Plumbing permits in Charlottesville, VA

Data through November 2024 · updated 19 Oct 2026

715 plumbing permits were issued in Charlottesville, December 2022 through November 2024: about 358 a year and 22% of all permits. 374 plumbing permits in the last 12 months on file (Dec 2023–Nov 2024), 10% more than the 341 in the 12 months before. The busiest month is June.

715permits issued
374last 12 months on file
Junbusiest month
65%finished
Nov 2024records through

Plumbing permits by month

Permits issued each month, December 2022 through November 2024.

Dec 2022: 26Dec2022Jan 2023: 23Jan2023Feb 2023: 30Mar 2023: 38Apr 2023: 20May 2023: 28Jun 2023: 39Jul 2023: 16JulAug 2023: 30Sep 2023: 39Oct 2023: 27Nov 2023: 25Dec 2023: 27Jan 2024: 35Jan2024Feb 2024: 26Mar 2024: 36Apr 2024: 41May 2024: 34Jun 2024: 37Jul 2024: 25JulAug 2024: 33Sep 2024: 32Oct 2024: 23Nov 2024: 25
The same numbers as a table
MonthPermits
Dec 202226
Jan 202323
Feb 202330
Mar 202338
Apr 202320
May 202328
Jun 202339
Jul 202316
Aug 202330
Sep 202339
Oct 202327
Nov 202325
Dec 202327
Jan 202435
Feb 202426
Mar 202436
Apr 202441
May 202434
Jun 202437
Jul 202425
Aug 202433
Sep 202432
Oct 202423
Nov 202425

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (128), July the quietest (69). A busy month at the permit counter usually means a longer wait for a contractor.

January: 97 (100 = an average month)February: 94 (100 = an average month)March: 124 (100 = an average month)April: 102 (100 = an average month)May: 104 (100 = an average month)June: 128 (100 = an average month)128July: 69 (100 = an average month)August: 106 (100 = an average month)September: 119 (100 = an average month)October: 84 (100 = an average month)November: 84 (100 = an average month)December: 89 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January97
February94
March124
April102
May104
June128
July69
August106
September119
October84
November84
December89

Download this table (CSV)

How many plumbing permits get finished

Permits issued Dec 2022–Nov 2023, at least 12 months before the file ends.

MeasureValue
Permits issued Dec 2022–Nov 2023341
Finished65.1%
Expired3.2%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
R-PLMBALT13719%
R-PLMBOTH11015%
R-PLMBNEW639%
R-GASOTH548%
C-PLMBALT497%
R-SEWERLAT395%
R-WATERLAT375%
C-PLMBOTH335%
B-GASLINE233%
R-GASADD193%

Download this table (CSV)

How Charlottesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Charlottesville Open Data, Planning (Building Permits 2023) table (OpenData_2 MapServer/33), read 19 Oct 2026. We count permits issued December 2022 through November 2024; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing, gas and demolition permits the City of Charlottesville issued inside the city. Albemarle County, which surrounds the city, runs its own permit office and is not in this file. Zoning, planning, traffic, engineering and fire-marshal records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Charlottesville.
  • The city's open file stops recording issue dates in December 2024: permits applied for since then are listed but carry no issue date, so these pages end with November 2024.
  • The city moved to a new permit system in May 2023; permits issued before then come from records converted from the old system, whose work types are coded differently, so the mix of kinds of work shifts a little at that point.
  • Finished means the city's status is Closed. The file has no final inspection date, so we show no time to final; a closed permit may in a few cases have been closed without a final inspection. Cancelled permits are not counted.
  • The file's valuation field is blank (zero) on every permit and it has no ZIP code, so we show no costs and no ZIP pages.
  • Homes are the permits the city files under its residential permit types, plus converted older records whose building use is a one- or two-family dwelling.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in Charlottesville, VA", https://contractorrecords.com/charlottesville/plumbing-permits, data through November 2024, from City of Charlottesville Neighborhood Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Charlottesville issue a year?About 358 a year in Charlottesville: 715 permits issued December 2022 through November 2024, 374 of them in the last 12 months on file (to November 2024).
  • When do people in Charlottesville file the most plumbing permits?June (128 against an average month of 100); July is the quietest (69). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.