1,506 HVAC permits were issued in the City of Tigard, October 2024 through September 2026: about 753 a year and 25% of all permits. 720 HVAC permits in the last 12 months (Oct 2025–Sep 2026), 8% fewer than the 786 in the 12 months before. The busiest month is July. 97223 has the most, 858.

1,506permits issued
720last 12 months
Julbusiest month
56%finished
$15,311usual declared value
Sep 2026records through

HVAC permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 72Oct2024Nov 2024: 64Dec 2024: 57Jan 2025: 74Jan2025Feb 2025: 56Mar 2025: 64Apr 2025: 86May 2025: 51Jun 2025: 52Jul 2025: 90JulAug 2025: 73Sep 2025: 47Oct 2025: 50Nov 2025: 55Dec 2025: 60Jan 2026: 51Jan2026Feb 2026: 62Mar 2026: 61Apr 2026: 68May 2026: 66Jun 2026: 78Jul 2026: 66JulAug 2026: 50Sep 2026: 53
The same numbers as a table
MonthPermits
Oct 202472
Nov 202464
Dec 202457
Jan 202574
Feb 202556
Mar 202564
Apr 202586
May 202551
Jun 202552
Jul 202590
Aug 202573
Sep 202547
Oct 202550
Nov 202555
Dec 202560
Jan 202651
Feb 202662
Mar 202661
Apr 202668
May 202666
Jun 202678
Jul 202666
Aug 202650
Sep 202653

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (124), September the quietest (80). A busy month at the permit counter usually means a longer wait for a contractor.

January: 100 (100 = an average month)February: 94 (100 = an average month)March: 100 (100 = an average month)April: 123 (100 = an average month)May: 93 (100 = an average month)June: 104 (100 = an average month)July: 124 (100 = an average month)124August: 98 (100 = an average month)September: 80 (100 = an average month)October: 97 (100 = an average month)November: 95 (100 = an average month)December: 93 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January100
February94
March100
April123
May93
June104
July124
August98
September80
October97
November95
December93

Download this table (CSV)

How many HVAC permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025786
Finished56.1%
Expired40.7%

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 578 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$15,311
Middle half$7,041–$25,000

Download this table (CSV)

ZIP codes with the most HVAC permits

Counted at the property's ZIP code. Share is the part of the city's 1,506 HVAC permits.

ZIP codePermitsShare
9722385857%
9722460340%
97140403%
970075under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Mechanical - Alteration - Residential1,03269%
Mechanical - Alteration - Commercial22315%
Mechanical - Addition - Residential15610%
Mechanical - New Construction - Residential614%
Mechanical - New Construction - Commercial242%
Mechanical - Addition - Commercial10under 1%

Download this table (CSV)

How Tigard compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in Portland. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Tigard, TigardMaps Permitting: All Permits (ArcGIS layer), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Tigard issues inside the city limits only. King City, Beaverton, Lake Oswego, Durham and unincorporated Washington County (such as Bull Mountain outside the city) have their own permit offices and are not in this file.

  • The city's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Tigard.
  • The layer marks a permit closed but gives no final inspection date, so these pages show which permits finished but not how long they took.
  • Plumbing, mechanical and electrical permits are separate from the building permit for the same job, so one job can count several times.
  • The value is the valuation on the permit, which sets the fee. Trade permits carry none. It is not a final cost.
  • Planning and land-use cases, right-of-way and utility permits, erosion control and code-compliance cases are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in the City of Tigard, OR", https://contractorrecords.com/tigard/hvac-permits, data through September 2026, from the City of Tigard Building Division building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits: declared value · HVAC permits by ZIP code · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Tigard issue a year?About 753 a year in the City of Tigard: 1,506 permits issued October 2024 through September 2026, 720 of them in the last 12 months.
  • When do people in Tigard file the most HVAC permits?July (124 against an average month of 100); September is the quietest (80). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most HVAC permits in Tigard?97223, with 858 of the 1,506 (57%); then 97224 (603).