addition permit take in Huntsville?The usual one took 262 days from issue to the city's final inspection, and the middle half took 149 to 399 days (75 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Huntsville file the most home addition permits?October (134 against an average month of 100); February is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.