What Metro's list says
From Metro Codes' list of projects that may or may not require a permit and the renovation page (read 23 October 2026), one- and two-family homes:
| Job | Permit |
|---|---|
| Plumbing, relocation of fixture, new | Yes, plumbing |
| Sprinkler system, lawn (water connection and backflow preventer only) | Yes, plumbing |
| Shower or bath enclosure, new | Yes, building |
| Sink and countertops (see kitchen cabinets) | Yes |
| Cabinet installation with no electrical or plumbing | No |
| Vanities without electrical or plumbing | No |
| Replacing dishwashers, disposals or refrigerators with ice makers | No |
Moving or adding a fixture is the trigger; swapping an appliance on existing connections is not. A bathroom or kitchen remodel that moves fixtures usually needs a building (rehab) permit as well, which Metro says "will trigger required inspections and allow trade permits to be pulled by registered contractors". The list does not name water heater replacement on its own; ask Codes (615-862-6500) before treating a swap as exempt. An electric water heater is also an item on Metro's electrical permit application.
Meters and backflow: licensed plumber only
Two Metro pages leave no homeowner route:
- Water meters. "Meter installation requires a licensed plumber." Each meter a project needs (domestic, irrigation, fire sprinkler) is permitted and inspected, and the first meter inspection is booked automatically "for 30 business days after the date the permit is pulled" (Water Meter Inspection).
- Backflow preventers. Required for "large residences and most commercial projects", and "Pools, irrigation, and sprinkler systems require backflow preventers". Installation "requires a licensed plumber", and the Codes Department "will issue the backflow preventer permit to the plumber" (Backflow Preventer Inspection). For a residential project, the cross-connection review goes through Metro Water Services.
Both must pass before a Use and Occupancy letter on a new house, so a pool or irrigation project that skips them will stall at the end.
Who can pull it
Metro's trades permit page: "Only licensed contractors with an e-permit account can apply for a trade permit using our online system"; others apply in person at 800 President Ronald Reagan Way, weekdays 7:30 a.m. to 4:00 p.m., with the Plumbing Trade Permit Application.
| Credential | Issued by | When it applies |
|---|---|---|
| Master plumber's certificate (journeyman and apprentice too) | Metro's examiners board (Metro Codes) | The plumbing permit runs on it |
| Homeowner permit | The same board examines homeowner applicants | Your own home, your own work |
| CMC-A (plumbing) contractor's license | Tennessee Board for Licensing Contractors | When the plumbing part is "$25,000 or more" (Board) |
| Home improvement license | Tennessee Board for Licensing Contractors | Residential remodeling of $3,000 to $24,999 in Davidson County |
Fees and deadlines
We could not find Metro's current plumbing fee table online; Codes sets it at issue. Metro's trade applications say work must start within six months and finish within two years of issue, and a permit lapses if work stops for a year (Metro electrical application form, read 23 October 2026).
Checking it afterwards
Search the address in ePermits or open the parcel in Metro's Parcel Viewer and pick Permit History. Your plumber's company should be on the plumbing permit, with a passed final (Nashville building permit search).
What 26,809 Nashville plumbing permits show
| Measure | Nashville plumbing |
|---|---|
| Permits on homes, September 2023 to September 2026 | 26,809 |
| Firms | 630 |
| Firms with a permit in the last 12 months | 407 |
| Reached a final (permits a year or more old) | 89.7% |
| Usual filed value | $5,000 |
| Middle half of firms' usual value | $5,000 to $25,000 |
| 10th / 90th-percentile firm finished share (10+ permits) | 72.1% / 100.0% |
| Busiest firm's share / five busiest | 12.1% / 26.4% |
| Busiest / quietest month | June (114) / December (87) |
Nashville plumbing permits close reliably: only 16 of 214 busy plumbing firms finish under 70%. The market is more concentrated than electrical, with the busiest single firm holding 12.1% of permits against 4.6% in electrical. Filed values spread wide, from $5,000 to $25,000 across the middle half of firms, so ask what kind of jobs a firm's record is made of before comparing it with yours. Prices by job size are on Nashville plumbing cost, and monthly totals on Nashville permit statistics.
See every Nashville plumber by permits finaled →
Before you hire
Ask whose master plumber's certificate the permit will be pulled under; the full checklist is in hiring a plumber in Nashville and the license steps in Nashville contractor license lookup. Compare firms on the Nashville plumber list. Other cities' rules are in do I need a permit for plumbing repairs and water heaters; national prices in plumbing labor cost.
What this does not tell you
We cannot time Nashville permits from issue to final, so there is no days figure. Homeowner permits name the owner, not a firm. Metro's permit list was last revised in 2022, and it is a guide, not the code; ask Codes when a job is not on it.
How we know this
The permit list, meter, backflow and trade-permit rules are quoted from Metro Nashville Codes pages and forms read 23 October 2026; the examiners board and state license rules from Metro Codes and the Tennessee Board for Licensing Contractors, read 22 October 2026. Permit counts are Metro Nashville Codes plumbing trade permits on homes in Davidson County, September 2023 to September 2026; "reached a final" uses permits a year or more old.
Numbers come from Metro Nashville (Davidson County) building and trade permits, data through September 21, 2026. Nobody paid to be on this page and nobody can.
Questions
- Do I need a permit to move a sink or toilet in Nashville?
Yes. Metro Codes' permit list marks 'Plumbing, relocation of fixture, new' as needing a plumbing permit for one- and two-family homes. Swapping a dishwasher, disposal or ice-maker refrigerator in place does not need one.
- Can a homeowner pull a plumbing permit in Nashville?
Metro has homeowner permits: its examiners board 'shall also examine applicants for homeowner permits'. Homeowners apply in person at Metro Codes, 800 President Ronald Reagan Way, since only licensed contractors can use ePermits. A water meter or backflow preventer, though, must be installed by a licensed plumber.
- Does a lawn sprinkler need a plumbing permit in Nashville?
The water connection and backflow preventer do. Metro's list marks 'Sprinkler system, lawn (water connection & back flow preventer only)' as plumbing-permit work, and Metro says irrigation systems require backflow preventers, installed by a licensed plumber and inspected.
- How much is a plumbing permit in Nashville?
We could not find Metro's current plumbing fee table online. Codes calculates the fee when the permit is issued; call 615-862-6500 to ask. A new water meter or backflow preventer is a separate permit.
- How often do Nashville plumbing permits get a final?
In our file 89.7% of Nashville plumbing permits a year or more old reached a final, and the 10th-percentile firm with 10 or more permits reached 72.1%.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Do I need a plumbing permit in Arlington, VA? The like-for-like rule, gas, and timing
- Austin building permit search: how to look up permits on an address
- Do I need a plumbing permit in Austin? What is exempt, who can pull it, and the fees
- Do I need a plumbing permit in Bellevue, WA? Fixtures, showers, water heaters and the homeowner rule
- Do I need a plumbing permit in unincorporated San Diego County? The exempt list, the water-heater rule and the $392 fee
- Do I need a plumbing permit in San Diego? Water heaters, repipes, sewer repairs and the Simple Permit fees
For one city
- List of building projects which may or may not require a permit — Metro Codes (accessed 2026-10-23)
- Building Permits Central: I Want to Renovate a Single-Family Residence — Metro Codes (accessed 2026-10-23)
- Obtaining a Trades Permit — Metro Codes (accessed 2026-10-23)
- Building Permits Central: I Need a Backflow Preventer Inspection — Metro Codes (accessed 2026-10-23)
- Building Permits Central: I Need a Water Meter Inspection — Metro Codes (accessed 2026-10-23)
- Mechanical, Plumbing, Electrical Examiners & Appeals Board — Metro Codes (2026-10-22)
- Subcontractors / Who is Required to be Licensed — Tennessee Board for Licensing Contractors (2026-10-22)