Contractor Records
Home › Tacoma

Tacoma, WA building permits

Data through September 2026 · updated 19 Oct 2026

6,026 building permits were issued in Tacoma from October 2024 to September 2026, about 3,013 a year. HVAC permits lead with 2,784, then remodels & repairs (1,223) and plumbing (931). 100% were for homes. The city's file doesn't name contractors, so we can't rank, compare or profile firms here: these pages show what was built, where and when.

6,026permits issued
3,013a year
100%for homes
72%finished (Oct 2024–Sep 2025 permits)
Sep 2026records through

What gets built here

What this page can and can't show

  • ✓Permits the city issued, by kind of work, month and ZIP code.
  • ✓Which permits finished, are still open or expired.
  • ✓What the job was declared at on the permit.
  • Who did the work. The city's file doesn't name contractors, so we can't rank, compare or profile firms here.
  • How long a permit takes to final. The file has too few final dates.
  • Street addresses or owners. We publish counts and permit rows without them.

Residential building permits the City of Tacoma Planning and Development Services issues inside the city: heating and cooling, plumbing, alterations, new houses, ADUs and demolition, for houses, duplexes and small apartment buildings. Commercial permits, site development, utility connections, right-of-way and sign permits in the same file are not counted. Unincorporated Pierce County and the neighbouring cities (Lakewood, University Place, Fife, Puyallup and the rest) run their own permit offices and are not in this file.

Hiring someone here?

The permit file can't tell you who does good work. Ask for the contractor's license number and look it up at the Washington State Department of Labor & Industries, then ask the city whether they pulled the permit for your job.

How to check a contractor's license in Washington →

Permits by kind of work

Permits issued October 2024 through September 2026, every kind of work with 100 or more. Last 12 months is Oct 2025–Sep 2026. Homes is the share issued as residential permits.

Kind of workPermitsShareLast 12 mo
HVAC2,78446%1,452
Remodels & repairs1,22320%666
Plumbing93115%500
New homes2694%151
ADUs & casitas1783%110
Additions1553%89
Demolition1502%82
Solar1272%34

Fewer than 100 permits, so no row: roofing (76), garages, sheds & shade structures (34), fences & walls (12), pools & spas (6), other (81).

Download this table (CSV)

Guides for Tacoma

Local permit rules and lookups, each with Tacoma's own permit numbers.

Nearby permit data

Permit data for other places in Seattle and Puget Sound. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tacoma, Accela Permit Data (ArcGIS layer accela_permit_data), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential building permits the City of Tacoma Planning and Development Services issues inside the city: heating and cooling, plumbing, alterations, new houses, ADUs and demolition, for houses, duplexes and small apartment buildings. Commercial permits, site development, utility connections, right-of-way and sign permits in the same file are not counted. Unincorporated Pierce County and the neighbouring cities (Lakewood, University Place, Fife, Puyallup and the rest) run their own permit offices and are not in this file.

  • The city's file names no contractor (only an applicant, often the owner or a permit service), so there are no contractor lists, rankings or firm pages for Tacoma.
  • Electrical work in Tacoma is permitted and inspected by Tacoma Power, not in this file, so there is no electrical count.
  • The file has a status but no final inspection date, so we show which permits finished but not how long they took. The city rarely marks a permit expired: one that lapsed usually still shows as issued, so it counts as open.
  • The value is the valuation on the permit; trade permits often carry none.
  • Residential means the city's residential permit class, which includes duplexes and small apartment buildings as well as houses.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Tacoma, WA building permits", https://contractorrecords.com/tacoma/, data through September 2026, from the City of Tacoma Planning and Development Services building-permit records.

Link to a table: By kind of work · Browse the permits · Permits each month.

Download the tables (CSV): Permits by kind of work · Permits in the last 12 months.

Common questions

  • How many building permits does Tacoma issue a year?About 3,013 a year in Tacoma: 6,026 permits issued October 2024 through September 2026, 3,204 of them in the last 12 months. That counts the permits the city issued, all for homes, not denied or withdrawn applications.
  • Can I find a contractor's permits in Tacoma?Not from this file: the city publishes its permits without the contractor's name, so we can't list or rank firms. Check a license at the Washington State Department of Labor & Industries and ask the contractor for the permit number of a past job.
  • What do people build most in Tacoma?HVAC: 2,784 of the 6,026 permits (46%), then remodels & repairs (1,223), plumbing (931), October 2024 through September 2026.
  • How do I look up a building permit in Tacoma?Filter the permit list on this page by month, kind of work and ZIP code to see what was issued. For one property's permits, search the city's own records by address or permit number; we don't publish addresses. How to look up a permit in Tacoma →
  • How many permits were issued in Tacoma last month?303 in September 2026, the last full month on file; 3,204 over the last 12 months.

Browse the permits

Browse 6,026 permits

Every permit in the file issued October 2024 through September 2026, newest first. Pick a month, a kind of work, a ZIP code or a status. Each row is one permit: no street address, no names.

The list loads as you reach it (6,026 permits).

IssuedKind of workCity permit typeStatusZIP

Permits each month, the last 12 months

Permits issued each month and the kind of work with the most. A month opens its permits in the list above.

MonthPermitsTop kind of work
Sep 2026303HVAC (121)
Aug 2026295HVAC (131)
Jul 2026280HVAC (114)
Jun 2026303HVAC (137)
May 2026247HVAC (108)
Apr 2026271HVAC (97)
Mar 2026282HVAC (146)
Feb 2026242HVAC (116)
Jan 2026219HVAC (101)
Dec 2025255HVAC (120)
Nov 2025204HVAC (113)
Oct 2025303HVAC (148)

Download this table (CSV)