Data through July 2026 · updated 19 Oct 2026

3,188 plumbing permits were issued in the City of Gainesville, August 2024 through July 2026: about 1,594 a year and 18% of all permits. 1,507 plumbing permits in the last 12 months on file (Aug 2025–Jul 2026), 10% fewer than the 1,681 in the 12 months before. The busiest month is April. The usual one took 50 days from issue to the city's final. 32605 has the most, 872.

3,188permits issued
1,507last 12 months on file
Aprbusiest month
50days, usual issue to final
82%finished
Jul 2026records through

Plumbing permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 132Aug2024Sep 2024: 132Oct 2024: 131Nov 2024: 95Dec 2024: 123Jan 2025: 159Jan2025Feb 2025: 150Mar 2025: 158Apr 2025: 192May 2025: 148Jun 2025: 114Jul 2025: 147JulAug 2025: 138Sep 2025: 109Oct 2025: 111Nov 2025: 109Dec 2025: 154Jan 2026: 108Jan2026Feb 2026: 133Mar 2026: 128Apr 2026: 156May 2026: 127Jun 2026: 119Jul 2026: 115Jul
The same numbers as a table
MonthPermits
Aug 2024132
Sep 2024132
Oct 2024131
Nov 202495
Dec 2024123
Jan 2025159
Feb 2025150
Mar 2025158
Apr 2025192
May 2025148
Jun 2025114
Jul 2025147
Aug 2025138
Sep 2025109
Oct 2025111
Nov 2025109
Dec 2025154
Jan 2026108
Feb 2026133
Mar 2026128
Apr 2026156
May 2026127
Jun 2026119
Jul 2026115

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (131), November the quietest (77). A busy month at the permit counter usually means a longer wait for a contractor.

January: 101 (100 = an average month)February: 107 (100 = an average month)March: 108 (100 = an average month)April: 131 (100 = an average month)131May: 104 (100 = an average month)June: 88 (100 = an average month)July: 99 (100 = an average month)August: 102 (100 = an average month)September: 91 (100 = an average month)October: 91 (100 = an average month)November: 77 (100 = an average month)December: 104 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January101
February107
March108
April131
May104
June88
July99
August102
September91
October91
November77
December104

Download this table (CSV)

How long a plumbing permit takes

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends. Usual days is the middle permit among the 1,289 with a final date.

MeasureValue
Permits issued Aug 2024–Jul 20251,681
Finished81.9%
Expired0.2%
Usual days, issue to final50
Middle half, days12–133

Download this table (CSV)

ZIP codes with the most plumbing permits

Counted at the property's ZIP code. Share is the part of the city's 3,188 plumbing permits.

ZIP codePermitsShare
3260587227%
3260852917%
3265337612%
3260736912%
3260135511%
326092759%
326411996%
326061103%
32603803%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Plumbing: Alteration1,34642%
Gas: Alteration69022%
Plumbing: New Construction56018%
Plumbing: Repair2999%
Gas: Repair1093%
Gas: New Construction813%
Plumbing: Addition632%
Gas: Addition341%
Gas: Medical Gas4under 1%
Plumbing: Solar Pool Heating2under 1%

Download this table (CSV)

How Gainesville compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in Gainesville. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Gainesville, Gainesville Permit Cases (ArcGIS Online, table All_Permit_Cases), read 19 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Building and trade permits the City of Gainesville issues inside city limits. Unincorporated Alachua County and the other towns in the county (Alachua, High Springs, Newberry and others) have their own permit offices and are not in this file.

  • The file names no contractor company (only the license holder's personal name), so there are no contractor lists, rankings or firm pages here.
  • The file has no declared job value, so we show no costs.
  • The city loaded this permit table once, on July 31, 2026, and it has not been updated since, so the window ends in July 2026.
  • Each trade on a job gets its own permit: a new house usually has a building permit plus separate electrical, mechanical, plumbing and gas permits. Those trade permits are counted under their trade.
  • A final date is the date the city closed the permit. Homes versus other property comes from the parcel's land-use code on the county tax roll, and the ZIP code from the same roll.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in the City of Gainesville, FL", https://contractorrecords.com/gainesville/plumbing-permits, data through July 2026, from the City of Gainesville Building Division building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: days to final · Plumbing permits by ZIP code · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Gainesville issue a year?About 1,594 a year in the City of Gainesville: 3,188 permits issued August 2024 through July 2026, 1,507 of them in the last 12 months on file (to July 2026).
  • How long does a plumbing permit take in Gainesville?The usual one took 50 days from issue to the city's final inspection, and the middle half took 12 to 133 days (1,289 permits issued Aug 2024–Jul 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Gainesville file the most plumbing permits?April (131 against an average month of 100); November is the quietest (77). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most plumbing permits in Gainesville?32605, with 872 of the 3,188 (27%); then 32608 (529).