Remodel and repair permits in Charlottesville, VA

Data through November 2024 · updated 19 Oct 2026

262 remodel and repair permits were issued in Charlottesville, December 2022 through November 2024: about 131 a year and 8% of all permits. 199 remodel and repair permits in the last 12 months on file (Dec 2023–Nov 2024), 216% more than the 63 in the 12 months before. The busiest month is September.

262permits issued
199last 12 months on file
Sepbusiest month
Nov 2024records through

Remodel and repair permits by month

Permits issued each month, December 2022 through November 2024.

Dec 2022: 1Dec2022Jan 2023: 0Jan2023Feb 2023: 0Mar 2023: 2Apr 2023: 2May 2023: 1Jun 2023: 1Jul 2023: 9JulAug 2023: 9Sep 2023: 16Oct 2023: 8Nov 2023: 14Dec 2023: 12Jan 2024: 10Jan2024Feb 2024: 17Mar 2024: 16Apr 2024: 12May 2024: 11Jun 2024: 16Jul 2024: 13JulAug 2024: 25Sep 2024: 23Oct 2024: 26Nov 2024: 18
The same numbers as a table
MonthPermits
Dec 20221
Jan 20230
Feb 20230
Mar 20232
Apr 20232
May 20231
Jun 20231
Jul 20239
Aug 20239
Sep 202316
Oct 20238
Nov 202314
Dec 202312
Jan 202410
Feb 202417
Mar 202416
Apr 202412
May 202411
Jun 202416
Jul 202413
Aug 202425
Sep 202423
Oct 202426
Nov 202418

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (179), January the quietest (46). A busy month at the permit counter usually means a longer wait for a contractor.

January: 46 (100 = an average month)February: 78 (100 = an average month)March: 82 (100 = an average month)April: 64 (100 = an average month)May: 55 (100 = an average month)June: 78 (100 = an average month)July: 101 (100 = an average month)August: 156 (100 = an average month)September: 179 (100 = an average month)179October: 156 (100 = an average month)November: 147 (100 = an average month)December: 60 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January46
February78
March82
April64
May55
June78
July101
August156
September179
October156
November147
December60

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
R-INTRENO17366%
R-BLDGOTH5019%
R-BASEMENT2710%
R-NEWCO42%
R-FOUND42%
B-INTREN1under 1%
R-AMEND1under 1%
R-ASBEST1under 1%
R-CHIMNEY1under 1%

Download this table (CSV)

How these numbers are made

Source: Charlottesville Open Data, Planning (Building Permits 2023) table (OpenData_2 MapServer/33), read 19 Oct 2026. We count permits issued December 2022 through November 2024; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing, gas and demolition permits the City of Charlottesville issued inside the city. Albemarle County, which surrounds the city, runs its own permit office and is not in this file. Zoning, planning, traffic, engineering and fire-marshal records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Charlottesville.
  • The city's open file stops recording issue dates in December 2024: permits applied for since then are listed but carry no issue date, so these pages end with November 2024.
  • The city moved to a new permit system in May 2023; permits issued before then come from records converted from the old system, whose work types are coded differently, so the mix of kinds of work shifts a little at that point.
  • Finished means the city's status is Closed. The file has no final inspection date, so we show no time to final; a closed permit may in a few cases have been closed without a final inspection. Cancelled permits are not counted.
  • The file's valuation field is blank (zero) on every permit and it has no ZIP code, so we show no costs and no ZIP pages.
  • Homes are the permits the city files under its residential permit types, plus converted older records whose building use is a one- or two-family dwelling.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Charlottesville, VA", https://contractorrecords.com/charlottesville/remodel-permits, data through November 2024, from City of Charlottesville Neighborhood Development Services building-permit records.

Link to a table: By month · Season · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Charlottesville issue a year?About 131 a year in Charlottesville: 262 permits issued December 2022 through November 2024, 199 of them in the last 12 months on file (to November 2024).
  • When do people in Charlottesville file the most remodel and repair permits?September (179 against an average month of 100); January is the quietest (46). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.