Contractor Records
Bend › Trades › EV Charger

Compare EV Charger Installers in Bend, OR by permit record

47 EV charger installers filed 188 EV charger permits on homes in the City of Bend from October 2023 to September 2026; 25 filed one in the last 12 months. The most active in the last 12 months were High Lakes Electric LLC (19 permits), Bright Services LLC (12) and Central Oregon Heating & Cooling Inc (7); busy is not the same as careful. Bend EV charger permits carry no filed job value, so this list compares firms on permits filed, finishing, license and recent activity only. Side by side: permits filed, share finished, license status and permits in the last 12 months for each firm. Pick what you value and the list re-orders.

Top 25 EV charger installers in Bend, OR by permit record default order · Sep 2026

#ContractorPermitsFinishedFit
  1. 1
    Bright Services LLCLicense active · 5 yrs · Bend
    4395%87FIT
  2. 2
    High Lakes Electric LLCLicense active · 8 yrs · Bend
    3285%81FIT
  3. 3
    Garner Electric CoLicense active · 30 yrs · Hillsboro
    136/867FIT
  4. 4
    Kronsberg Electric IncLicense active · 30 yrs · Redmond
    118/967FIT
  5. 5
    Sunlight Solar Energy IncLicense active · 22 yrs · Bend
    5—66FIT
  6. 6
    Central Oregon Heating & Cooling IncLicense active · 33 yrs · Redmond
    143/765FIT
  7. 7
    Wow Electric LLCLicense active · 3 yrs · Bend
    3—64FIT
  8. 8
    Apex Mechanical LLCLicense active · 9 yrs · Battle Ground
    83/563FIT
  9. 9
    Halo Electric LLCLicense active · 13 yrs · Bend
    3—63FIT
  10. 10
    Manzanita ElectricLicense not matched
    3—63FIT
  11. 11
    Bend Electric IncLicense active · 23 yrs · Bend
    3—61FIT
  12. 12
    E2 Solar Limited Liability CompanyLicense active · 2 yrs · Bend
    3—61FIT
  13. 13
    MW Construction Services IncLicense active · 2 yrs · Bend
    2—57FIT
  14. 14
    Quality Contractors IncLicense active · 41 yrs · Bend
    2—57FIT
  15. 15
    DML Electric IncLicense active · 22 yrs · Redmond
    2—54FIT
  16. 16
    National Solar IncLicense active · 18 yrs · Bend
    2—54FIT
  17. 17
    Ascend Electrical Solutions LLCLicense active · 2 yrs · Bend
    2—54FIT
  18. 18
    Aspen Ridge Electric IncLicense active · 23 yrs · Redmond
    2—50FIT
  19. 19
    An X Stream Electric LLCLicense active · 22 yrs · Bend
    2—50FIT
  20. 20
    Pro Electric LLCLicense active · 8 yrs · Redmond
    2—50FIT
  21. 21
    Von Haus Electric LLCLicense active · 6 yrs · Redmond
    2—50FIT
  22. 22
    Stanley Electric CoLicense active · 3 yrs · Bend
    2—50FIT
  23. 23
    Reinwald Electric LLCLicense active · 19 yrs · Bend
    1—48FIT
  24. 24
    Alameda Electric LLCLicense active · 14 yrs · Portland
    1—48FIT
  25. 25
    Community Electric LLCLicense active · 5 yrs · Redmond
    1—48FIT
Top 25 of 47 in the default order. The full list and the sliders load with the page.Match scores from public records, not quality ratings.

How to choose an EV charger installer in Bend, OR

  1. Shortlist from the 25 of 47 EV charger installers that filed an EV charger permit in Bend in the last 12 months.
  2. Check the license: 42 of the 47 firms here match an active license by name. Look the number up yourself with Oregon CCB license search.
  3. Bend EV charger permits carry no filed job value, so get two or three written quotes and compare them with each other.
  4. Ask about finishing: 84% of Bend EV charger permits a year or more old reached sign-off; ask a firm below that why.

Get references and proof of insurance before you sign.

Most active EV charger installers in Bend, OR, last 12 months

Top 5 by EV charger permits filed in the last 12 months. This is volume, not quality: a busy firm is not necessarily a careful one.

  1. High Lakes Electric LLC: 19 permits
  2. Bright Services LLC: 12 permits
  3. Central Oregon Heating & Cooling Inc: 7 permits
  4. Garner Electric Co: 5 permits
  5. Apex Mechanical LLC: 3 permits

EV charger permits by ZIP code in Bend

The 3 ZIP codes with the most EV charger permits on homes from October 2023 to September 2026. Each opens permits by trade and the most active firms there.

97703 (83) 97702 (68) 97701 (37)

All Bend ZIP codes →

How this list is ordered

Before you move a slider, the list is in a default order built only from the permit record: how much of each firm’s record is this kind of job (weight 30), how often its permits reached completion (25), how many permits it filed in the last 12 months (15) and how quickly its permits closed (10). Each measure is ranked against the other 47 firms and pulled toward the middle when a record is short; a firm with a matched license problem is listed last.

The order comes from the Bend permit file, not from reviews: 25 of 47 EV charger installers filed a permit in the last 12 months and 84% of their permits a year or more old were finished. Nobody pays to be listed or to move up, and there are no star ratings or reviews. The sliders and presets change the weights, and the order changes with them. How the records work in Bend.

Questions

Who are the top EV charger installers in Bend, OR?

We do not rate contractors. In this page’s default order, which uses only the permit record through Sep 2026, the top 3 are Bright Services LLC (43 permits, 95% finished), High Lakes Electric LLC (32 permits, 85% finished) and Garner Electric Co (13 permits, 6 of 8 older permits finished).

How do I compare EV charger installers in Bend, OR?

47 firms are on the list; the busiest filed 19 EV charger permits in the last 12 months and the middle firm filed 1 in the whole file. Line them up on the same public measures: permits filed, share of permits finished and license status. Pick what matters to you and the list re-orders, for example recent activity if you need someone soon. The order comes from the permit record only, and nobody pays to be listed or to move up.

How many EV charger installers are there in Bend, OR?

47 firms filed at least one EV charger permit on homes in the City of Bend from October 2023 to September 2026; 25 of them filed one in the last 12 months.

How do I look up an EV charger installer’s license in Bend, OR?

42 of the 47 EV charger installers on the Bend permit file match an active license, and 5 we could not match. A firm we could not match is not proven unlicensed: the match is by company name. Look any firm up by name or license number with Oregon CCB license search; statuses show under each firm’s name above. How to check a contractor's license in Oregon →

What should I ask an EV charger installer in Bend, OR before hiring?

Three you can check against this page: “How many EV charger permits have you filed in Bend?” (the middle firm here filed 1; 25 of 47 filed one in the last 12 months); “What does your quote include: the permit fee and the city inspection?”; “Will you pull the permit in your company’s name, and when is the final inspection?” (84% of older EV charger permits here were finished). All 10 questions and how to check each →

Where can I see an EV charger installer’s permit records in Bend, OR?

On this page: 47 firms filed 188 EV charger permits from October 2023 to September 2026, and each firm’s name opens its own permit record. Every number comes from City of Bend building, electrical, mechanical and plumbing permits on homes. To see one permit itself, search the address or permit number with the Bend permit office. How the records work in Bend →

How do I find an affordable EV charger installer in Bend, OR?

Bend EV charger permits carry no filed job value, so we can’t rank EV charger installers by price. Get two or three written quotes; ask whether the permit fee and the city inspection are included; shortlist from the 25 firms that filed in the last 12 months.

Where are the EV charger installer ratings and reviews in Bend, OR?

We do not rate or collect reviews. Instead each of the 47 EV charger installers here is shown with its permit record: 188 permits, the share finished and license status. Read reviews on other sites and use this page to check them against the record. Reviews vs permit records →

Bend, OR EV charger permit records: where they come from

Every number on this page comes from City of Bend building, electrical, mechanical and plumbing permits on homes: 47 firms filed 188 EV charger permits on homes in the City of Bend from October 2023 to September 2026, and 25 of them filed one in the last 12 months. The middle firm has 1 permit in the whole file. A short record leaves more uncertainty, and some jobs never require a permit.

No usable job value is recorded for this permit type, so no typical cost is shown. See how we compare records.

Most Bend EV charger permits are filed in July (160 against an average month of 100); November is the quietest (57). When each trade is busiest in Bend →