Contractor Records
Home › Jackson County › HVAC

HVAC permits in unincorporated Jackson County, OR

Data through July 2026 · updated 20 Oct 2026

2,042 HVAC permits were issued in unincorporated Jackson County, August 2024 through July 2026: about 1,021 a year and 28% of all permits. 1,041 HVAC permits in the last 12 months on file (Aug 2025–Jul 2026), 4% more than the 1,001 in the 12 months before. The busiest month is July.

2,042permits issued
1,041last 12 months on file
Julbusiest month
97%finished
$7,500usual declared value
Jul 2026records through

HVAC permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 82Aug2024Sep 2024: 75Oct 2024: 101Nov 2024: 74Dec 2024: 106Jan 2025: 89Jan2025Feb 2025: 73Mar 2025: 75Apr 2025: 72May 2025: 64Jun 2025: 84Jul 2025: 106JulAug 2025: 77Sep 2025: 90Oct 2025: 103Nov 2025: 78Dec 2025: 103Jan 2026: 71Jan2026Feb 2026: 87Mar 2026: 75Apr 2026: 73May 2026: 78Jun 2026: 96Jul 2026: 110Jul
The same numbers as a table
MonthPermits
Aug 202482
Sep 202475
Oct 2024101
Nov 202474
Dec 2024106
Jan 202589
Feb 202573
Mar 202575
Apr 202572
May 202564
Jun 202584
Jul 2025106
Aug 202577
Sep 202590
Oct 2025103
Nov 202578
Dec 2025103
Jan 202671
Feb 202687
Mar 202675
Apr 202673
May 202678
Jun 202696
Jul 2026110

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (127), May the quietest (83). A busy month at the permit counter usually means a longer wait for a contractor.

January: 94 (100 = an average month)February: 94 (100 = an average month)March: 88 (100 = an average month)April: 85 (100 = an average month)May: 83 (100 = an average month)June: 106 (100 = an average month)July: 127 (100 = an average month)127August: 93 (100 = an average month)September: 97 (100 = an average month)October: 120 (100 = an average month)November: 89 (100 = an average month)December: 123 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January94
February94
March88
April85
May83
June106
July127
August93
September97
October120
November89
December123

Download this table (CSV)

How many HVAC permits get finished

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Aug 2024–Jul 20251,001
Finished96.7%
Expired0.7%

Download this table (CSV)

What an HVAC permit is declared at

The value written on the permit at application, from 1,673 permits with one. Not a quote and not the final bill.

MeasureValue
Usual declared value$7,500
Middle half$2,000–$13,357

Download this table (CSV)

The county's own permit types

How the county filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Residential MECH1,86691%
Commercial MECH1769%

Download this table (CSV)

How Jackson County compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

HVAC permits for other places in the Rogue Valley. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: Jackson County GIS, Property/Permits_Building (building permits), read 20 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Permits issued by Jackson County's own Building Safety office, which serves unincorporated Jackson County: White City, Applegate, Ruch, Prospect, Trail and the rural valleys. Medford runs its own building department and has its own pages on this site; Ashland, Central Point and the other cities that run their own building departments are not in this file.

  • The county's file names no contractor, so there are no contractor lists, rankings or firm pages for this county.
  • The file has no issue date. Permits are counted by the month the application came in, and only once the county issued them; applications still in review are left out. The window ends in July 2026 so that recent applications have had time to be issued.
  • The file records the date of a permit's last status change, not a separate final inspection date, so we show how many permits finished but not how long they took.
  • Each trade on a job gets its own permit: a new house usually has a structural or dwelling permit plus separate electrical, mechanical and plumbing permits.
  • The value is the estimated cost on the permit. Electrical and plumbing permits usually carry none.
  • Agricultural-exempt buildings, grading permits and the 2020 wildfire disaster-relief cases are not counted.
  • The file has no ZIP code for most permits, so there are no ZIP code pages.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in unincorporated Jackson County, OR", https://contractorrecords.com/jackson-county-or/hvac-permits, data through July 2026, from Jackson County Development Services, Building Safety building-permit records.

Link to a table: By month · Season · How many get finished · Declared value · Permit types.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share · HVAC permits: declared value · HVAC permits by permit type.

Common questions

  • How many HVAC permits does Jackson County issue a year?About 1,021 a year in unincorporated Jackson County: 2,042 permits issued August 2024 through July 2026, 1,041 of them in the last 12 months on file (to July 2026).
  • When do people in Jackson County file the most HVAC permits?July (127 against an average month of 100); May is the quietest (83). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.