How much does EV charger installation cost in Cary? The usual EV charger job filed with Cary is $1,104, from 2,922 priced permits (October 2023 through September 2026); the middle half of firms file between $1,000 and $1,400. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$1,104usual filed value
$1,000–$1,400middle half of firms' usual jobs
2,922priced permits (100% of 2,922)
244firms on file
17days, permit issue to final
Sep 2026records through

How much does EV charger installation cost in Cary?

The usual EV charger job filed with Cary is $1,104, from 2,922 priced permits, October 2023 through September 2026. The middle half of firms usually file between $1,000 and $1,400. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An EV charger permit here usually takes 17 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 2,922 priced permits across 244 firms, pooled into one. Half of Cary EV charger permits were filed between $1,000 and $1,400.

PercentileFiled valueReads as
10th$7801 in 10 permits filed below
25th$1,0001 in 4 filed below
50th$1,100the middle permit
75th$1,4001 in 4 filed above
90th$1,9001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Wake County parcel values.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $701,510$1,30672454
Middle third$701,510–$852,936$1,150732,236
Upper third$854,792 and up$1,20073201

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Triad Electrical Serv702214$1,150$1,100–$1,35099.4%
Triangle Electric42998$1,000$1,00082.9%
NC Express Services LLC9844$1,200$1,200–$1,50099.4%
Cockrell's Electrical Services14426$1,000$1,00091.0%
Steady Hand Electrical, LLC4323$1,250$1,183–$1,32999.6%
Tidal Electrical Services Inc.2620$1,516$1,385–$1,7066 of 6
Cape Fear Solar Systems LLC3317$1,400$1,400–$1,46799.3%
Roy Electric LLC4415$1,200$1,000–$1,60096.2%
Touchstone Electric Rdu, LLC1815$1,350$1,200–$1,500—
Wiretech Company LLC6814$1,923$1,616–$2,64099.2%

Why filed values run low or high

  • The 10 busiest firms usually file $1,150; the 193 firms with fewer than 10 permits usually file $1,117.
  • Firms working on the most expensive third of homes (usual home value $854,792 and up) usually file $1,200, against $1,306 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 EV charger permits is filed under $780 and 1 in 10 over $1,900, 2 times as much.
  • 100.0% of the 2,922 permits carry a value; the 0 without one are left out of every figure here.

Is your quote normal? Compare it with 2,922 filed values

Line your quote up against the file. In Cary, 1 in 10 EV charger filed values sit under $780, the middle half between $1,000 and $1,400, and 1 in 10 over $1,900.

  • $2,500Above $1,900: higher than 9 in 10 filed values for this work in Cary.
  • $1,104Right at the usual $1,104: in the middle of the file.
  • $540Below $780: lower than 9 in 10. Ask what the quote leaves out.

When to schedule EV charger installation in Cary

Cary files the fewest EV charger permits in March (85 against an average month of 100) and the most in October (118). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cary →

How these numbers are made

Source: Town of Cary building permit applications (issued permits only). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Cary →

Common questions

  • How many quotes should I get for an EV charger job in Cary?At least three. In the permit record the middle half of Cary EV charger firms usually file between $1,000 and $1,400 a job, so two ordinary firms can sit 1.4 times apart and both be normal for Cary. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for EV charger jobs in Cary?Half of permits were filed between $1,000 and $1,400; 8 in 10 between $780 and $1,900. These are approximate, pooled from each firm's own spread.
  • How much do EV charger installers charge in Cary?The usual EV charger job is filed at $1,104; the middle half of firms usually file between $1,000 and $1,400. The 10 firms with the most permits in the last 12 months usually file $1,150, about the same as the usual. See every firm's usual job →
  • Do bigger houses get bigger bills?Not in the file: firms working on the upper third of homes by value usually file $1,200, the lower third $1,306.
  • Where does this data come from?Town of Cary building permit applications (issued permits only), read October 2026. How the records work in Cary →

EV Charger cost in other cities: Naperville Burlington, VT Elk Grove Marin County (unincorporated) Sacramento County (unincorporated)

Other job costs in Cary: HVAC · Remodel & Repair · Water Heater · Electrical · Deck, Porch & Sunroom · New Home · Plumbing · Foundation & Crawl Space · Solar · Addition · Gas Line · Pool & Hot Tub · Irrigation · Generator · Demolition