Data through November 2024 · updated 19 Oct 2026
219 solar permits were issued in Charlottesville, December 2022 through November 2024: about 110 a year and 7% of all permits. 85 solar permits in the last 12 months on file (Dec 2023–Nov 2024), 37% fewer than the 134 in the 12 months before. The busiest month is July.
Permits issued each month, December 2022 through November 2024.
| Month | Permits |
|---|---|
| Dec 2022 | 17 |
| Jan 2023 | 8 |
| Feb 2023 | 8 |
| Mar 2023 | 5 |
| Apr 2023 | 14 |
| May 2023 | 8 |
| Jun 2023 | 15 |
| Jul 2023 | 16 |
| Aug 2023 | 8 |
| Sep 2023 | 17 |
| Oct 2023 | 12 |
| Nov 2023 | 6 |
| Dec 2023 | 4 |
| Jan 2024 | 7 |
| Feb 2024 | 5 |
| Mar 2024 | 3 |
| Apr 2024 | 6 |
| May 2024 | 7 |
| Jun 2024 | 4 |
| Jul 2024 | 10 |
| Aug 2024 | 8 |
| Sep 2024 | 4 |
| Oct 2024 | 12 |
| Nov 2024 | 15 |
By calendar month, 100 = an average month (the thin line). July is the busiest (142), March the quietest (44). A busy month at the permit counter usually means a longer wait for a contractor.
| Month | Index |
|---|---|
| January | 82 |
| February | 71 |
| March | 44 |
| April | 110 |
| May | 82 |
| June | 104 |
| July | 142 |
| August | 88 |
| September | 115 |
| October | 132 |
| November | 115 |
| December | 115 |
Permits issued Dec 2022–Nov 2023, at least 12 months before the file ends.
| Measure | Value |
|---|---|
| Permits issued Dec 2022–Nov 2023 | 134 |
| Finished | 49.3% |
| Expired | 3.7% |
How the city filed these permits. We group its types into kinds of work; this is the split.
| Permit type | Permits | Share |
|---|---|---|
| R-SOLARPV | 145 | 66% |
| B-WIREPV | 45 | 21% |
| B-SOLPVWIR | 11 | 5% |
| B-SOLPVPAN | 9 | 4% |
| C-SOLARPV | 8 | 4% |
| C-SOLAR | 1 | under 1% |
Electrical (924)Plumbing (715)HVAC (472)Remodels & repairs (262)
From our cross-city data studies: the same measure, read the same way, for every city we cover.
Source: Charlottesville Open Data, Planning (Building Permits 2023) table (OpenData_2 MapServer/33), read 19 Oct 2026. We count permits issued December 2022 through November 2024; denied and withdrawn permits are left out.
Building, electrical, mechanical, plumbing, gas and demolition permits the City of Charlottesville issued inside the city. Albemarle County, which surrounds the city, runs its own permit office and is not in this file. Zoning, planning, traffic, engineering and fire-marshal records are left out.
Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →
Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:
Contractor Records, "Solar permits in Charlottesville, VA", https://contractorrecords.com/charlottesville/solar-permits, data through November 2024, from City of Charlottesville Neighborhood Development Services building-permit records.Link to a table: By month · Season · How many get finished · Permit types.
Download the tables (CSV): Solar permits by month · Solar permits by calendar month (index) · Solar permits: finished share · Solar permits by permit type.