Contractor Records
Home › New Braunfels › Remodels & repairs

Remodel and repair permits in New Braunfels, TX

Data through September 2026 · updated 19 Oct 2026

1,587 remodel and repair permits were issued in New Braunfels, October 2024 through September 2026: about 794 a year and 12% of all permits. 802 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 2% more than the 785 in the 12 months before. The busiest month is October. The usual one took 71 days from issue to the city's final. 78130 has the most, 874.

1,587permits issued
802last 12 months
Octbusiest month
71days, usual issue to final
61%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 86Oct2024Nov 2024: 70Dec 2024: 55Jan 2025: 77Jan2025Feb 2025: 71Mar 2025: 77Apr 2025: 66May 2025: 57Jun 2025: 40Jul 2025: 56JulAug 2025: 48Sep 2025: 82Oct 2025: 80Nov 2025: 75Dec 2025: 63Jan 2026: 71Jan2026Feb 2026: 61Mar 2026: 78Apr 2026: 99May 2026: 55Jun 2026: 52Jul 2026: 42JulAug 2026: 58Sep 2026: 68
The same numbers as a table
MonthPermits
Oct 202486
Nov 202470
Dec 202455
Jan 202577
Feb 202571
Mar 202577
Apr 202566
May 202557
Jun 202540
Jul 202556
Aug 202548
Sep 202582
Oct 202580
Nov 202575
Dec 202563
Jan 202671
Feb 202661
Mar 202678
Apr 202699
May 202655
Jun 202652
Jul 202642
Aug 202658
Sep 202668

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (126), June the quietest (70). A busy month at the permit counter usually means a longer wait for a contractor.

January: 112 (100 = an average month)February: 100 (100 = an average month)March: 117 (100 = an average month)April: 125 (100 = an average month)May: 85 (100 = an average month)June: 70 (100 = an average month)July: 74 (100 = an average month)August: 80 (100 = an average month)September: 113 (100 = an average month)October: 126 (100 = an average month)126November: 110 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January112
February100
March117
April125
May85
June70
July74
August80
September113
October126
November110
December89

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 481 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025785
Finished61.3%
Expired0.1%
Usual days, issue to final71
Middle half, days36–180

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 1,587 remodel and repair permits.

ZIP codePermitsShare
7813087455%
78132855%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential - Foundation1,13271%
Residential - Miscellaneous32420%
Residential - Alteration-Remodel1318%

Download this table (CSV)

Most active contractors by permits filed

The contractors named on the most remodel and repair permits in the City of New Braunfels Open Data file, October 2024 through September 2026, with 5 or more each. Share is the part of all 1,587 remodel and repair permits; 99% of them name a contractor we can show. This is volume, not quality: more permits doesn't mean better work. Individuals' names, owner-builders and blanks are left out.

ContractorPermitsShare
Hercules Foundation Repair LLC15810%
GL Hunt Foundation Repair15510%
Alamo HY-Tech Foundation1399%
Window World1167%
Foundation Support Specialists815%
Renewal by Anderson755%
Olshan Foundation Repair714%
Done Right Foundation Repair & Houseleveling LLC644%
Ram Jack604%
Baird Foundation Repair513%

Download this table (CSV)

How New Braunfels compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Austin and San Antonio. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of New Braunfels Open Data, OpenData/PlanningZoning MapServer layer 10 (Permits), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, electrical, plumbing, mechanical, irrigation, roofing and other construction permits the City of New Braunfels Development Services issues inside city limits, in both Comal and Guadalupe counties. Planning, platting, engineering, floodplain and inspection-request records are not counted.

  • The city's file lists the contractor on most permits. The contractor table counts permits filed per firm; it does not rate, rank or compare their work, and there are no firm pages for New Braunfels.
  • The file has no declared job value, so we show no costs.
  • A final date is the date the city closed the permit. A permit the city left at Issued counts as open.
  • Lawn-irrigation permits, driveways, flatwork and signs count as other. Foundation repairs count as remodels and repairs.
  • The file has no ZIP column; ZIP codes come from the address where it ends in one (about 60% of permits).

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in New Braunfels, TX", https://contractorrecords.com/new-braunfels/remodel-permits, data through September 2026, from City of New Braunfels Development Services building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types · Most active contractors by permits filed.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type · Most active contractors by permits filed.

Common questions

  • How many remodel and repair permits does New Braunfels issue a year?About 794 a year in New Braunfels: 1,587 permits issued October 2024 through September 2026, 802 of them in the last 12 months.
  • How long does a remodel and repair permit take in New Braunfels?The usual one took 71 days from issue to the city's final inspection, and the middle half took 36 to 180 days (481 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in New Braunfels file the most remodel and repair permits?October (126 against an average month of 100); June is the quietest (70). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in New Braunfels?78130, with 874 of the 1,587 (55%); then 78132 (85).