Electrical permits in the City of Gainesville, FL

Data through July 2026 · updated 19 Oct 2026

2,698 electrical permits were issued in the City of Gainesville, August 2024 through July 2026: about 1,349 a year and 16% of all permits. 1,246 electrical permits in the last 12 months on file (Aug 2025–Jul 2026), 14% fewer than the 1,452 in the 12 months before. The busiest month is October. The usual one took 71 days from issue to the city's final. 32605 has the most, 597.

2,698permits issued
1,246last 12 months on file
Octbusiest month
71days, usual issue to final
85%finished
Jul 2026records through

Electrical permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 131Aug2024Sep 2024: 118Oct 2024: 159Nov 2024: 92Dec 2024: 93Jan 2025: 137Jan2025Feb 2025: 157Mar 2025: 104Apr 2025: 131May 2025: 108Jun 2025: 106Jul 2025: 116JulAug 2025: 103Sep 2025: 106Oct 2025: 114Nov 2025: 89Dec 2025: 89Jan 2026: 100Jan2026Feb 2026: 107Mar 2026: 104Apr 2026: 113May 2026: 119Jun 2026: 97Jul 2026: 105Jul
The same numbers as a table
MonthPermits
Aug 2024131
Sep 2024118
Oct 2024159
Nov 202492
Dec 202493
Jan 2025137
Feb 2025157
Mar 2025104
Apr 2025131
May 2025108
Jun 2025106
Jul 2025116
Aug 2025103
Sep 2025106
Oct 2025114
Nov 202589
Dec 202589
Jan 2026100
Feb 2026107
Mar 2026104
Apr 2026113
May 2026119
Jun 202697
Jul 2026105

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (121), November the quietest (81). A busy month at the permit counter usually means a longer wait for a contractor.

January: 105 (100 = an average month)February: 117 (100 = an average month)March: 93 (100 = an average month)April: 109 (100 = an average month)May: 101 (100 = an average month)June: 90 (100 = an average month)July: 98 (100 = an average month)August: 104 (100 = an average month)September: 100 (100 = an average month)October: 121 (100 = an average month)121November: 81 (100 = an average month)December: 81 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January105
February117
March93
April109
May101
June90
July98
August104
September100
October121
November81
December81

Download this table (CSV)

How long an electrical permit takes

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,173 with a final date.

MeasureValue
Permits issued Aug 2024–Jul 20251,452
Finished84.6%
Expired0.1%
Usual days, issue to final71
Middle half, days19–147

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 2,698 electrical permits.

ZIP codePermitsShare
3260559722%
3260854620%
3260139715%
3260931812%
3260728711%
326532208%
326411455%
32603903%
32606713%
326124under 1%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical: Alteration1,14943%
Electrical: New Construction67925%
Electrical: Repair55921%
Electrical: Addition1576%
Electrical: Generator1546%

Download this table (CSV)

How Gainesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Gainesville, Gainesville Permit Cases (ArcGIS Online, table All_Permit_Cases), read 19 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Gainesville issues inside city limits. Unincorporated Alachua County and the other towns in the county (Alachua, High Springs, Newberry and others) have their own permit offices and are not in this file.

  • The file names no contractor company (only the license holder's personal name), so there are no contractor lists, rankings or firm pages here.
  • The file has no declared job value, so we show no costs.
  • The city loaded this permit table once, on July 31, 2026, and it has not been updated since, so the window ends in July 2026.
  • Each trade on a job gets its own permit: a new house usually has a building permit plus separate electrical, mechanical, plumbing and gas permits. Those trade permits are counted under their trade.
  • A final date is the date the city closed the permit. Homes versus other property comes from the parcel's land-use code on the county tax roll, and the ZIP code from the same roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in the City of Gainesville, FL", https://contractorrecords.com/gainesville/electrical-permits, data through July 2026, from the City of Gainesville Building Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Gainesville issue a year?About 1,349 a year in the City of Gainesville: 2,698 permits issued August 2024 through July 2026, 1,246 of them in the last 12 months on file (to July 2026).
  • How long does an electrical permit take in Gainesville?The usual one took 71 days from issue to the city's final inspection, and the middle half took 19 to 147 days (1,173 permits issued Aug 2024–Jul 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gainesville file the most electrical permits?October (121 against an average month of 100); November is the quietest (81). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most electrical permits in Gainesville?32605, with 597 of the 2,698 (22%); then 32608 (546).