Home addition permits in Durham, NC

Data through September 2026 · updated 19 Oct 2026

809 home addition permits were issued in Durham, October 2024 through September 2026: about 404 a year and 9% of all permits. 370 home addition permits in the last 12 months (Oct 2025–Sep 2026), 16% fewer than the 439 in the 12 months before. The busiest month is September. The usual one took 143 days from issue to the city's final.

What this file covers: Building permits only: electrical, plumbing and mechanical permits are not in the file.

809permits issued
370last 12 months
Sepbusiest month
143days, usual issue to final
77%finished
$48,730usual declared value
Sep 2026records through

Home addition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 30Oct2024Nov 2024: 37Dec 2024: 48Jan 2025: 48Jan2025Feb 2025: 50Mar 2025: 35Apr 2025: 19May 2025: 32Jun 2025: 21Jul 2025: 40JulAug 2025: 38Sep 2025: 41Oct 2025: 40Nov 2025: 33Dec 2025: 27Jan 2026: 8Jan2026Feb 2026: 27Mar 2026: 25Apr 2026: 39May 2026: 40Jun 2026: 25Jul 2026: 35JulAug 2026: 22Sep 2026: 49
The same numbers as a table
MonthPermits
Oct 202430
Nov 202437
Dec 202448
Jan 202548
Feb 202550
Mar 202535
Apr 202519
May 202532
Jun 202521
Jul 202540
Aug 202538
Sep 202541
Oct 202540
Nov 202533
Dec 202527
Jan 20268
Feb 202627
Mar 202625
Apr 202639
May 202640
Jun 202625
Jul 202635
Aug 202622
Sep 202649

Download this table (CSV)

When home addition permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (133), June the quietest (68). A busy month at the permit counter usually means a longer wait for a contractor.

January: 83 (100 = an average month)February: 114 (100 = an average month)March: 89 (100 = an average month)April: 86 (100 = an average month)May: 107 (100 = an average month)June: 68 (100 = an average month)July: 111 (100 = an average month)August: 89 (100 = an average month)September: 133 (100 = an average month)133October: 104 (100 = an average month)November: 104 (100 = an average month)December: 111 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January83
February114
March89
April86
May107
June68
July111
August89
September133
October104
November104
December111

Download this table (CSV)

How long a home addition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 338 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025439
Finished77.0%
Usual days, issue to final143
Middle half, days75–238

Download this table (CSV)

What a home addition permit is declared at

The value written on the permit at application, from 809 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$48,730
Middle half$26,500–$125,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Addition: Single Family House68384%
Alterations: Single Family House8511%
Repair: Single Family House111%
Interior Alterations: Single Family House91%
Addition: Townhouse6under 1%
Addition: Duplex4under 1%
Addition: Accessory Structure3under 1%
Other: Accessory Structure3under 1%
Other: Single Family House1under 1%
Alterations: 5+ Residential Units1under 1%

Download this table (CSV)

Nearby permit data

Home addition permits for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City and County of Durham GIS, All Building Permits (PublicServices/Inspections MapServer layer 12; Durham Open Data), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential building permits from Durham City-County Inspections, the joint office that issues permits for the City of Durham and for unincorporated Durham County: new houses, townhouses and duplexes, additions, alterations, repairs, decks, roofs, accessory buildings and demolitions. Commercial permits and buildings of five or more units in the same file are not counted. Electrical, plumbing and mechanical permits are not in this file. Chapel Hill, Raleigh and the other Triangle towns run their own permit offices and are not in this file.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for Durham.
  • This is the building permit file only. Electrical, plumbing and mechanical permits are published only as a list of permits still open, so they are not counted.
  • The file covers the City of Durham and unincorporated Durham County together and does not say which a permit is in.
  • A permit counts as finished once the office issues its certificate of occupancy or completion; the final date is that sign-off date. The file has no expired status.
  • Solar, roofing, pools, fences and additions are sorted out of the broad alteration and repair permits by their work description. Decks count under Other.
  • The value is the building cost declared on the permit. The file has no ZIP code we can publish, so there are no ZIP code pages.
  • Each new townhouse unit gets its own permit, so new homes count units, not buildings. Townhouses are about half of the new homes.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Home addition permits in Durham, NC", https://contractorrecords.com/durham/addition-permits, data through September 2026, from Durham City-County Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Additions permits by month · Additions permits by calendar month (index) · Additions permits: days to final · Additions permits: declared value · Additions permits by permit type.

Common questions

  • How many home addition permits does Durham issue a year?About 404 a year in Durham: 809 permits issued October 2024 through September 2026, 370 of them in the last 12 months.
  • How long does a home addition permit take in Durham?The usual one took 143 days from issue to the city's final inspection, and the middle half took 75 to 238 days (338 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Durham file the most home addition permits?September (133 against an average month of 100); June is the quietest (68). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.