Data through September 2026 · updated 19 Oct 2026

254 remodel and repair permits were issued in the City of Bozeman, October 2024 through September 2026: about 127 a year and 7% of all permits. 138 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 19% more than the 116 in the 12 months before. The busiest month is June. The usual one took 135 days from issue to the city's final.

254permits issued
138last 12 months
Junbusiest month
135days, usual issue to final
93%finished
$30,000usual declared value
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 10Oct2024Nov 2024: 7Dec 2024: 3Jan 2025: 3Jan2025Feb 2025: 7Mar 2025: 10Apr 2025: 18May 2025: 8Jun 2025: 12Jul 2025: 15JulAug 2025: 11Sep 2025: 12Oct 2025: 19Nov 2025: 10Dec 2025: 8Jan 2026: 5Jan2026Feb 2026: 11Mar 2026: 8Apr 2026: 2May 2026: 8Jun 2026: 26Jul 2026: 12JulAug 2026: 15Sep 2026: 14
The same numbers as a table
MonthPermits
Oct 202410
Nov 20247
Dec 20243
Jan 20253
Feb 20257
Mar 202510
Apr 202518
May 20258
Jun 202512
Jul 202515
Aug 202511
Sep 202512
Oct 202519
Nov 202510
Dec 20258
Jan 20265
Feb 202611
Mar 20268
Apr 20262
May 20268
Jun 202626
Jul 202612
Aug 202615
Sep 202614

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (180), January the quietest (38). A busy month at the permit counter usually means a longer wait for a contractor.

January: 38 (100 = an average month)February: 85 (100 = an average month)March: 85 (100 = an average month)April: 94 (100 = an average month)May: 76 (100 = an average month)June: 180 (100 = an average month)180July: 128 (100 = an average month)August: 123 (100 = an average month)September: 123 (100 = an average month)October: 137 (100 = an average month)November: 80 (100 = an average month)December: 52 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January38
February85
March85
April94
May76
June180
July128
August123
September123
October137
November80
December52

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 108 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025116
Finished93.1%
Expired0.9%
Usual days, issue to final135
Middle half, days91–188

Download this table (CSV)

What a remodel and repair permit is declared at

The value written on the permit at application, from 246 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$30,000
Middle half$11,500–$50,804

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Res Alteration15561%
Res Reside8935%
Res Emergency Restoration94%
Window Replacement1under 1%

Download this table (CSV)

How Bozeman compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Bozeman, BP_Comm_Dev_Report_Data_view (data behind the Building Permit Data Dashboard), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Bozeman Community Development issues inside the city limits only. Belgrade, Four Corners, Bridger Canyon and the rest of Gallatin County outside the city are not in this file.

  • The city's permit data names no contractor, so there are no contractor lists, rankings or firm pages for Bozeman.
  • The city issues a project's building, electrical, mechanical and plumbing work under one permit number; each number counts once here, under the kind of project it was applied for.
  • The data has no ZIP code, so there are no ZIP pages.
  • A final date is the date every part of the permit passed final inspection or the certificate of occupancy was issued. A permit past its expiration date without a final counts as expired.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Bozeman, MT", https://contractorrecords.com/bozeman/remodel-permits, data through September 2026, from the City of Bozeman Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits: declared value · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Bozeman issue a year?About 127 a year in the City of Bozeman: 254 permits issued October 2024 through September 2026, 138 of them in the last 12 months.
  • How long does a remodel and repair permit take in Bozeman?The usual one took 135 days from issue to the city's final inspection, and the middle half took 91 to 188 days (108 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Bozeman file the most remodel and repair permits?June (180 against an average month of 100); January is the quietest (38). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.