Contractor Records
Home › San Antonio › Remodels & repairs

Remodel and repair permits in the City of San Antonio, TX

Data through September 2026 · updated 18 Oct 2026

15,019 remodel and repair permits were issued in the City of San Antonio, October 2024 through September 2026: about 7,510 a year and 12% of all permits. 8,189 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 20% more than the 6,830 in the 12 months before. The busiest month is April. 78247 has the most, 758.

15,019permits issued
8,189last 12 months
Aprbusiest month
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 600Oct2024Nov 2024: 471Dec 2024: 438Jan 2025: 548Jan2025Feb 2025: 478Mar 2025: 580Apr 2025: 751May 2025: 565Jun 2025: 572Jul 2025: 617JulAug 2025: 577Sep 2025: 633Oct 2025: 730Nov 2025: 718Dec 2025: 612Jan 2026: 622Jan2026Feb 2026: 667Mar 2026: 689Apr 2026: 833May 2026: 593Jun 2026: 628Jul 2026: 766JulAug 2026: 683Sep 2026: 648
The same numbers as a table
MonthPermits
Oct 2024600
Nov 2024471
Dec 2024438
Jan 2025548
Feb 2025478
Mar 2025580
Apr 2025751
May 2025565
Jun 2025572
Jul 2025617
Aug 2025577
Sep 2025633
Oct 2025730
Nov 2025718
Dec 2025612
Jan 2026622
Feb 2026667
Mar 2026689
Apr 2026833
May 2026593
Jun 2026628
Jul 2026766
Aug 2026683
Sep 2026648

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (127), December the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 91 (100 = an average month)March: 101 (100 = an average month)April: 127 (100 = an average month)127May: 93 (100 = an average month)June: 96 (100 = an average month)July: 111 (100 = an average month)August: 101 (100 = an average month)September: 102 (100 = an average month)October: 106 (100 = an average month)November: 95 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February91
March101
April127
May93
June96
July111
August101
September102
October106
November95
December84

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 15,019 remodel and repair permits.

ZIP codePermitsShare
782477585%
782107285%
782017055%
782286324%
782335484%
782495243%
782235183%
782095053%
782454923%
782124833%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential Repair Permit8,85859%
Foundation Repair Permit6,16141%

Download this table (CSV)

Nearby permit data

Remodel and repair permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of San Antonio Open Data, Building Permits (Permits Issued 2020-2024 and Permits Issued), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. San Antonio's published permit file has no status and no final inspection date, so no finished share is shown.

Building, trade, sign and demolition permits the City of San Antonio Development Services Department issues inside the city limits. Unincorporated Bexar County and the separate cities inside or next to San Antonio (Alamo Heights, Leon Valley, Castle Hills, Converse, Live Oak, Schertz and others) run their own permit offices and are not in this file. Garage sale, tree, temporary sign and banner, sidewalk, street and sitework permits in the same file are not counted.

  • The city's file lists a primary contact for each permit, often a person and not the contractor of record, so we show no contractor lists, rankings or firm pages for San Antonio.
  • The file has no permit status or final inspection date, so it can't show which permits were finished or how long a permit takes.
  • A declared value is filled on only about 3% of permits, almost all commercial, so we show no costs.
  • A commercial building permit lists its electrical, plumbing and mechanical work under the same permit number; each number counts once, as the building permit.
  • Homes are the permit types the city files as residential: new homes, manufactured homes, residential repairs, additions, accessory dwellings, patios, carports, decks, sheds, fences and pools. Re-roof, foundation repair, solar and trade permits don't say whether the building is a home and count as other.
  • Lawn irrigation (sprinkler) permits are filed as plumbing permits by the city; we count them under other, not plumbing.
  • The ZIP code is read from the permit's address.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of San Antonio, TX", https://contractorrecords.com/san-antonio/remodel-permits, data through September 2026, from the City of San Antonio Development Services Department building-permit records.

Link to a table: By month · Season · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does San Antonio issue a year?About 7,510 a year in the City of San Antonio: 15,019 permits issued October 2024 through September 2026, 8,189 of them in the last 12 months.
  • When do people in San Antonio file the most remodel and repair permits?April (127 against an average month of 100); December is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in San Antonio?78247, with 758 of the 15,019 (5%); then 78210 (728).