The San Diego rule
The City's When is a Permit Required? sheet and Information Bulletin 103 (May 2026, both read 23 October 2026) set the line. IB 103: "Electrical permits are required for all electrical work except as exempted in San Diego Municipal Code (SDMC) §129.0303."
| Job | Permit? |
|---|---|
| Replace a switch, light fixture, receptacle or appliance | No |
| Add a circuit | Yes, Simple Permit |
| Move outlets, rewire ("miscellaneous wiring") | Yes, Simple Permit |
| Panel replacement or upgrade, up to 200 amps | Yes, Simple Permit |
| Service of 225 to 400 amps | Yes, Simple Permit |
| Over 400 amps | Yes, with plans |
| EV charger in a private garage | Yes, Simple Permit (fees in IB 187) |
| Meter reset or reconnection, temporary power pole | Yes, Simple Permit |
| Standby generator | Yes, not a Simple Permit; may also need a hazardous materials permit |
| Solar or battery | Yes, under IB 301 (see San Diego solar permit) |
| Any electrical work on a designated historic property or in a historic district | Yes, with plans |
The Simple Permits page limits the no-plan route to "single-dwelling units, duplexes or townhouses located outside of historic districts or in non-historically designated properties only." If one item in the job needs plan review, IB 103 says the whole job loses Simple Permit status and goes to plan review.
Who can pull it
A licensed electrician. California licenses electrical contractors as C-10 through CSLB (classifications). Since 1 January 2025 unlicensed handypersons are limited to jobs under $1,000, and only when no permit is needed (CSLB), so any permitted electrical job needs a licensee or you. 72.9% of the San Diego electrical firms in our file matched an active CSLB license; 16 matched one that was not active.
You, as owner-builder. The City says "Homeowners, property owners and licensed contractors" can get a Simple Permit. Owner-builders upload the Owner-Builder Verification Form DS-3042; IB 103 says it must also be signed if you are hiring different contractors yourself.
How to apply
- Apply in the City's Accela portal (aca.accela.com/SANDIEGO) and choose Simple Permits. The City's instructions walk through picking each item and how many.
- Issue. "Licensed contractors will receive the permit as soon as they complete and submit the application and pay the invoice. Homeowners will receive their Simple Permit normally within two business days" after DS-3042 is submitted.
- Inspection. Schedule it in the same portal once the invoice is paid. For any circuits added to a house or duplex, IB 103 requires a signed Electrical Circuit Card (DS-1779) at inspection, unless the approved plans include the electrical drawings.
What it costs
From IB 103, Table 2 (items that qualify as Simple Permits on a house, duplex or townhouse):
| Item | Fee |
|---|---|
| Circuits 15 to 45 amps, first 5 | $176.57 |
| Circuits 6 to 10 | $52.39 more |
| Each further 10 circuits, up to 50 | $52.39 |
| Circuits 50 to 200 amps, each 3 | $353.13 |
| Panel replace or upgrade, up to 200 amps | $176.57 |
| Circuits 225 to 400 amps, each 2 | $353.13 |
| Conduit and junction box only | $176.57 |
| Temporary power pole | $176.57 |
A kitchen with three new 20-amp circuits is $176.57; adding a 50-amp range circuit to that is a separate $353.13 line. IB 103 says plan check, inspection and records fees are non-refundable. San Diego's electrical permits carry no job value; national price ranges are in electrical work cost.
What 2,265 San Diego electrical permits show
| Measure | City of San Diego electrical |
|---|---|
| Permits on homes, October 2023 to September 2026 | 2,265 |
| Firms | 576 |
| Firms with a permit in the last 12 months of the window | 285 |
| Reached final (permits a year or more old) | 75.5% |
| Usual days from issue to final | 71 |
| 10th / 90th-percentile firm's finished share (10+ permits) | 54.2% / 91.8% |
| Firms with 10+ permits finishing under 70% | 13 of 30 |
| Firms with one permit only | 353 (61.3%) |
| Busiest / quietest month (100 = average) | March (167) / November (72) |
The permit is quick to get; the final is where jobs stall. Only 75.5% of electrical permits a year or more old reached final, and 13 of the 30 busiest firms finished under 70%. An open permit stays on your address until someone books the inspection, so ask who books it and hold back the last payment until it passes. Filing runs from March at the top to November at the bottom.
See every San Diego electrician by finished permits →
Check it in five minutes
- Look up the electrician's C-10 on CSLB Check a License (steps).
- After the job is booked, find the permit on your address in the City's Permit Finder or Accela (how).
- Compare firms on the San Diego electrician list; counts by year are on San Diego permit statistics.
Other cities' rules: do I need a permit for electrical work, panel upgrade and EV charger.
What this does not tell you
This is the City of San Diego only; unincorporated areas are in our San Diego County electrical permit guide, and Chula Vista, Escondido and the other cities run their own counters. Exempt swaps leave no record. Permits pulled by owner-builders are not in our firm lists. IB 103 lists fees for the permit items only; the City's invoice is the final figure.
How we know this
The permit rule, Simple Permit limits, issue times and fees are quoted from the City of San Diego's "When is a Permit Required?" sheet, Information Bulletin 103 (May 2026), Simple Permits page and Simple Permit instructions, read 23 October 2026; license classes and the handyperson limit from CSLB. Counts are City of San Diego electrical permits on homes, October 2023 to September 2026; finished share uses permits a year or more old, days to final is the median from issue to final, and license status is our name match to CSLB records.
Numbers come from City of San Diego Development Services approvals, data through October 15, 2026. Nobody paid to be on this page and nobody can.
Questions
- Do I need a permit to replace a light fixture or outlet in San Diego?
No. The City's 'When is a Permit Required?' sheet says replacing switches, light fixtures, receptacles and appliances does not need a permit. Adding a circuit, moving outlets or rewiring does.
- How much is an electrical permit in San Diego?
Information Bulletin 103 charges $176.57 for the first five 15 to 45 amp circuits, $52.39 more for circuits six to ten, and $176.57 for a panel replacement or upgrade up to 200 amps. A 225 to 400 amp service is $353.13 for each two circuits.
- Can a homeowner pull an electrical permit in San Diego?
Yes. The City says homeowners, property owners and licensed contractors can get a no-plan Simple Permit for a single-dwelling unit, duplex or townhouse outside historic districts. As an owner-builder you upload form DS-3042, and the City normally issues the permit within two business days.
- How long does an electrical permit take in San Diego?
A licensed contractor gets a Simple Permit as soon as the application is submitted and the invoice paid. Reaching final takes longer: the usual City of San Diego electrical permit in our file passed final 71 days after issue.
- Do I need a permit for a panel upgrade in San Diego?
Yes. A panel replacement or upgrade up to 200 amps qualifies for a Simple Permit at $176.57 under IB 103. Services from 225 to 400 amps can also be Simple Permits; above 400 amps need plans.
Build your own list
Every firm with that kind of permit on record. Pick what you value. The list moves.
Related guides
- Do I need a permit for electrical work? The rule in 13 cities, and how many get filed
- Do I need an electrical permit in Anaheim? Panel upgrades, the utility meter spot, fees and inspections
- Do I need an electrical permit in Arlington, VA? What's exempt, who pulls it, how long it takes
- Austin building permit search: how to look up permits on an address
For one city
- San Diego contractor license lookup: which license, where to search, and what the permits show
- Hiring a solar installer in San Diego: the CSLB license, the permit, and what 10,000 solar permits show
- San Diego ADU Home Density Bonus Program after the 2025 changes: where it still applies, the caps, and hiring a builder
- When is a Permit Required? — City of San Diego Development Services (accessed 2026-10-23)
- Information Bulletin 103: Fee Schedule for Mechanical, Electrical, Plumbing/Gas Permits (May 2026) — City of San Diego (accessed 2026-10-23)
- Simple Permits — City of San Diego Development Services (accessed 2026-10-23)
- How to Apply for Simple Permits Online (instructions) — City of San Diego (accessed 2026-10-23)
- CSLB Licensing Classifications (2026-10-22)
- Handyperson Exemption to Increase to $1,000 in 2025 — CSLB press release (AB 2622) (2026-10-22)