Contractor Records
Home › Montgomery › HVAC

HVAC permits in the City of Montgomery, AL

Data through September 2026 · updated 20 Oct 2026

2,985 HVAC permits were issued in the City of Montgomery, October 2024 through September 2026: about 1,492 a year and 22% of all permits. 1,319 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 21% fewer than the 1,666 in the 12 months before. The busiest month is June. 36117 has the most, 868.

2,985permits issued
1,319last 12 months
Junbusiest month
38%finished
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 151Oct2024Nov 2024: 109Dec 2024: 119Jan 2025: 107Jan2025Feb 2025: 141Mar 2025: 111Apr 2025: 172May 2025: 157Jun 2025: 190Jul 2025: 159JulAug 2025: 135Sep 2025: 115Oct 2025: 121Nov 2025: 85Dec 2025: 86Jan 2026: 82Jan2026Feb 2026: 103Mar 2026: 123Apr 2026: 124May 2026: 81Jun 2026: 143Jul 2026: 130JulAug 2026: 147Sep 2026: 94
The same numbers as a table
MonthPermits
Oct 2024151
Nov 2024109
Dec 2024119
Jan 2025107
Feb 2025141
Mar 2025111
Apr 2025172
May 2025157
Jun 2025190
Jul 2025159
Aug 2025135
Sep 2025115
Oct 2025121
Nov 202585
Dec 202586
Jan 202682
Feb 2026103
Mar 2026123
Apr 2026124
May 202681
Jun 2026143
Jul 2026130
Aug 2026147
Sep 202694

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (134), January the quietest (76). A busy month at the permit counter usually means a longer wait for a contractor.

January: 76 (100 = an average month)February: 98 (100 = an average month)March: 94 (100 = an average month)April: 119 (100 = an average month)May: 96 (100 = an average month)June: 134 (100 = an average month)134July: 116 (100 = an average month)August: 113 (100 = an average month)September: 84 (100 = an average month)October: 109 (100 = an average month)November: 78 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January76
February98
March94
April119
May96
June134
July116
August113
September84
October109
November78
December82

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 20251,666
Finished37.5%

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 2,985 HVAC permits.

ZIP codePermitsShare
3611786829%
3611658119%
3610935212%
3610629410%
361111886%
361081415%
361041415%
361051184%
36107863%
36110803%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical2,88197%
Gas1043%

Download this table (CSV)

How Montgomery compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Montgomery GIS: Construction Permit Data (HostedDatasets/Construction_Permits FeatureServer layer 0), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing and gas permits the City of Montgomery issues for property in the city and its police jurisdiction: new homes, home alterations and repairs, additions, fences, pools, accessory buildings, demolition, commercial construction and signs. Certificates of occupancy, changes of occupancy, grading permits, driveway curb cuts and well permits in the same file are not counted. Prattville, Pike Road, Millbrook and the rest of Montgomery County outside the city's jurisdiction are not in this file.

  • The file has no final inspection date, so we show no time to final. A permit counts as finished when the city marks it completed.
  • Far fewer 2025 and 2026 permits are marked completed than 2024 permits (about three in ten against six in ten), so the finished share for recent permits is low and likely to rise as the city closes them out.
  • The estimated cost is a real job value on building permits only; electrical, mechanical, plumbing and gas permits carry a nominal figure, so we show it for building permits alone.
  • Gas permits for furnaces and heaters count as HVAC; other gas permits (gas lines, water heaters, ranges) count as plumbing. Re-roofs and solar filed as residential repair permits are sorted by their description.
  • Homes are permits the city marks residential use; apartment buildings and mixed-use projects count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Montgomery, AL", https://contractorrecords.com/montgomery-al/hvac-permits, data through September 2026, from City of Montgomery Department of Inspections building-permit records.

Link to a table: By month · Season · How many get finished · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Montgomery issue a year?About 1,492 a year in the City of Montgomery: 2,985 permits issued October 2024 through September 2026, 1,319 of them in the last 12 months.
  • When do people in Montgomery file the most HVAC permits?June (134 against an average month of 100); January is the quietest (76). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Montgomery?36117, with 868 of the 2,985 (29%); then 36116 (581).