Contractor Records
Home › Fort Myers › Remodels & repairs

Remodel and repair permits in Fort Myers, FL

Data through September 2026 · updated 19 Oct 2026

2,059 remodel and repair permits were issued in Fort Myers, October 2024 through September 2026: about 1,030 a year and 24% of all permits. 854 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), 29% fewer than the 1,205 in the 12 months before. The busiest month is April. The usual one took 53 days from issue to the city's final. 33913 has the most, 576.

2,059permits issued
854last 12 months
Aprbusiest month
53days, usual issue to final
96%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 76Oct2024Nov 2024: 88Dec 2024: 89Jan 2025: 88Jan2025Feb 2025: 94Mar 2025: 105Apr 2025: 127May 2025: 128Jun 2025: 125Jul 2025: 113JulAug 2025: 94Sep 2025: 78Oct 2025: 67Nov 2025: 56Dec 2025: 53Jan 2026: 56Jan2026Feb 2026: 55Mar 2026: 78Apr 2026: 112May 2026: 69Jun 2026: 83Jul 2026: 87JulAug 2026: 77Sep 2026: 61
The same numbers as a table
MonthPermits
Oct 202476
Nov 202488
Dec 202489
Jan 202588
Feb 202594
Mar 2025105
Apr 2025127
May 2025128
Jun 2025125
Jul 2025113
Aug 202594
Sep 202578
Oct 202567
Nov 202556
Dec 202553
Jan 202656
Feb 202655
Mar 202678
Apr 2026112
May 202669
Jun 202683
Jul 202687
Aug 202677
Sep 202661

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (139), September the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 84 (100 = an average month)February: 87 (100 = an average month)March: 107 (100 = an average month)April: 139 (100 = an average month)139May: 115 (100 = an average month)June: 121 (100 = an average month)July: 117 (100 = an average month)August: 100 (100 = an average month)September: 81 (100 = an average month)October: 83 (100 = an average month)November: 84 (100 = an average month)December: 83 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January84
February87
March107
April139
May115
June121
July117
August100
September81
October83
November84
December83

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,139 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20251,205
Finished95.6%
Expired1.7%
Usual days, issue to final53
Middle half, days29–94

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 2,059 remodel and repair permits.

ZIP codePermitsShare
3391357628%
3390149724%
3391643521%
339661959%
339051266%
339121156%
33971502%
33919462%
3390714under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Windows/Doors: 1&2 Family89844%
Shutter: 1&2 Family63431%
Renovation: Single Family41220%
Garage Door Replacement: 1&2 Family593%
Other/Siding (OTC): 1&2 Family422%
Duplex Renovation: 1&2 Family5under 1%
FBC: 1&2 Family Home5under 1%
Renovation: Single Family Attached4under 1%

Download this table (CSV)

How Fort Myers compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Southwest Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Fort Myers, EnerGov Citizen Self Service public permit search, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Fort Myers issues for one- and two-family homes inside city limits: re-roofs, air-conditioner change-outs, plumbing, electrical, solar, windows, doors and shutters, pools, fences, screen enclosures and new houses. Commercial and multi-family permits, signs, events and right-of-way work are not counted. Unincorporated Lee County, Cape Coral, Bonita Springs and Estero run their own permit offices and are not in this file.

  • The city's public permit search shows no contractor, so there are no contractor lists, rankings or firm pages for Fort Myers.
  • The search results carry no job value, so we show no costs.
  • A final date is the day the city finaled the permit. Permits the city marks Closed count as finished but add no days.
  • These rows come from the city's public permit search, which the city's website terms describe as public information that is generally available to copy or distribute.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Fort Myers, FL", https://contractorrecords.com/fort-myers/remodel-permits, data through September 2026, from the City of Fort Myers Community Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Fort Myers issue a year?About 1,030 a year in Fort Myers: 2,059 permits issued October 2024 through September 2026, 854 of them in the last 12 months.
  • How long does a remodel and repair permit take in Fort Myers?The usual one took 53 days from issue to the city's final inspection, and the middle half took 29 to 94 days (1,139 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Fort Myers file the most remodel and repair permits?April (139 against an average month of 100); September is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Fort Myers?33913, with 576 of the 2,059 (28%); then 33901 (497).