How much does EV charger installation cost in Cary? The usual EV charger job filed with Cary is $1,104, from 2,922 priced permits (October 2023 through September 2026); the middle half of firms file between $1,000 and $1,400. A filed value is what the contractor wrote on the permit, not a quote or the final bill.
The usual EV charger job filed with Cary is $1,104, from 2,922 priced permits, October 2023 through September 2026. The middle half of firms usually file between $1,000 and $1,400. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. An EV charger permit here usually takes 17 days from issue to final inspection. How long permits take →
Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 2,922 priced permits across 244 firms, pooled into one. Half of Cary EV charger permits were filed between $1,000 and $1,400.
| Percentile | Filed value | Reads as |
|---|---|---|
| 10th | $780 | 1 in 10 permits filed below |
| 25th | $1,000 | 1 in 4 filed below |
| 50th | $1,100 | the middle permit |
| 75th | $1,400 | 1 in 4 filed above |
| 90th | $1,900 | 1 in 10 filed above |
Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Wake County parcel values.
| Firms working on | Usual home value | Usual filed value | Firms | Permits |
|---|---|---|---|---|
| Lower third | under $701,510 | $1,306 | 72 | 454 |
| Middle third | $701,510–$852,936 | $1,150 | 73 | 2,236 |
| Upper third | $854,792 and up | $1,200 | 73 | 201 |
Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in. Busy is not the same as careful: pick what you value to build a list.
| Firm | Permits | Last 12 mo | Usual | Middle half | Finished |
|---|---|---|---|---|---|
| Triad Electrical Serv | 702 | 214 | $1,150 | $1,100–$1,350 | 99.4% |
| Triangle Electric | 429 | 98 | $1,000 | $1,000 | 82.9% |
| NC Express Services LLC | 98 | 44 | $1,200 | $1,200–$1,500 | 99.4% |
| Cockrell's Electrical Services | 144 | 26 | $1,000 | $1,000 | 91.0% |
| Steady Hand Electrical, LLC | 43 | 23 | $1,250 | $1,183–$1,329 | 99.6% |
| Tidal Electrical Services Inc. | 26 | 20 | $1,516 | $1,385–$1,706 | 6 of 6 |
| Cape Fear Solar Systems LLC | 33 | 17 | $1,400 | $1,400–$1,467 | 99.3% |
| Roy Electric LLC | 44 | 15 | $1,200 | $1,000–$1,600 | 96.2% |
| Touchstone Electric Rdu, LLC | 18 | 15 | $1,350 | $1,200–$1,500 | — |
| Wiretech Company LLC | 68 | 14 | $1,923 | $1,616–$2,640 | 99.2% |
Line your quote up against the file. In Cary, 1 in 10 EV charger filed values sit under $780, the middle half between $1,000 and $1,400, and 1 in 10 over $1,900.
Cary files the fewest EV charger permits in March (85 against an average month of 100) and the most in October (118). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cary →
Source: Town of Cary building permit applications (issued permits only). The window is October 2023 through September 2026; a permit filed after that isn't here yet.
Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.
The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.
Nobody paid to be on this page and nobody can. How the records work in Cary →
EV Charger cost in other cities: Naperville Burlington, VT Elk Grove Marin County (unincorporated) Sacramento County (unincorporated)
Other job costs in Cary: HVAC · Remodel & Repair · Water Heater · Electrical · Deck, Porch & Sunroom · New Home · Plumbing · Foundation & Crawl Space · Solar · Addition · Gas Line · Pool & Hot Tub · Irrigation · Generator · Demolition