Data through September 2026 · updated 19 Oct 2026

391 garage, shed and shade structure permits were issued in the City of Charleston, October 2024 through September 2026: about 196 a year and 5% of all permits. 186 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 205 in the 12 months before. The busiest month is October. 29492 has the most, 85.

What this file covers: The city's layer holds building permits only, so trade permits are few.

391permits issued
186last 12 months
Octbusiest month
44%finished
$10,400usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 25Oct2024Nov 2024: 19Dec 2024: 11Jan 2025: 5Jan2025Feb 2025: 18Mar 2025: 13Apr 2025: 15May 2025: 16Jun 2025: 15Jul 2025: 20JulAug 2025: 20Sep 2025: 28Oct 2025: 28Nov 2025: 9Dec 2025: 17Jan 2026: 13Jan2026Feb 2026: 14Mar 2026: 21Apr 2026: 13May 2026: 20Jun 2026: 14Jul 2026: 13JulAug 2026: 11Sep 2026: 13
The same numbers as a table
MonthPermits
Oct 202425
Nov 202419
Dec 202411
Jan 20255
Feb 202518
Mar 202513
Apr 202515
May 202516
Jun 202515
Jul 202520
Aug 202520
Sep 202528
Oct 202528
Nov 20259
Dec 202517
Jan 202613
Feb 202614
Mar 202621
Apr 202613
May 202620
Jun 202614
Jul 202613
Aug 202611
Sep 202613

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (163), January the quietest (55). A busy month at the permit counter usually means a longer wait for a contractor.

January: 55 (100 = an average month)February: 98 (100 = an average month)March: 104 (100 = an average month)April: 86 (100 = an average month)May: 110 (100 = an average month)June: 89 (100 = an average month)July: 101 (100 = an average month)August: 95 (100 = an average month)September: 126 (100 = an average month)October: 163 (100 = an average month)163November: 86 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January55
February98
March104
April86
May110
June89
July101
August95
September126
October163
November86
December86

Download this table (CSV)

How many garage, shed and shade structure permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025205
Finished43.9%
Expired0.0%

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 387 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$10,400
Middle half$2,600–$46,000

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 391 garage, shed and shade structure permits.

ZIP codePermitsShare
294928522%
294077920%
294126216%
294144411%
294034211%
294554010%
29401379%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Accessory Structure - Residential Uninhabitable19851%
Accessory Structure - Residential Inhabitable10828%
Accessory Structure - Sub - Residential8522%

Download this table (CSV)

How these numbers are made

Source: City of Charleston GIS, Permits All Issued (Dashboard View), EnerGov layer External/Applications 1134, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Charleston Department of Permitting & Inspections issues inside the city limits only: the Peninsula, West Ashley, James Island, Johns Island, Daniel Island and Cainhoy parts of the city. North Charleston, Mount Pleasant, Summerville and unincorporated Charleston County run their own permit offices and are not in this file. Business-license certificates of occupancy, tree removal, rental registrations and sidewalk dining permits are left out.

  • The city's public permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Charleston.
  • The layer holds building permits only: the city's separate electrical, plumbing and mechanical permits are not published, so trade counts come only from single-family alteration permits whose description names one trade (roofing above all) and are far below the real number of trade jobs.
  • The value is the valuation on the permit application, which sets the fee. It is not a final cost.
  • Many permits stay marked Issued after the work passed its final inspection. A permit counts as finished if the city marked it Completed, recorded a finaled date or recorded a passed final inspection; only those with a finaled date add days.
  • Permits the city marked void or that were cancelled or denied are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in the City of Charleston, SC", https://contractorrecords.com/charleston-sc/accessory-permits, data through September 2026, from the City of Charleston Department of Permitting & Inspections building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: finished share · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Charleston issue a year?About 196 a year in the City of Charleston: 391 permits issued October 2024 through September 2026, 186 of them in the last 12 months.
  • When do people in Charleston file the most garage, shed and shade structure permits?October (163 against an average month of 100); January is the quietest (55). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Charleston?29492, with 85 of the 391 (22%); then 29407 (79).