Garage, shed and shade structure permits in unincorporated Adams County, CO

Data through September 2026 · updated 23 Oct 2026

287 garage, shed and shade structure permits were issued in unincorporated Adams County, October 2024 through September 2026: about 144 a year and 5% of all permits. 111 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 37% fewer than the 176 in the 12 months before. The busiest month is March.

287permits issued
111last 12 months
Marbusiest month
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 12Oct2024Nov 2024: 17Dec 2024: 15Jan 2025: 6Jan2025Feb 2025: 7Mar 2025: 33Apr 2025: 14May 2025: 14Jun 2025: 16Jul 2025: 18JulAug 2025: 8Sep 2025: 16Oct 2025: 9Nov 2025: 10Dec 2025: 6Jan 2026: 13Jan2026Feb 2026: 11Mar 2026: 9Apr 2026: 9May 2026: 8Jun 2026: 15Jul 2026: 6JulAug 2026: 7Sep 2026: 8
The same numbers as a table
MonthPermits
Oct 202412
Nov 202417
Dec 202415
Jan 20256
Feb 20257
Mar 202533
Apr 202514
May 202514
Jun 202516
Jul 202518
Aug 20258
Sep 202516
Oct 20259
Nov 202510
Dec 20256
Jan 202613
Feb 202611
Mar 20269
Apr 20269
May 20268
Jun 202615
Jul 20266
Aug 20267
Sep 20268

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (176), August the quietest (63). A busy month at the permit counter usually means a longer wait for a contractor.

January: 79 (100 = an average month)February: 75 (100 = an average month)March: 176 (100 = an average month)176April: 96 (100 = an average month)May: 92 (100 = an average month)June: 130 (100 = an average month)July: 100 (100 = an average month)August: 63 (100 = an average month)September: 100 (100 = an average month)October: 88 (100 = an average month)November: 113 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January79
February75
March176
April96
May92
June130
July100
August63
September100
October88
November113
December88

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Barn - New5921%
Garage; detached - New5720%
(type of work not given)4817%
Other - New269%
Other - Addition238%
Garage; detached - Addition217%
Other - Replace197%
Other - Alteration114%
Garage; attached - Addition72%
Garage; attached - New41%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Adams County, Building Permits Eye On Adams (ArcGIS layer), read 23 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out. The county's layer leaves most permits marked Permit Issued after the work is done, so no finished share is shown.

Permits the Adams County Building Division issues for unincorporated land only, such as Welby, Sherrelwood, Berkeley, Twin Lakes, Strasburg and the rural east. Thornton, Westminster, Commerce City, Brighton, Northglenn, Federal Heights, Arvada and Aurora issue their own permits and are not in this file.

  • The county's permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Adams County.
  • The layer has no issue date, so a permit is dated by the day its case was opened; cases still in review or waiting on fees are not counted.
  • There is no job value, no final inspection date and no ZIP code in the layer, so we show no costs, no time to final and no ZIP pages.
  • The type of work is blank on about a third of permits (mostly online re-roof and furnace or air-conditioner permits); for those the kind of work is read from the permit's description.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in unincorporated Adams County, CO", https://contractorrecords.com/adams-county/accessory-permits, data through September 2026, from Adams County Community & Economic Development building-permit records.

Link to a table: By month · Season · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Adams County issue a year?About 144 a year in unincorporated Adams County: 287 permits issued October 2024 through September 2026, 111 of them in the last 12 months.
  • When do people in Adams County file the most garage, shed and shade structure permits?March (176 against an average month of 100); August is the quietest (63). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.