HVAC permits in the City of Vancouver, WA

Data through August 2026 · updated 19 Oct 2026

3,325 HVAC permits were issued in the City of Vancouver, September 2024 through August 2026: about 1,662 a year and 18% of all permits. 1,724 HVAC permits in the last 12 months (Sep 2025–Aug 2026), 8% more than the 1,601 in the 12 months before. The busiest month is June.

What this file covers: Only mechanical, plumbing and electrical permits are counted: the city's public file stopped receiving most building permits in early 2025.

3,325permits issued
1,724last 12 months
Junbusiest month
19%finished
Aug 2026records through

HVAC permits by month

Permits issued each month, September 2024 through August 2026.

Sep 2024: 127Sep2024Oct 2024: 95Nov 2024: 106Dec 2024: 120Jan 2025: 124Jan2025Feb 2025: 135Mar 2025: 114Apr 2025: 126May 2025: 160Jun 2025: 199Jul 2025: 164JulAug 2025: 131Sep 2025: 140Oct 2025: 149Nov 2025: 118Dec 2025: 159Jan 2026: 133Jan2026Feb 2026: 124Mar 2026: 121Apr 2026: 121May 2026: 160Jun 2026: 204Jul 2026: 161JulAug 2026: 134
The same numbers as a table
MonthPermits
Sep 2024127
Oct 202495
Nov 2024106
Dec 2024120
Jan 2025124
Feb 2025135
Mar 2025114
Apr 2025126
May 2025160
Jun 2025199
Jul 2025164
Aug 2025131
Sep 2025140
Oct 2025149
Nov 2025118
Dec 2025159
Jan 2026133
Feb 2026124
Mar 2026121
Apr 2026121
May 2026160
Jun 2026204
Jul 2026161
Aug 2026134

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (145), November the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 93 (100 = an average month)February: 93 (100 = an average month)March: 85 (100 = an average month)April: 89 (100 = an average month)May: 115 (100 = an average month)June: 145 (100 = an average month)145July: 117 (100 = an average month)August: 96 (100 = an average month)September: 96 (100 = an average month)October: 88 (100 = an average month)November: 81 (100 = an average month)December: 101 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January93
February93
March85
April89
May115
June145
July117
August96
September96
October88
November81
December101

Download this table (CSV)

How many HVAC permits get finished

Permits issued Sep 2024–Aug 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Sep 2024–Aug 20251,601
Finished18.6%

Download this table (CSV)

Other kinds of work here

How Vancouver compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Vancouver ArcGIS Online: Permits and Code Enforcement Data (public view), Permit Data layer, read 19 Oct 2026. We count permits issued September 2024 through August 2026; denied and withdrawn permits are left out.

Mechanical, plumbing and electrical permits the City of Vancouver, Washington issues inside city limits. Building permits (new homes, remodels, additions, commercial buildings) and demolition permits are not counted: the city's public permit file stopped receiving most of them in early 2025. Water and sewer connections and right-of-way permits are not counted either. Unincorporated Clark County, Camas, Battle Ground and the other Clark County cities run their own permit offices and are not in this file, and neither is Vancouver, British Columbia.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Vancouver.
  • Only mechanical, plumbing and electrical permits are counted. Building permits nearly vanish from the city's public file after 2024, so new homes, remodels, roofing and other building work are not shown here.
  • The file had no permits issued after August 2026 when it was pulled, so the window ends there.
  • The file has no final inspection date, so we show no time to final. A permit counts as finished when the city marks it closed; many trade permits stay open in the file long after the work is done.
  • The file does not say whether a trade permit is for a home or a business, so no permit is counted as a home.
  • The file has no job value and no ZIP code we can publish, so we show no costs and no ZIP code pages.
  • Permits with the city's work type 'POR' count as other.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Vancouver, WA", https://contractorrecords.com/vancouver-wa/hvac-permits, data through August 2026, from City of Vancouver Community Development, Building Division building-permit records.

Link to a table: By month · Season · How many get finished.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share.

Common questions

  • How many HVAC permits does Vancouver issue a year?About 1,662 a year in the City of Vancouver: 3,325 permits issued September 2024 through August 2026, 1,724 of them in the last 12 months.
  • When do people in Vancouver file the most HVAC permits?June (145 against an average month of 100); November is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.