Roofing permits in Fort Myers, FL

Data through September 2026 · updated 19 Oct 2026

1,343 roofing permits were issued in Fort Myers, October 2024 through September 2026: about 672 a year and 16% of all permits. 347 roofing permits in the last 12 months (Oct 2025–Sep 2026), 65% fewer than the 996 in the 12 months before. The busiest month is October. The usual one took 56 days from issue to the city's final. 33905 has the most, 427.

1,343permits issued
347last 12 months
Octbusiest month
56days, usual issue to final
98%finished
Sep 2026records through

Roofing permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 266Oct2024Nov 2024: 56Dec 2024: 63Jan 2025: 188Jan2025Feb 2025: 56Mar 2025: 59Apr 2025: 60May 2025: 58Jun 2025: 61Jul 2025: 46JulAug 2025: 44Sep 2025: 39Oct 2025: 49Nov 2025: 22Dec 2025: 23Jan 2026: 24Jan2026Feb 2026: 35Mar 2026: 29Apr 2026: 38May 2026: 42Jun 2026: 24Jul 2026: 20JulAug 2026: 20Sep 2026: 21
The same numbers as a table
MonthPermits
Oct 2024266
Nov 202456
Dec 202463
Jan 2025188
Feb 202556
Mar 202559
Apr 202560
May 202558
Jun 202561
Jul 202546
Aug 202544
Sep 202539
Oct 202549
Nov 202522
Dec 202523
Jan 202624
Feb 202635
Mar 202629
Apr 202638
May 202642
Jun 202624
Jul 202620
Aug 202620
Sep 202621

Download this table (CSV)

When roofing permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (281), September the quietest (54). A busy month at the permit counter usually means a longer wait for a contractor.

January: 189 (100 = an average month)February: 81 (100 = an average month)March: 79 (100 = an average month)April: 88 (100 = an average month)May: 89 (100 = an average month)June: 76 (100 = an average month)July: 59 (100 = an average month)August: 57 (100 = an average month)September: 54 (100 = an average month)October: 281 (100 = an average month)281November: 70 (100 = an average month)December: 77 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January189
February81
March79
April88
May89
June76
July59
August57
September54
October281
November70
December77

Download this table (CSV)

How long a roofing permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 978 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025996
Finished98.5%
Expired1.1%
Usual days, issue to final56
Middle half, days24–133

Download this table (CSV)

ZIP codes with the most roofing permits

Counted at the property's ZIP code. Share is the part of the city's 1,343 roofing permits.

ZIP codePermitsShare
3390542732%
3390137928%
3391625919%
3391315311%
33966343%
33912302%
33971272%
33919181%
33907161%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Re-Roof: 1&2 Family1,32599%
Roof: 1&2 Family181%

Download this table (CSV)

How Fort Myers compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Roofing permits for other places in Southwest Florida. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Fort Myers, EnerGov Citizen Self Service public permit search, read 19 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Permits the City of Fort Myers issues for one- and two-family homes inside city limits: re-roofs, air-conditioner change-outs, plumbing, electrical, solar, windows, doors and shutters, pools, fences, screen enclosures and new houses. Commercial and multi-family permits, signs, events and right-of-way work are not counted. Unincorporated Lee County, Cape Coral, Bonita Springs and Estero run their own permit offices and are not in this file.

  • The city's public permit search shows no contractor, so there are no contractor lists, rankings or firm pages for Fort Myers.
  • The search results carry no job value, so we show no costs.
  • A final date is the day the city finaled the permit. Permits the city marks Closed count as finished but add no days.
  • These rows come from the city's public permit search, which the city's website terms describe as public information that is generally available to copy or distribute.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Roofing permits in Fort Myers, FL", https://contractorrecords.com/fort-myers/roofing-permits, data through September 2026, from the City of Fort Myers Community Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Roofing permits by month · Roofing permits by calendar month (index) · Roofing permits: days to final · Roofing permits by ZIP code · Roofing permits by permit type.

Common questions

  • How many roofing permits does Fort Myers issue a year?About 672 a year in Fort Myers: 1,343 permits issued October 2024 through September 2026, 347 of them in the last 12 months.
  • How long does a roofing permit take in Fort Myers?The usual one took 56 days from issue to the city's final inspection, and the middle half took 24 to 133 days (978 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Fort Myers file the most roofing permits?October (281 against an average month of 100); September is the quietest (54). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most roofing permits in Fort Myers?33905, with 427 of the 1,343 (32%); then 33901 (379).