Contractor Records
Home › Durham › Garages, sheds & shade structures

Garage, shed and shade structure permits in Durham, NC

Data through September 2026 · updated 19 Oct 2026

233 garage, shed and shade structure permits were issued in Durham, October 2024 through September 2026: about 116 a year and 3% of all permits. 111 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 9% fewer than the 122 in the 12 months before. The busiest month is July. The usual one took 86 days from issue to the city's final.

What this file covers: Building permits only: electrical, plumbing and mechanical permits are not in the file.

233permits issued
111last 12 months
Julbusiest month
86days, usual issue to final
66%finished
$19,000usual declared value
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 11Oct2024Nov 2024: 11Dec 2024: 7Jan 2025: 6Jan2025Feb 2025: 12Mar 2025: 11Apr 2025: 7May 2025: 12Jun 2025: 9Jul 2025: 10JulAug 2025: 15Sep 2025: 11Oct 2025: 11Nov 2025: 6Dec 2025: 13Jan 2026: 5Jan2026Feb 2026: 4Mar 2026: 8Apr 2026: 9May 2026: 8Jun 2026: 7Jul 2026: 18JulAug 2026: 9Sep 2026: 13
The same numbers as a table
MonthPermits
Oct 202411
Nov 202411
Dec 20247
Jan 20256
Feb 202512
Mar 202511
Apr 20257
May 202512
Jun 20259
Jul 202510
Aug 202515
Sep 202511
Oct 202511
Nov 20256
Dec 202513
Jan 20265
Feb 20264
Mar 20268
Apr 20269
May 20268
Jun 20267
Jul 202618
Aug 20269
Sep 202613

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (144), January the quietest (57). A busy month at the permit counter usually means a longer wait for a contractor.

January: 57 (100 = an average month)February: 82 (100 = an average month)March: 98 (100 = an average month)April: 82 (100 = an average month)May: 103 (100 = an average month)June: 82 (100 = an average month)July: 144 (100 = an average month)144August: 124 (100 = an average month)September: 124 (100 = an average month)October: 113 (100 = an average month)November: 88 (100 = an average month)December: 103 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January57
February82
March98
April82
May103
June82
July144
August124
September124
October113
November88
December103

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 80 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025122
Finished65.6%
Usual days, issue to final86
Middle half, days49–162

Download this table (CSV)

What a garage, shed and shade structure permit is declared at

The value written on the permit at application, from 232 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$19,000
Middle half$9,300–$37,000

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Other: Accessory Structure10545%
New: Accessory Structure8336%
Alterations: Single Family House3113%
Alterations: Accessory Structure42%
Interior Alterations: Single Family House31%
Alterations: Accessory Dwelling2under 1%
Repair: Single Family House2under 1%
Other: Accessory Dwelling1under 1%
Replacement: Accessory Structure1under 1%
Other: Single Family House1under 1%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Raleigh–Durham. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City and County of Durham GIS, All Building Permits (PublicServices/Inspections MapServer layer 12; Durham Open Data), read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential building permits from Durham City-County Inspections, the joint office that issues permits for the City of Durham and for unincorporated Durham County: new houses, townhouses and duplexes, additions, alterations, repairs, decks, roofs, accessory buildings and demolitions. Commercial permits and buildings of five or more units in the same file are not counted. Electrical, plumbing and mechanical permits are not in this file. Chapel Hill, Raleigh and the other Triangle towns run their own permit offices and are not in this file.

  • The file names no contractor, so there are no contractor lists, rankings or firm pages for Durham.
  • This is the building permit file only. Electrical, plumbing and mechanical permits are published only as a list of permits still open, so they are not counted.
  • The file covers the City of Durham and unincorporated Durham County together and does not say which a permit is in.
  • A permit counts as finished once the office issues its certificate of occupancy or completion; the final date is that sign-off date. The file has no expired status.
  • Solar, roofing, pools, fences and additions are sorted out of the broad alteration and repair permits by their work description. Decks count under Other.
  • The value is the building cost declared on the permit. The file has no ZIP code we can publish, so there are no ZIP code pages.
  • Each new townhouse unit gets its own permit, so new homes count units, not buildings. Townhouses are about half of the new homes.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Durham, NC", https://contractorrecords.com/durham/accessory-permits, data through September 2026, from Durham City-County Inspections building-permit records.

Link to a table: By month · Season · Days to final · Declared value · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits: declared value · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Durham issue a year?About 116 a year in Durham: 233 permits issued October 2024 through September 2026, 111 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Durham?The usual one took 86 days from issue to the city's final inspection, and the middle half took 49 to 162 days (80 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Durham file the most garage, shed and shade structure permits?July (144 against an average month of 100); January is the quietest (57). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.