Roofing permits in the City of Bozeman, MT

Data through September 2026 · updated 19 Oct 2026

918 roofing permits were issued in the City of Bozeman, October 2024 through September 2026: about 459 a year and 24% of all permits. 447 roofing permits in the last 12 months (Oct 2025–Sep 2026), 5% fewer than the 471 in the 12 months before. The busiest month is September. The usual one took 77 days from issue to the city's final.

918permits issued
447last 12 months
Sepbusiest month
77days, usual issue to final
100%finished
$20,803usual declared value
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 44Oct2024Nov 2024: 10Dec 2024: 10Jan 2025: 1Jan2025Feb 2025: 0Mar 2025: 10Apr 2025: 37May 2025: 33Jun 2025: 55Jul 2025: 81JulAug 2025: 60Sep 2025: 130Oct 2025: 87Nov 2025: 14Dec 2025: 6Jan 2026: 14Jan2026Feb 2026: 11Mar 2026: 33Apr 2026: 32May 2026: 36Jun 2026: 37Jul 2026: 59JulAug 2026: 55Sep 2026: 63
The same numbers as a table
MonthPermits
Oct 202444
Nov 202410
Dec 202410
Jan 20251
Feb 20250
Mar 202510
Apr 202537
May 202533
Jun 202555
Jul 202581
Aug 202560
Sep 2025130
Oct 202587
Nov 202514
Dec 20256
Jan 202614
Feb 202611
Mar 202633
Apr 202632
May 202636
Jun 202637
Jul 202659
Aug 202655
Sep 202663

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (252), February the quietest (14). A busy month at the permit counter usually means a longer wait for a contractor.

January: 20 (100 = an average month)February: 14 (100 = an average month)March: 56 (100 = an average month)April: 90 (100 = an average month)May: 90 (100 = an average month)June: 120 (100 = an average month)July: 183 (100 = an average month)August: 150 (100 = an average month)September: 252 (100 = an average month)252October: 171 (100 = an average month)November: 31 (100 = an average month)December: 21 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January20
February14
March56
April90
May90
June120
July183
August150
September252
October171
November31
December21

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 471 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025471
Finished100.0%
Expired0.0%
Usual days, issue to final77
Middle half, days43–119

Download this table (CSV)

What a roofing permit is declared at

The value written on the permit at application, from 917 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$20,803
Middle half$15,147–$26,000

Download this table (CSV)

How Bozeman compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Bozeman, BP_Comm_Dev_Report_Data_view (data behind the Building Permit Data Dashboard), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Bozeman Community Development issues inside the city limits only. Belgrade, Four Corners, Bridger Canyon and the rest of Gallatin County outside the city are not in this file.

  • The city's permit data names no contractor, so there are no contractor lists, rankings or firm pages for Bozeman.
  • The city issues a project's building, electrical, mechanical and plumbing work under one permit number; each number counts once here, under the kind of project it was applied for.
  • The data has no ZIP code, so there are no ZIP pages.
  • A final date is the date every part of the permit passed final inspection or the certificate of occupancy was issued. A permit past its expiration date without a final counts as expired.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in the City of Bozeman, MT", https://contractorrecords.com/bozeman/roofing-permits, data through September 2026, from the City of Bozeman Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits: declared value.

Common questions

  • How many roofing permits does Bozeman issue a year?About 459 a year in the City of Bozeman: 918 permits issued October 2024 through September 2026, 447 of them in the last 12 months.
  • How long does a roofing permit take in Bozeman?The usual one took 77 days from issue to the city's final inspection, and the middle half took 43 to 119 days (471 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Bozeman file the most roofing permits?September (252 against an average month of 100); February is the quietest (14). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.