Plumbing permits in unincorporated Jackson County, OR

Data through July 2026 · updated 20 Oct 2026

501 plumbing permits were issued in unincorporated Jackson County, August 2024 through July 2026: about 250 a year and 7% of all permits. 240 plumbing permits in the last 12 months on file (Aug 2025–Jul 2026), 8% fewer than the 261 in the 12 months before. The busiest month is July.

501permits issued
240last 12 months on file
Julbusiest month
93%finished
$5,000usual declared value
Jul 2026records through

Plumbing permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 27Aug2024Sep 2024: 25Oct 2024: 25Nov 2024: 22Dec 2024: 19Jan 2025: 18Jan2025Feb 2025: 17Mar 2025: 16Apr 2025: 25May 2025: 20Jun 2025: 21Jul 2025: 26JulAug 2025: 20Sep 2025: 24Oct 2025: 19Nov 2025: 11Dec 2025: 16Jan 2026: 19Jan2026Feb 2026: 24Mar 2026: 19Apr 2026: 20May 2026: 25Jun 2026: 17Jul 2026: 26Jul
The same numbers as a table
MonthPermits
Aug 202427
Sep 202425
Oct 202425
Nov 202422
Dec 202419
Jan 202518
Feb 202517
Mar 202516
Apr 202525
May 202520
Jun 202521
Jul 202526
Aug 202520
Sep 202524
Oct 202519
Nov 202511
Dec 202516
Jan 202619
Feb 202624
Mar 202619
Apr 202620
May 202625
Jun 202617
Jul 202626

Download this table (CSV)

When plumbing permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (125), November the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 89 (100 = an average month)February: 98 (100 = an average month)March: 84 (100 = an average month)April: 108 (100 = an average month)May: 108 (100 = an average month)June: 91 (100 = an average month)July: 125 (100 = an average month)125August: 113 (100 = an average month)September: 117 (100 = an average month)October: 105 (100 = an average month)November: 79 (100 = an average month)December: 84 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January89
February98
March84
April108
May108
June91
July125
August113
September117
October105
November79
December84

Download this table (CSV)

How many plumbing permits get finished

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Aug 2024–Jul 2025261
Finished92.7%
Expired0.4%

Download this table (CSV)

What a plumbing permit is declared at

The value written on the permit at application, from 230 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$5,000
Middle half$2,300–$9,500

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential PLM39579%
Commercial PLM9719%
Residential STR92%

Download this table (CSV)

How Jackson County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Plumbing permits for other places in the Rogue Valley. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Jackson County GIS, Property/Permits_Building (building permits), read 20 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Permits issued by Jackson County's own Building Safety office, which serves unincorporated Jackson County: White City, Applegate, Ruch, Prospect, Trail and the rural valleys. Medford runs its own building department and has its own pages on this site; Ashland, Central Point and the other cities that run their own building departments are not in this file.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The file has no issue date. Permits are counted by the month the application came in, and only once the county issued them; applications still in review are left out. The window ends in July 2026 so that recent applications have had time to be issued.
  • The file records the date of a permit's last status change, not a separate final inspection date, so we show how many permits finished but not how long they took.
  • Each trade on a job gets its own permit: a new house usually has a structural or dwelling permit plus separate electrical, mechanical and plumbing permits.
  • The value is the estimated cost on the permit. Electrical and plumbing permits usually carry none.
  • Agricultural-exempt buildings, grading permits and the 2020 wildfire disaster-relief cases are not counted.
  • The file has no ZIP code for most permits, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Plumbing permits in unincorporated Jackson County, OR", https://contractorrecords.com/jackson-county-or/plumbing-permits, data through July 2026, from Jackson County Development Services, Building Safety building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · Permit types.

Download the tables (CSV): Plumbing permits by month · Plumbing permits by calendar month (index) · Plumbing permits: finished share · Plumbing permits: declared value · Plumbing permits by permit type.

Common questions

  • How many plumbing permits does Jackson County issue a year?About 250 a year in unincorporated Jackson County: 501 permits issued August 2024 through July 2026, 240 of them in the last 12 months on file (to July 2026).
  • When do people in Jackson County file the most plumbing permits?July (125 against an average month of 100); November is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.