Electrical permits in unincorporated Jackson County, OR

Data through July 2026 · updated 20 Oct 2026

2,568 electrical permits were issued in unincorporated Jackson County, August 2024 through July 2026: about 1,284 a year and 35% of all permits. 1,301 electrical permits in the last 12 months on file (Aug 2025–Jul 2026), 3% more than the 1,267 in the 12 months before. The busiest month is September.

2,568permits issued
1,301last 12 months on file
Sepbusiest month
96%finished
$3,000usual declared value
Jul 2026records through

Electrical permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 119Aug2024Sep 2024: 121Oct 2024: 109Nov 2024: 96Dec 2024: 91Jan 2025: 101Jan2025Feb 2025: 96Mar 2025: 97Apr 2025: 94May 2025: 107Jun 2025: 112Jul 2025: 124JulAug 2025: 124Sep 2025: 139Oct 2025: 135Nov 2025: 83Dec 2025: 102Jan 2026: 101Jan2026Feb 2026: 94Mar 2026: 103Apr 2026: 118May 2026: 95Jun 2026: 105Jul 2026: 102Jul
The same numbers as a table
MonthPermits
Aug 2024119
Sep 2024121
Oct 2024109
Nov 202496
Dec 202491
Jan 2025101
Feb 202596
Mar 202597
Apr 202594
May 2025107
Jun 2025112
Jul 2025124
Aug 2025124
Sep 2025139
Oct 2025135
Nov 202583
Dec 2025102
Jan 2026101
Feb 202694
Mar 2026103
Apr 2026118
May 202695
Jun 2026105
Jul 2026102

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). September is the busiest (121), November the quietest (84). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 89 (100 = an average month)March: 93 (100 = an average month)April: 99 (100 = an average month)May: 94 (100 = an average month)June: 101 (100 = an average month)July: 106 (100 = an average month)August: 114 (100 = an average month)September: 121 (100 = an average month)121October: 114 (100 = an average month)November: 84 (100 = an average month)December: 90 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February89
March93
April99
May94
June101
July106
August114
September121
October114
November84
December90

Download this table (CSV)

How many electrical permits get finished

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Aug 2024–Jul 20251,267
Finished95.7%
Expired0.6%

Download this table (CSV)

What an electrical permit is declared at

The value written on the permit at application, from 1,586 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$3,000
Middle half$1,500–$6,315

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential ELEC2,05480%
Commercial ELEC51420%

Download this table (CSV)

How Jackson County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in the Rogue Valley. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Jackson County GIS, Property/Permits_Building (building permits), read 20 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Permits issued by Jackson County's own Building Safety office, which serves unincorporated Jackson County: White City, Applegate, Ruch, Prospect, Trail and the rural valleys. Medford runs its own building department and has its own pages on this site; Ashland, Central Point and the other cities that run their own building departments are not in this file.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The file has no issue date. Permits are counted by the month the application came in, and only once the county issued them; applications still in review are left out. The window ends in July 2026 so that recent applications have had time to be issued.
  • The file records the date of a permit's last status change, not a separate final inspection date, so we show how many permits finished but not how long they took.
  • Each trade on a job gets its own permit: a new house usually has a structural or dwelling permit plus separate electrical, mechanical and plumbing permits.
  • The value is the estimated cost on the permit. Electrical and plumbing permits usually carry none.
  • Agricultural-exempt buildings, grading permits and the 2020 wildfire disaster-relief cases are not counted.
  • The file has no ZIP code for most permits, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in unincorporated Jackson County, OR", https://contractorrecords.com/jackson-county-or/electrical-permits, data through July 2026, from Jackson County Development Services, Building Safety building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: finished share · Electrical permits: declared value · Electrical permits by permit type.

Common questions

  • How many electrical permits does Jackson County issue a year?About 1,284 a year in unincorporated Jackson County: 2,568 permits issued August 2024 through July 2026, 1,301 of them in the last 12 months on file (to July 2026).
  • When do people in Jackson County file the most electrical permits?September (121 against an average month of 100); November is the quietest (84). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.