Contractor Records
Home › Charlottesville › Electrical

Electrical permits in Charlottesville, VA

Data through November 2024 · updated 19 Oct 2026

924 electrical permits were issued in Charlottesville, December 2022 through November 2024: about 462 a year and 28% of all permits. 479 electrical permits in the last 12 months on file (Dec 2023–Nov 2024), 8% more than the 445 in the 12 months before. The busiest month is March.

924permits issued
479last 12 months on file
Marbusiest month
60%finished
Nov 2024records through

Electrical permits by month

Permits issued each month, December 2022 through November 2024.

Dec 2022: 23Dec2022Jan 2023: 37Jan2023Feb 2023: 27Mar 2023: 43Apr 2023: 34May 2023: 33Jun 2023: 45Jul 2023: 52JulAug 2023: 48Sep 2023: 44Oct 2023: 30Nov 2023: 29Dec 2023: 40Jan 2024: 31Jan2024Feb 2024: 35Mar 2024: 52Apr 2024: 40May 2024: 48Jun 2024: 36Jul 2024: 28JulAug 2024: 44Sep 2024: 35Oct 2024: 53Nov 2024: 37
The same numbers as a table
MonthPermits
Dec 202223
Jan 202337
Feb 202327
Mar 202343
Apr 202334
May 202333
Jun 202345
Jul 202352
Aug 202348
Sep 202344
Oct 202330
Nov 202329
Dec 202340
Jan 202431
Feb 202435
Mar 202452
Apr 202440
May 202448
Jun 202436
Jul 202428
Aug 202444
Sep 202435
Oct 202453
Nov 202437

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). March is the busiest (123), February the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 88 (100 = an average month)February: 81 (100 = an average month)March: 123 (100 = an average month)123April: 96 (100 = an average month)May: 105 (100 = an average month)June: 105 (100 = an average month)July: 104 (100 = an average month)August: 119 (100 = an average month)September: 103 (100 = an average month)October: 108 (100 = an average month)November: 86 (100 = an average month)December: 82 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January88
February81
March123
April96
May105
June105
July104
August119
September103
October108
November86
December82

Download this table (CSV)

How many electrical permits get finished

Permits issued Dec 2022–Nov 2023, at least 12 months before the file ends.

MeasureValue
Permits issued Dec 2022–Nov 2023445
Finished59.6%
Expired4.9%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
R-ELECOTH15617%
B-WIRING12013%
R-ELECALT9811%
R-ELECNEW879%
C-ELECOTH697%
R-ELECCHNG667%
R-ELECUPGD556%
R-VEHCHRG404%
C-ELECALT374%
C-ELECNEW263%

Download this table (CSV)

How Charlottesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Charlottesville Open Data, Planning (Building Permits 2023) table (OpenData_2 MapServer/33), read 19 Oct 2026. We count permits issued December 2022 through November 2024; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing, gas and demolition permits the City of Charlottesville issued inside the city. Albemarle County, which surrounds the city, runs its own permit office and is not in this file. Zoning, planning, traffic, engineering and fire-marshal records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Charlottesville.
  • The city's open file stops recording issue dates in December 2024: permits applied for since then are listed but carry no issue date, so these pages end with November 2024.
  • The city moved to a new permit system in May 2023; permits issued before then come from records converted from the old system, whose work types are coded differently, so the mix of kinds of work shifts a little at that point.
  • Finished means the city's status is Closed. The file has no final inspection date, so we show no time to final; a closed permit may in a few cases have been closed without a final inspection. Cancelled permits are not counted.
  • The file's valuation field is blank (zero) on every permit and it has no ZIP code, so we show no costs and no ZIP pages.
  • Homes are the permits the city files under its residential permit types, plus converted older records whose building use is a one- or two-family dwelling.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Charlottesville, VA", https://contractorrecords.com/charlottesville/electrical-permits, data through November 2024, from City of Charlottesville Neighborhood Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits by permit type.

Common questions

  • How many electrical permits does Charlottesville issue a year?About 462 a year in Charlottesville: 924 permits issued December 2022 through November 2024, 479 of them in the last 12 months on file (to November 2024).
  • When do people in Charlottesville file the most electrical permits?March (123 against an average month of 100); February is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.