Data through September 2026 · updated 20 Oct 2026

225 garage, shed and shade structure permits were issued in the City of Centennial, October 2024 through September 2026: about 112 a year and 2% of all permits. 123 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 21% more than the 102 in the 12 months before. The busiest month is April. The usual one took 64 days from issue to the city's final. 80122 has the most, 63.

225permits issued
123last 12 months
Aprbusiest month
64days, usual issue to final
91%finished
$18,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 3Oct2024Nov 2024: 2Dec 2024: 4Jan 2025: 6Jan2025Feb 2025: 5Mar 2025: 11Apr 2025: 18May 2025: 12Jun 2025: 13Jul 2025: 8JulAug 2025: 9Sep 2025: 11Oct 2025: 11Nov 2025: 5Dec 2025: 7Jan 2026: 8Jan2026Feb 2026: 4Mar 2026: 14Apr 2026: 11May 2026: 11Jun 2026: 14Jul 2026: 15JulAug 2026: 13Sep 2026: 10
The same numbers as a table
MonthPermits
Oct 20243
Nov 20242
Dec 20244
Jan 20256
Feb 20255
Mar 202511
Apr 202518
May 202512
Jun 202513
Jul 20258
Aug 20259
Sep 202511
Oct 202511
Nov 20255
Dec 20257
Jan 20268
Feb 20264
Mar 202614
Apr 202611
May 202611
Jun 202614
Jul 202615
Aug 202613
Sep 202610

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (155), November the quietest (37). A busy month at the permit counter usually means a longer wait for a contractor.

January: 75 (100 = an average month)February: 48 (100 = an average month)March: 133 (100 = an average month)April: 155 (100 = an average month)155May: 123 (100 = an average month)June: 144 (100 = an average month)July: 123 (100 = an average month)August: 117 (100 = an average month)September: 112 (100 = an average month)October: 75 (100 = an average month)November: 37 (100 = an average month)December: 59 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January75
February48
March133
April155
May123
June144
July123
August117
September112
October75
November37
December59

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 93 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025102
Finished91.2%
Expired3.9%
Usual days, issue to final64
Middle half, days40–130

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 225 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$18,000
Middle half$10,000–$30,000

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 225 garage, shed and shade structure permits.

ZIP codePermitsShare
801226328%
801124821%
800153817%
800163415%
801213013%
80111125%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Deck/Pergola/Patio Cover18482%
Temporary or Accessory Structure4118%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Denver and Boulder. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Centennial ArcGIS Server, EPL_Permit (EnerGov permit table), read 20 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building, trade, fence and sign permits the City of Centennial issues inside the city limits only. Homes with a Centennial mailing address in unincorporated Arapahoe County, and the neighbouring cities of Greenwood Village, Littleton, Englewood, Lone Tree and Aurora, get their permits elsewhere and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Centennial.
  • The value is the valuation declared on the permit, which sets the fee. Many over-the-counter home permits list none or a nominal figure, so values are a guide, not a cost.
  • Hailstorms drive roofing: a storm season can double a month's permits, so roofing counts swing from year to year.
  • The city's broad 'Misc' class (EV circuits, sewer repairs, furnace swaps, siding) is sorted into trades from the short work description; anything left is a remodel or repair.
  • Homes are permits the city files as residential. Multi-family buildings and commercial work count as other.
  • A final date is the date the permit was finaled. Right-of-way, temporary use and development permits are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Centennial, CO", https://contractorrecords.com/centennial/accessory-permits, data through September 2026, from the City of Centennial Building Services building-permit records.

Link to a table: By month · Season · Days to final · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Centennial issue a year?About 112 a year in the City of Centennial: 225 permits issued October 2024 through September 2026, 123 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Centennial?The usual one took 64 days from issue to the city's final inspection, and the middle half took 40 to 130 days (93 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Centennial file the most garage, shed and shade structure permits?April (155 against an average month of 100); November is the quietest (37). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Centennial?80122, with 63 of the 225 (28%); then 80112 (48).