How much does foundation work cost in Cary? The usual foundation & crawl space job filed with Cary is $12,083, from 618 priced permits (October 2023 through September 2026); the middle half of firms file between $8,250 and $13,123. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual foundation & crawl space job filed with Cary is $12,083, from 618 priced permits, October 2023 through September 2026. The middle half of firms usually file between $8,250 and $13,123. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A foundation & crawl space permit here usually takes 66 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 618 priced permits across 69 firms, pooled into one. Half of Cary foundation & crawl space permits were filed between $7,300 and $18,200.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $4,300 | 1 in 10 permits filed below |
| 25th | $7,300 | 1 in 4 filed below |
| 50th | $12,000 | the middle permit |
| 75th | $18,200 | 1 in 4 filed above |
| 90th | $25,800 | 1 in 10 filed above |
Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Wake County parcel values.
| Firms working on | Usual home value | Usual filed value | Firms | Permits |
|---|---|---|---|---|
| Lower third | under $559,450 | $12,800 | 21 | 85 |
| Middle third | $559,450–$664,376 | $14,500 | 22 | 381 |
| Upper third | $675,163 and up | $8,250 | 22 | 150 |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| Groundworks North Carolina | 231 | 89 | $14,500 | $9,595–$20,288 | 66.1% |
| Carolina Basement Systems LLC | 46 | 19 | $12,745 | $8,548–$17,014 | 62.3% |
| Foundation Pro NC, LLC | 18 | 18 | $13,184 | $9,958–$16,062 | — |
| Foundation Solutions,LLC | 51 | 12 | $6,630 | $4,154–$13,068 | 95.7% |
| Atlantic Foundation & Repair | 31 | 12 | $8,975 | $5,930–$17,650 | 91.1% |
| Advanced Structural Repair | 23 | 8 | $11,500 | $6,737–$17,819 | 93.1% |
| Elite Construction Holdings | 6 | 6 | $10,605 | $9,241–$15,211 | — |
| Triangle Reconstruction | 32 | 5 | $12,800 | $9,787–$18,662 | 92.0% |
| Bolin Enterprises, Inc. | 20 | 5 | $15,000 | $7,150–$19,050 | 62.6% |
| Foundation Xperts, LLC | 17 | 5 | $10,650 | $7,100–$14,800 | 80.0% |
Line your quote up against the file. In Cary, 1 in 10 foundation & crawl space filed values sit under $4,300, the middle half between $7,300 and $18,200, and 1 in 10 over $25,800.
Cary files the fewest foundation & crawl space permits in December (62 against an average month of 100) and the most in June (156). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cary →
Source: Town of Cary building permit applications (issued permits only). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Cary →
Foundation & Crawl Space cost in other cities: St. Louis San Diego Colorado Springs Greensboro Arlington, VA Palo Alto Denton San Francisco Wheaton, IL Marin County (unincorporated)
Other job costs in Cary: HVAC · EV Charger · Remodel & Repair · Water Heater · Electrical · Deck, Porch & Sunroom · New Home · Plumbing · Solar · Addition · Gas Line · Pool & Hot Tub · Irrigation · Generator · Demolition