Garage, shed and shade structure permits in Fort Myers, FL

Data through September 2026 · updated 19 Oct 2026

372 garage, shed and shade structure permits were issued in Fort Myers, October 2024 through September 2026: about 186 a year and 4% of all permits. 176 garage, shed and shade structure permits in the last 12 months (Oct 2025–Sep 2026), 10% fewer than the 196 in the 12 months before. The busiest month is September. The usual one took 62 days from issue to the city's final. 33901 has the most, 97.

372permits issued
176last 12 months
Sepbusiest month
62days, usual issue to final
96%finished
Sep 2026records through

Garage, shed and shade structure permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 12Oct2024Nov 2024: 14Dec 2024: 23Jan 2025: 12Jan2025Feb 2025: 18Mar 2025: 16Apr 2025: 14May 2025: 19Jun 2025: 19Jul 2025: 11JulAug 2025: 18Sep 2025: 20Oct 2025: 16Nov 2025: 16Dec 2025: 13Jan 2026: 16Jan2026Feb 2026: 16Mar 2026: 15Apr 2026: 8May 2026: 14Jun 2026: 16Jul 2026: 13JulAug 2026: 16Sep 2026: 17
The same numbers as a table
MonthPermits
Oct 202412
Nov 202414
Dec 202423
Jan 202512
Feb 202518
Mar 202516
Apr 202514
May 202519
Jun 202519
Jul 202511
Aug 202518
Sep 202520
Oct 202516
Nov 202516
Dec 202513
Jan 202616
Feb 202616
Mar 202615
Apr 20268
May 202614
Jun 202616
Jul 202613
Aug 202616
Sep 202617

Download this table (CSV)

When garage, shed and shade structure permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (119), April the quietest (71). A busy month at the permit counter usually means a longer wait for a contractor.

January: 90 (100 = an average month)February: 110 (100 = an average month)March: 100 (100 = an average month)April: 71 (100 = an average month)May: 106 (100 = an average month)June: 113 (100 = an average month)July: 77 (100 = an average month)August: 110 (100 = an average month)September: 119 (100 = an average month)119October: 90 (100 = an average month)November: 97 (100 = an average month)December: 116 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January90
February110
March100
April71
May106
June113
July77
August110
September119
October90
November97
December116

Download this table (CSV)

How long a garage, shed and shade structure permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 187 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025196
Finished96.4%
Expired2.6%
Usual days, issue to final62
Middle half, days29–120

Download this table (CSV)

ZIP codes with the most garage, shed and shade structure permits

Counted at the property's ZIP code. Share is the part of the city's 372 garage, shed and shade structure permits.

ZIP codePermitsShare
339019726%
339139124%
339167019%
339056618%
33912185%
33966133%
33919113%
339073under 1%
339713under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Aluminum Structure: 1&2 Family18449%
Sheds/Utility Structure: 1&2 Family14840%
Garage/Carport: 1&2 Family4011%

Download this table (CSV)

Nearby permit data

Garage, shed and shade structure permits for other places in Southwest Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Fort Myers, EnerGov Citizen Self Service public permit search, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Fort Myers issues for one- and two-family homes inside city limits: re-roofs, air-conditioner change-outs, plumbing, electrical, solar, windows, doors and shutters, pools, fences, screen enclosures and new houses. Commercial and multi-family permits, signs, events and right-of-way work are not counted. Unincorporated Lee County, Cape Coral, Bonita Springs and Estero run their own permit offices and are not in this file.

  • The city's public permit search shows no contractor, so there are no contractor lists, rankings or firm pages for Fort Myers.
  • The search results carry no job value, so we show no costs.
  • A final date is the day the city finaled the permit. Permits the city marks Closed count as finished but add no days.
  • These rows come from the city's public permit search, which the city's website terms describe as public information that is generally available to copy or distribute.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Garage, shed and shade structure permits in Fort Myers, FL", https://contractorrecords.com/fort-myers/accessory-permits, data through September 2026, from the City of Fort Myers Community Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Garages, sheds & shade structures permits by month · Garages, sheds & shade structures permits by calendar month (index) · Garages, sheds & shade structures permits: days to final · Garages, sheds & shade structures permits by ZIP code · Garages, sheds & shade structures permits by permit type.

Common questions

  • How many garage, shed and shade structure permits does Fort Myers issue a year?About 186 a year in Fort Myers: 372 permits issued October 2024 through September 2026, 176 of them in the last 12 months.
  • How long does a garage, shed and shade structure permit take in Fort Myers?The usual one took 62 days from issue to the city's final inspection, and the middle half took 29 to 120 days (187 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Fort Myers file the most garage, shed and shade structure permits?September (119 against an average month of 100); April is the quietest (71). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most garage, shed and shade structure permits in Fort Myers?33901, with 97 of the 372 (26%); then 33913 (91).