Demolition permits in the City of Charleston, SC

Data through September 2026 · updated 19 Oct 2026

479 demolition permits were issued in the City of Charleston, October 2024 through September 2026: about 240 a year and 6% of all permits. 241 demolition permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 238 in the 12 months before. The busiest month is May. 29403 has the most, 159.

What this file covers: The city's layer holds building permits only, so trade permits are few.

479permits issued
241last 12 months
Maybusiest month
12%finished
$8,000usual declared value
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 19Oct2024Nov 2024: 21Dec 2024: 16Jan 2025: 13Jan2025Feb 2025: 25Mar 2025: 21Apr 2025: 22May 2025: 24Jun 2025: 19Jul 2025: 25JulAug 2025: 15Sep 2025: 18Oct 2025: 17Nov 2025: 15Dec 2025: 19Jan 2026: 23Jan2026Feb 2026: 18Mar 2026: 18Apr 2026: 17May 2026: 28Jun 2026: 24Jul 2026: 22JulAug 2026: 22Sep 2026: 18
The same numbers as a table
MonthPermits
Oct 202419
Nov 202421
Dec 202416
Jan 202513
Feb 202525
Mar 202521
Apr 202522
May 202524
Jun 202519
Jul 202525
Aug 202515
Sep 202518
Oct 202517
Nov 202515
Dec 202519
Jan 202623
Feb 202618
Mar 202618
Apr 202617
May 202628
Jun 202624
Jul 202622
Aug 202622
Sep 202618

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). May is the busiest (130), December the quietest (88). A busy month at the permit counter usually means a longer wait for a contractor.

January: 90 (100 = an average month)February: 108 (100 = an average month)March: 98 (100 = an average month)April: 98 (100 = an average month)May: 130 (100 = an average month)130June: 108 (100 = an average month)July: 118 (100 = an average month)August: 93 (100 = an average month)September: 90 (100 = an average month)October: 90 (100 = an average month)November: 90 (100 = an average month)December: 88 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January90
February108
March98
April98
May130
June108
July118
August93
September90
October90
November90
December88

Download this table (CSV)

How many demolition permits get finished

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Oct 2024–Sep 2025238
Finished12.2%
Expired0.4%

Download this table (CSV)

What a demolition permit is declared at

The value written on the permit at application, from 474 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$8,000
Middle half$3,500–$20,000

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 479 demolition permits.

ZIP codePermitsShare
2940315933%
2940112927%
294076814%
29412286%
29455163%
29492133%
29414133%
2940582%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Demolition - Interior/Non-Structural30764%
Demolition - Complete11524%
Demolition - Partial5311%
Demolition - Interior Structural4under 1%

Download this table (CSV)

How these numbers are made

Source: City of Charleston GIS, Permits All Issued (Dashboard View), EnerGov layer External/Applications 1134, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Building permits the City of Charleston Department of Permitting & Inspections issues inside the city limits only: the Peninsula, West Ashley, James Island, Johns Island, Daniel Island and Cainhoy parts of the city. North Charleston, Mount Pleasant, Summerville and unincorporated Charleston County run their own permit offices and are not in this file. Business-license certificates of occupancy, tree removal, rental registrations and sidewalk dining permits are left out.

  • The city's public permit layer names no contractor, so there are no contractor lists, rankings or firm pages for Charleston.
  • The layer holds building permits only: the city's separate electrical, plumbing and mechanical permits are not published, so trade counts come only from single-family alteration permits whose description names one trade (roofing above all) and are far below the real number of trade jobs.
  • The value is the valuation on the permit application, which sets the fee. It is not a final cost.
  • Many permits stay marked Issued after the work passed its final inspection. A permit counts as finished if the city marked it Completed, recorded a finaled date or recorded a passed final inspection; only those with a finaled date add days.
  • Permits the city marked void or that were cancelled or denied are not counted.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in the City of Charleston, SC", https://contractorrecords.com/charleston-sc/demolition-permits, data through September 2026, from the City of Charleston Department of Permitting & Inspections building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: finished share · Demolition permits: declared value · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Charleston issue a year?About 240 a year in the City of Charleston: 479 permits issued October 2024 through September 2026, 241 of them in the last 12 months.
  • When do people in Charleston file the most demolition permits?May (130 against an average month of 100); December is the quietest (88). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Charleston?29403, with 159 of the 479 (33%); then 29401 (129).