The San Diego rule
The City's When is a Permit Required? sheet says owners of single-family homes, townhomes and duplexes "must obtain a permit before constructing, expanding, altering, renovating, relocating, demolishing or changing the use" of a building. Information Bulletin 203 (July 2024, read 23 October 2026) sorts remodel work into three groups:
| Work | Permit |
|---|---|
| Painting, wallpaper, flooring, cabinets | No permit (the City's sheet) |
| Like-for-like maintenance repairs, aggregate under $1,000, not touching electrical, plumbing or mechanical | No permit |
| Moving kitchen cabinets and countertops in a house, duplex or townhouse | No permit |
| Tub-to-tub or shower-to-shower, same size and location | No permit |
| Drywall replaced to repair trade work, up to 100 sq ft | No permit |
| New color coat on existing stucco | No permit |
| Kitchen or bathroom remodel, no change to structure, wall framing or exterior walls, no added plumbing fixtures | No-plan building permit |
| Replacement doors or windows, same size and type | No-plan (or exempt if flashing and rough openings are untouched) |
| Re-stucco, siding replacement over solid sheathing | No-plan |
| Moving walls, adding fixtures, structural or exterior wall changes | Building permit with plans |
The exemptions do not apply to a designated historical resource or a house in a historic district. IB 203 also says no-plan permits are only for buildings that were "legally permitted, constructed and passed final inspections", and if the inspector finds the work "too extensive", plans will be required and a new permit issued.
The 45-year check
This is the San Diego rule that surprises owners of older houses. IB 203: "If the site contains buildings or structures 45 years old or older, plans must be submitted through the Development Services Department for historic review, unless the project scope is exempted per San Diego Municipal Code §143.0212." The City says that review "will typically be ten business days" (see Information Bulletin 580). A house built before about 1981 should plan for it.
Two more triggers: once any permit is issued for repairs or replacements, smoke and carbon monoxide alarms must be brought to current code, and work that blocks or affects fire sprinklers needs its own permit.
Who can pull it
A licensed contractor. A remodel across trades is CSLB class B General Building or B-2 Residential Remodeling (CSLB). Unlicensed help is limited to jobs under $1,000 with no permit and no hired workers (CSLB, AB 2622). 63.1% of remodel firms in our file matched an active CSLB license and 14 matched one that was not.
You, as owner-builder. Sign the Owner-Builder Verification Form DS-3042. IB 203: "Tenants/Lessees may not sign this form," and it must be notarized if the owner is not present to prove identity.
How to apply and what it costs
Submit a no-plan building permit online through the City's portal, choosing the Building Construction application, with the Project Contacts form (DS-345) and the No-Plan Building Permit Supplemental Application (DS-6005). IB 203 says a virtual appointment can be booked after submittal for help. Building permit fees are in Information Bulletin 501, which we did not verify, so we give no building fee here.
The trade side has a published figure. IB 103, Table 3A, prices a residential "existing Kitchen/Bathroom Remodel with no changes to structural elements, wall framing or exterior walls and no added plumbing fixtures/gas appliances" at $440.82 per dwelling unit, a fee that "includes the cost of a no-plan combination permit for all plumbing, mechanical, and electrical work". Against the usual $18,998 filed value, that is about 2% of the job. For local prices, see San Diego remodel cost; national ones are in home remodel cost.
What 1,681 San Diego remodel permits show
| Measure | City of San Diego remodel |
|---|---|
| Permits on homes, October 2023 to September 2026 | 1,681 |
| Firms | 534 |
| Firms with a permit in the last 12 months of the window | 260 |
| Usual filed value | $18,998 |
| Middle half of firms' usual job value | $10,241 to $38,500 |
| Reached final (permits a year or more old) | 79.1% |
| Usual days from issue to final | 162 |
| 10th / 90th-percentile firm's finished share (10+ permits) | 58.7% / 91.9% |
| Firms with one permit only | 381 (71.3%) |
| Busiest / quietest month (100 = average) | July (144) / December (59) |
Remodel permits finish more often than San Diego's trade permits (79.1%, against 61.4% for HVAC), but take far longer: 162 days is the life of the job, not the paperwork. Most remodelers are small: 71.3% of firms filed one permit in three years, so the compare list is more useful for the firms with a record than for ranking them all. Filing peaks in July and is lowest in December.
See every San Diego remodeler by finished permits →
Check it in five minutes
- Look up the B or B-2 license on CSLB Check a License (steps).
- Find earlier permits on the house, including whether it ever passed final, in Permit Finder (how). IB 203 needs that history.
- Compare remodelers on the San Diego remodel list; counts by year are on San Diego permit statistics.
Rules elsewhere: do I need a permit for a home remodel, kitchen remodel and bathroom remodel. Trade permits on their own: San Diego electrical permit and San Diego plumbing permit.
What this does not tell you
This is the City of San Diego only. Our remodel count holds building permits for alterations to existing homes; additions and ADUs are counted separately. A filed value is the applicant's estimate, not the contract price. We could not verify IB 501's building permit fees, so ask Development Services (619-446-5000) or read the invoice.
How we know this
Rules, exemptions, the no-plan list and the 45-year historic review are quoted from the City of San Diego's "When is a Permit Required?" sheet and Information Bulletin 203 (July 2024); the combination MEP fee from Information Bulletin 103 (May 2026); all read 23 October 2026. License classes and the handyperson limit from CSLB. Counts are City of San Diego remodel and alteration permits on homes, October 2023 to September 2026; finished share uses permits a year or more old, and days to final is the median from issue to final.
Numbers come from City of San Diego Development Services approvals, data through October 15, 2026. Nobody paid to be on this page and nobody can.
Questions
- Do I need a permit to remodel my kitchen in San Diego?
Usually yes, but often without plans. Information Bulletin 203 lets a kitchen or bathroom remodel get a no-plan building permit when there are no changes to structural elements, wall framing or exterior walls and no added plumbing fixtures. Moving cabinets and countertops in a house needs no building permit; new circuits and plumbing still need trade permits.
- What remodeling can I do without a permit in San Diego?
Painting, wallpapering, flooring and cabinets; like-for-like maintenance repairs under $1,000 that do not touch electrical, plumbing or mechanical work; tub-to-tub and shower-to-shower swaps of the same size and place; and up to 100 square feet of drywall replaced to repair trade work.
- Does my San Diego remodel need historic review?
If the house is 45 years old or older, IB 203 says plans must be submitted for historic review unless SDMC §143.0212 exempts the project; the City says that review typically takes ten business days. Designated historic properties and historic districts always need it.
- Can a homeowner pull a remodel permit in San Diego?
Yes, as an owner-builder, by signing the Owner-Builder Verification Form DS-3042. IB 203 says tenants may not sign it and it must be notarized if the owner is not present to prove identity. A hired remodeler needs a CSLB license, usually B or B-2.
- How long does a remodel permit take in San Diego?
The usual City of San Diego remodel permit in our file passed final 162 days after it was issued, and 79.1% of those a year or more old had passed.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Do I need a permit to remodel a bathroom? The rule in 14 cities, and what is exempt
- Do I need a permit to remodel my house? The rule in 14 departments, and what gets filed
- Do I need a permit to remodel a kitchen? The rule in 18 cities, and what is exempt
- San Diego building permit search: how to look up permits on an address
For one city
- When is a Permit Required? — City of San Diego Development Services (accessed 2026-10-23)
- Information Bulletin 203: No-Plan Building Permit (July 2024) — City of San Diego (accessed 2026-10-23)
- Information Bulletin 103: Fee Schedule for Mechanical, Electrical, Plumbing/Gas Permits (May 2026) — City of San Diego (accessed 2026-10-23)
- CSLB Licensing Classifications (2026-10-22)
- Handyperson Exemption to Increase to $1,000 in 2025 — CSLB press release (AB 2622) (2026-10-22)