Solar permits in the City of Bozeman, MT

Data through September 2026 · updated 19 Oct 2026

587 solar permits were issued in the City of Bozeman, October 2024 through September 2026: about 294 a year and 16% of all permits. 235 solar permits in the last 12 months (Oct 2025–Sep 2026), 33% fewer than the 352 in the 12 months before. The busiest month is October. The usual one took 34 days from issue to the city's final.

587permits issued
235last 12 months
Octbusiest month
34days, usual issue to final
100%finished
$14,887usual declared value
Sep 2026records through

Solar permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 56Oct2024Nov 2024: 13Dec 2024: 20Jan 2025: 33Jan2025Feb 2025: 8Mar 2025: 19Apr 2025: 7May 2025: 13Jun 2025: 63Jul 2025: 62JulAug 2025: 22Sep 2025: 36Oct 2025: 64Nov 2025: 46Dec 2025: 19Jan 2026: 4Jan2026Feb 2026: 12Mar 2026: 7Apr 2026: 17May 2026: 13Jun 2026: 7Jul 2026: 24JulAug 2026: 13Sep 2026: 9
The same numbers as a table
MonthPermits
Oct 202456
Nov 202413
Dec 202420
Jan 202533
Feb 20258
Mar 202519
Apr 20257
May 202513
Jun 202563
Jul 202562
Aug 202522
Sep 202536
Oct 202564
Nov 202546
Dec 202519
Jan 20264
Feb 202612
Mar 20267
Apr 202617
May 202613
Jun 20267
Jul 202624
Aug 202613
Sep 20269

Download this table (CSV)

When solar permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (245), February the quietest (41). A busy month at the permit counter usually means a longer wait for a contractor.

January: 76 (100 = an average month)February: 41 (100 = an average month)March: 53 (100 = an average month)April: 49 (100 = an average month)May: 53 (100 = an average month)June: 143 (100 = an average month)July: 176 (100 = an average month)August: 72 (100 = an average month)September: 92 (100 = an average month)October: 245 (100 = an average month)245November: 121 (100 = an average month)December: 80 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January76
February41
March53
April49
May53
June143
July176
August72
September92
October245
November121
December80

Download this table (CSV)

How long a solar permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 352 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025352
Finished100.0%
Expired0.0%
Usual days, issue to final34
Middle half, days19–66

Download this table (CSV)

What a solar permit is declared at

The value written on the permit at application, from 583 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$14,887
Middle half$9,432–$22,952

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Solar Electrical Res Permit55094%
Solar Electrical Com Permit376%

Download this table (CSV)

How Bozeman compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Bozeman, BP_Comm_Dev_Report_Data_view (data behind the Building Permit Data Dashboard), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Bozeman Community Development issues inside the city limits only. Belgrade, Four Corners, Bridger Canyon and the rest of Gallatin County outside the city are not in this file.

  • The city's permit data names no contractor, so there are no contractor lists, rankings or firm pages for Bozeman.
  • The city issues a project's building, electrical, mechanical and plumbing work under one permit number; each number counts once here, under the kind of project it was applied for.
  • The data has no ZIP code, so there are no ZIP pages.
  • A final date is the date every part of the permit passed final inspection or the certificate of occupancy was issued. A permit past its expiration date without a final counts as expired.
  • The value is the valuation on the permit, which sets the fee. It is not a final cost.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Solar permits in the City of Bozeman, MT", https://contractorrecords.com/bozeman/solar-permits, data through September 2026, from the City of Bozeman Community Development building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: days to final · Solar permits: declared value · Solar permits by permit type.

Common questions

  • How many solar permits does Bozeman issue a year?About 294 a year in the City of Bozeman: 587 permits issued October 2024 through September 2026, 235 of them in the last 12 months.
  • How long does a solar permit take in Bozeman?The usual one took 34 days from issue to the city's final inspection, and the middle half took 19 to 66 days (352 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Bozeman file the most solar permits?October (245 against an average month of 100); February is the quietest (41). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.