HVAC permits in Charlottesville, VA

Data through November 2024 · updated 19 Oct 2026

472 HVAC permits were issued in Charlottesville, December 2022 through November 2024: about 236 a year and 14% of all permits. 258 HVAC permits in the last 12 months on file (Dec 2023–Nov 2024), 21% more than the 214 in the 12 months before. The busiest month is October.

472permits issued
258last 12 months on file
Octbusiest month
69%finished
Nov 2024records through

HVAC permits by month

Permits issued each month, December 2022 through November 2024.

Dec 2022: 16Dec2022Jan 2023: 9Jan2023Feb 2023: 19Mar 2023: 19Apr 2023: 22May 2023: 19Jun 2023: 16Jul 2023: 15JulAug 2023: 19Sep 2023: 22Oct 2023: 24Nov 2023: 14Dec 2023: 28Jan 2024: 16Jan2024Feb 2024: 14Mar 2024: 29Apr 2024: 8May 2024: 24Jun 2024: 14Jul 2024: 34JulAug 2024: 29Sep 2024: 23Oct 2024: 26Nov 2024: 13
The same numbers as a table
MonthPermits
Dec 202216
Jan 20239
Feb 202319
Mar 202319
Apr 202322
May 202319
Jun 202316
Jul 202315
Aug 202319
Sep 202322
Oct 202324
Nov 202314
Dec 202328
Jan 202416
Feb 202414
Mar 202429
Apr 20248
May 202424
Jun 202414
Jul 202434
Aug 202429
Sep 202423
Oct 202426
Nov 202413

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (127), January the quietest (64). A busy month at the permit counter usually means a longer wait for a contractor.

January: 64 (100 = an average month)February: 84 (100 = an average month)March: 122 (100 = an average month)April: 76 (100 = an average month)May: 109 (100 = an average month)June: 76 (100 = an average month)July: 125 (100 = an average month)August: 122 (100 = an average month)September: 114 (100 = an average month)October: 127 (100 = an average month)127November: 69 (100 = an average month)December: 112 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January64
February84
March122
April76
May109
June76
July125
August122
September114
October127
November69
December112

Download this table (CSV)

How many HVAC permits get finished

Permits issued Dec 2022–Nov 2023, at least 12 months before the file ends.

MeasureValue
Permits issued Dec 2022–Nov 2023214
Finished68.7%
Expired6.1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
R-HEATPUMP8117%
R-MINISPLT6013%
R-MECHOTH4510%
R-MSYSOTH368%
R-DUCTWORK327%
R-MECHCO286%
C-MECHOTH276%
B-INSTHP204%
B-CONVERT204%
B-REPHVAC174%

Download this table (CSV)

How Charlottesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: Charlottesville Open Data, Planning (Building Permits 2023) table (OpenData_2 MapServer/33), read 19 Oct 2026. We count permits issued December 2022 through November 2024; denied and withdrawn permits are left out.

Building, electrical, mechanical, plumbing, gas and demolition permits the City of Charlottesville issued inside the city. Albemarle County, which surrounds the city, runs its own permit office and is not in this file. Zoning, planning, traffic, engineering and fire-marshal records are left out.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Charlottesville.
  • The city's open file stops recording issue dates in December 2024: permits applied for since then are listed but carry no issue date, so these pages end with November 2024.
  • The city moved to a new permit system in May 2023; permits issued before then come from records converted from the old system, whose work types are coded differently, so the mix of kinds of work shifts a little at that point.
  • Finished means the city's status is Closed. The file has no final inspection date, so we show no time to final; a closed permit may in a few cases have been closed without a final inspection. Cancelled permits are not counted.
  • The file's valuation field is blank (zero) on every permit and it has no ZIP code, so we show no costs and no ZIP pages.
  • Homes are the permits the city files under its residential permit types, plus converted older records whose building use is a one- or two-family dwelling.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Charlottesville, VA", https://contractorrecords.com/charlottesville/hvac-permits, data through November 2024, from City of Charlottesville Neighborhood Development Services building-permit records.

Link to a table: By month · Season · How many get finished · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Charlottesville issue a year?About 236 a year in Charlottesville: 472 permits issued December 2022 through November 2024, 258 of them in the last 12 months on file (to November 2024).
  • When do people in Charlottesville file the most HVAC permits?October (127 against an average month of 100); January is the quietest (64). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.