Contractor Records
Home › Montgomery › New homes

New home permits in the City of Montgomery, AL

Data through September 2026 · updated 20 Oct 2026

513 new home permits were issued in the City of Montgomery, October 2024 through September 2026: about 256 a year and 4% of all permits. 247 new home permits in the last 12 months (Oct 2025–Sep 2026), 7% fewer than the 266 in the 12 months before. The busiest month is March. 36116 has the most, 244.

513permits issued
247last 12 months
Marbusiest month
38%finished
$154,100usual declared value
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 39Oct2024Nov 2024: 12Dec 2024: 21Jan 2025: 32Jan2025Feb 2025: 22Mar 2025: 23Apr 2025: 27May 2025: 34Jun 2025: 4Jul 2025: 10JulAug 2025: 15Sep 2025: 27Oct 2025: 17Nov 2025: 18Dec 2025: 14Jan 2026: 29Jan2026Feb 2026: 22Mar 2026: 48Apr 2026: 17May 2026: 15Jun 2026: 14Jul 2026: 24JulAug 2026: 21Sep 2026: 8
The same numbers as a table
MonthPermits
Oct 202439
Nov 202412
Dec 202421
Jan 202532
Feb 202522
Mar 202523
Apr 202527
May 202534
Jun 20254
Jul 202510
Aug 202515
Sep 202527
Oct 202517
Nov 202518
Dec 202514
Jan 202629
Feb 202622
Mar 202648
Apr 202617
May 202615
Jun 202614
Jul 202624
Aug 202621
Sep 20268

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (166), June the quietest (42). A busy month at the permit counter usually means a longer wait for a contractor.

January: 143 (100 = an average month)February: 103 (100 = an average month)March: 166 (100 = an average month)166April: 103 (100 = an average month)May: 115 (100 = an average month)June: 42 (100 = an average month)July: 80 (100 = an average month)August: 84 (100 = an average month)September: 82 (100 = an average month)October: 131 (100 = an average month)November: 70 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January143
February103
March166
April103
May115
June42
July80
August84
September82
October131
November70
December82

Download this table (CSV)

How many new home permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025266
Finished37.6%

Download this table (CSV)

What a new home permit is declared at

The value written on the permit at application, from 493 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$154,100
Middle half$135,135–$187,800

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 513 new home permits.

ZIP codePermitsShare
3611624448%
3611718135%
36110194%
36106173%
36043122%
36108112%
3606471%
361094under 1%
361053under 1%
361112under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
New Single Family Residence48194%
Modular/Manufactured Residential/Double +112%
Modular/Manufactured Residential/Single102%
Townhouse82%
Two Family Dwelling2under 1%
Patio Home1under 1%

Download this table (CSV)

How Montgomery compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Montgomery GIS: Construction Permit Data (HostedDatasets/Construction_Permits FeatureServer layer 0), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing and gas permits the City of Montgomery issues for property in the city and its police jurisdiction: new homes, home alterations and repairs, additions, fences, pools, accessory buildings, demolition, commercial construction and signs. Certificates of occupancy, changes of occupancy, grading permits, driveway curb cuts and well permits in the same file are not counted. Prattville, Pike Road, Millbrook and the rest of Montgomery County outside the city's jurisdiction are not in this file.

  • The file has no final inspection date, so we show no time to final. A permit counts as finished when the city marks it completed.
  • Far fewer 2025 and 2026 permits are marked completed than 2024 permits (about three in ten against six in ten), so the finished share for recent permits is low and likely to rise as the city closes them out.
  • The estimated cost is a real job value on building permits only; electrical, mechanical, plumbing and gas permits carry a nominal figure, so we show it for building permits alone.
  • Gas permits for furnaces and heaters count as HVAC; other gas permits (gas lines, water heaters, ranges) count as plumbing. Re-roofs and solar filed as residential repair permits are sorted by their description.
  • Homes are permits the city marks residential use; apartment buildings and mixed-use projects count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in the City of Montgomery, AL", https://contractorrecords.com/montgomery-al/new-home-permits, data through September 2026, from City of Montgomery Department of Inspections building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: finished share · New homes permits: declared value · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Montgomery issue a year?About 256 a year in the City of Montgomery: 513 permits issued October 2024 through September 2026, 247 of them in the last 12 months.
  • When do people in Montgomery file the most new home permits?March (166 against an average month of 100); June is the quietest (42). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Montgomery?36116, with 244 of the 513 (48%); then 36117 (181).