Remodel and repair permits in the City of Gainesville, FL

Data through July 2026 · updated 19 Oct 2026

1,555 remodel and repair permits were issued in the City of Gainesville, August 2024 through July 2026: about 778 a year and 9% of all permits. 790 remodel and repair permits in the last 12 months on file (Aug 2025–Jul 2026), 3% more than the 765 in the 12 months before. The busiest month is July. The usual one took 55 days from issue to the city's final. 32605 has the most, 601.

1,555permits issued
790last 12 months on file
Julbusiest month
55days, usual issue to final
86%finished
Jul 2026records through

Remodel and repair permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 74Aug2024Sep 2024: 59Oct 2024: 69Nov 2024: 57Dec 2024: 53Jan 2025: 63Jan2025Feb 2025: 58Mar 2025: 59Apr 2025: 51May 2025: 62Jun 2025: 70Jul 2025: 90JulAug 2025: 51Sep 2025: 71Oct 2025: 75Nov 2025: 50Dec 2025: 59Jan 2026: 60Jan2026Feb 2026: 58Mar 2026: 86Apr 2026: 50May 2026: 83Jun 2026: 69Jul 2026: 78Jul
The same numbers as a table
MonthPermits
Aug 202474
Sep 202459
Oct 202469
Nov 202457
Dec 202453
Jan 202563
Feb 202558
Mar 202559
Apr 202551
May 202562
Jun 202570
Jul 202590
Aug 202551
Sep 202571
Oct 202575
Nov 202550
Dec 202559
Jan 202660
Feb 202658
Mar 202686
Apr 202650
May 202683
Jun 202669
Jul 202678

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (130), April the quietest (78). A busy month at the permit counter usually means a longer wait for a contractor.

January: 95 (100 = an average month)February: 90 (100 = an average month)March: 112 (100 = an average month)April: 78 (100 = an average month)May: 112 (100 = an average month)June: 107 (100 = an average month)July: 130 (100 = an average month)130August: 96 (100 = an average month)September: 100 (100 = an average month)October: 111 (100 = an average month)November: 83 (100 = an average month)December: 86 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January95
February90
March112
April78
May112
June107
July130
August96
September100
October111
November83
December86

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends. Usual days is the middle permit among the 631 with a final date.

MeasureValue
Permits issued Aug 2024–Jul 2025765
Finished86.5%
Expired0.0%
Usual days, issue to final55
Middle half, days31–103

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 1,555 remodel and repair permits.

ZIP codePermitsShare
3260560139%
3265323815%
3260716210%
3260115810%
3260915110%
32641795%
32606674%
32608584%
32603413%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Building: Windows and Doors95461%
Building: Alteration44328%
Building: Repair15810%

Download this table (CSV)

How Gainesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Gainesville, Gainesville Permit Cases (ArcGIS Online, table All_Permit_Cases), read 19 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Gainesville issues inside city limits. Unincorporated Alachua County and the other towns in the county (Alachua, High Springs, Newberry and others) have their own permit offices and are not in this file.

  • The file names no contractor company (only the license holder's personal name), so there are no contractor lists, rankings or firm pages here.
  • The file has no declared job value, so we show no costs.
  • The city loaded this permit table once, on July 31, 2026, and it has not been updated since, so the window ends in July 2026.
  • Each trade on a job gets its own permit: a new house usually has a building permit plus separate electrical, mechanical, plumbing and gas permits. Those trade permits are counted under their trade.
  • A final date is the date the city closed the permit. Homes versus other property comes from the parcel's land-use code on the county tax roll, and the ZIP code from the same roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in the City of Gainesville, FL", https://contractorrecords.com/gainesville/remodel-permits, data through July 2026, from the City of Gainesville Building Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Gainesville issue a year?About 778 a year in the City of Gainesville: 1,555 permits issued August 2024 through July 2026, 790 of them in the last 12 months on file (to July 2026).
  • How long does a remodel and repair permit take in Gainesville?The usual one took 55 days from issue to the city's final inspection, and the middle half took 31 to 103 days (631 permits issued Aug 2024–Jul 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gainesville file the most remodel and repair permits?July (130 against an average month of 100); April is the quietest (78). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Gainesville?32605, with 601 of the 1,555 (39%); then 32653 (238).