Contractor Records
Home › Cary › Gas Line cost

Gas Line Installation Cost in Cary, NC: what the permits say

How much does gas line installation cost in Cary? The usual gas line job filed with Cary is $1,691, from 262 priced permits (October 2023 through September 2026); the middle half of firms file between $1,750 and $3,392. A filed value is what the contractor wrote on the permit, not a quote or the final bill.

$1,691usual filed value
$1,750–$3,392middle half of firms' usual jobs
262priced permits (99% of 264)
107firms on file
27days, permit issue to final
Sep 2026records through

How much does gas line installation cost in Cary?

The usual gas line job filed with Cary is $1,691, from 262 priced permits, October 2023 through September 2026. The middle half of firms usually file between $1,750 and $3,392. Half of jobs were filed for less, half for more. A filed value is what the contractor wrote on the permit, not a quote or the final bill. A gas line permit here usually takes 27 days from issue to final inspection. How long permits take →

What the spread looks like

Approximately, from each firm's own spread: every firm's range of filed values, weighted by its 262 priced permits across 106 firms, pooled into one. Half of Cary gas line permits were filed between $1,100 and $2,600.

PercentileFiled valueReads as
10th$8101 in 10 permits filed below
25th$1,1001 in 4 filed below
50th$1,700the middle permit
75th$2,6001 in 4 filed above
90th$4,9001 in 10 filed above

By home value

Firms split into thirds by the usual value of the homes they work on, with each third's usual filed value weighted by permits. Home values: Wake County parcel values.

Firms working onUsual home valueUsual filed valueFirmsPermits
Lower thirdunder $553,911$2,0003147
Middle third$553,911–$692,715$2,00031153
Upper third$696,045 and up$1,7753149

Busiest firms and what they usually charge

Top 10 by permits in the last 12 months. Usual is each firm's middle filed value; middle half is the range its middle half of jobs were filed in; both are shown for firms with 5 or more priced permits. Busy is not the same as careful: pick what you value to build a list.

FirmPermitsLast 12 moUsualMiddle halfFinished
Apostle Service Group LLC3911$2,000$1,500–$2,72586.0%
Cary Plumbing Co.3611$1,187$1,087–$1,35296.2%
Mr. Smokestack Chimney Service175$4,400$3,200–$7,25085.8%
L. G. Jordan Oil Co., Inc.92$1,500$1,400–$2,2007 of 7
Casey Services HVAC, Inc.52$1,200$1,200—
Streamline Services52$4,818$3,800–$5,191—
Blanton's Air, Plumbing & Elec42———
JD Service Now, Inc.42———
CDK Plumbing & Drains32———
Gas Pro LLC32———

Why filed values run low or high

  • The 10 busiest firms usually file $2,000; the 103 firms with fewer than 10 permits usually file $1,753.
  • Firms working on the most expensive third of homes (usual home value $696,045 and up) usually file $1,775, against $2,000 for the least expensive third.
  • One permit type covers small and large jobs: 1 in 10 gas line permits is filed under $810 and 1 in 10 over $4,900, 6 times as much.
  • 99.2% of the 264 permits carry a value; the 2 without one are left out of every figure here.

Is your quote normal? Compare it with 262 filed values

Line your quote up against the file. In Cary, 1 in 10 gas line filed values sit under $810, the middle half between $1,100 and $2,600, and 1 in 10 over $4,900.

  • $6,300Above $4,900: higher than 9 in 10 filed values for this work in Cary.
  • $1,691Right at the usual $1,691: in the middle of the file.
  • $570Below $810: lower than 9 in 10. Ask what the quote leaves out.

When to schedule gas line work in Cary

Cary files the fewest gas line permits in August (50 against an average month of 100) and the most in May (136). If you can choose, ask for quotes in a quiet month. We have no prices by month, so this is about crews' schedules, not a discount. When each trade is busiest in Cary →

How these numbers are made

Source: Town of Cary building permit applications (issued permits only). The window is October 2023 through September 2026; a permit filed after that isn't here yet.

Usual is the middle permit: half were filed for less, half for more. Only permits with a filed value count; a value of $0 or none is left out.

The spread is approximate: we keep seven points of each firm's own range of filed values, not every permit, and pool them.

Nobody paid to be on this page and nobody can. How the records work in Cary →

Common questions

  • How many quotes should I get for a gas line job in Cary?At least three. In the permit record the middle half of Cary gas line firms usually file between $1,750 and $3,392 a job, so two ordinary firms can sit 1.9 times apart and both be normal for Cary. A third quote shows which one is the outlier. Filed values are what contractors wrote on permits, not quotes, so use them to judge the spread, not to price your own job.
  • What range is normal for gas line jobs in Cary?Half of permits were filed between $1,100 and $2,600; 8 in 10 between $810 and $4,900. These are approximate, pooled from each firm's own spread.
  • How much do gas line contractors charge in Cary?The usual gas line job is filed at $1,691; the middle half of firms usually file between $1,750 and $3,392. The 10 firms with the most permits in the last 12 months usually file $2,000, more than the usual. See every firm's usual job →
  • Do bigger houses get bigger bills?Not in the file: firms working on the upper third of homes by value usually file $1,775, the lower third $2,000.
  • Where does this data come from?Town of Cary building permit applications (issued permits only), read October 2026. How the records work in Cary →

Gas Line cost in other cities: Denton

Other job costs in Cary: HVAC · EV Charger · Remodel & Repair · Water Heater · Electrical · Deck, Porch & Sunroom · New Home · Plumbing · Foundation & Crawl Space · Solar · Addition · Pool & Hot Tub · Irrigation · Generator · Demolition