Contractor Records
Home › Johns Creek › HVAC

HVAC permits in Johns Creek, GA

Data through July 2026 · updated 23 Oct 2026

1,255 HVAC permits were issued in Johns Creek, August 2024 through July 2026: about 628 a year and 32% of all permits. 633 HVAC permits in the last 12 months on file (Aug 2025–Jul 2026), about the same as the 622 in the 12 months before. The busiest month is June.

1,255permits issued
633last 12 months on file
Junbusiest month
65%finished
Jul 2026records through

HVAC permits by month

Permits issued each month, August 2024 through July 2026.

Aug 2024: 58Aug2024Sep 2024: 51Oct 2024: 50Nov 2024: 44Dec 2024: 51Jan 2025: 48Jan2025Feb 2025: 24Mar 2025: 62Apr 2025: 55May 2025: 51Jun 2025: 72Jul 2025: 56JulAug 2025: 67Sep 2025: 33Oct 2025: 45Nov 2025: 54Dec 2025: 51Jan 2026: 38Jan2026Feb 2026: 44Mar 2026: 56Apr 2026: 64May 2026: 66Jun 2026: 55Jul 2026: 60Jul
The same numbers as a table
MonthPermits
Aug 202458
Sep 202451
Oct 202450
Nov 202444
Dec 202451
Jan 202548
Feb 202524
Mar 202562
Apr 202555
May 202551
Jun 202572
Jul 202556
Aug 202567
Sep 202533
Oct 202545
Nov 202554
Dec 202551
Jan 202638
Feb 202644
Mar 202656
Apr 202664
May 202666
Jun 202655
Jul 202660

Download this table (CSV)

When HVAC permits are filed

By calendar month, 100 = an average month (the thin line). June is the busiest (121), February the quietest (65). A busy month at the permit counter usually means a longer wait for a contractor.

January: 82 (100 = an average month)February: 65 (100 = an average month)March: 113 (100 = an average month)April: 114 (100 = an average month)May: 112 (100 = an average month)June: 121 (100 = an average month)121July: 111 (100 = an average month)August: 120 (100 = an average month)September: 80 (100 = an average month)October: 91 (100 = an average month)November: 94 (100 = an average month)December: 98 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January82
February65
March113
April114
May112
June121
July111
August120
September80
October91
November94
December98

Download this table (CSV)

How many HVAC permits get finished

Permits issued Aug 2024–Jul 2025, at least 12 months before the file ends.

MeasureValue
Permits issued Aug 2024–Jul 2025622
Finished65.3%
Expired34.1%

Download this table (CSV)

Other kinds of work here

How Johns Creek compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

How these numbers are made

Source: City of Johns Creek, Building Permits Issued (ArcGIS layer), read 23 Oct 2026. We count permits issued August 2024 through July 2026; denied and withdrawn permits are left out.

Permits the City of Johns Creek issues for homes inside city limits: residential building permits, plus mechanical, electrical, plumbing, fence, retaining-wall and demolition permits on property the tax roll classes as residential. Commercial building permits, trade permits on commercial property, right-of-way, sign, tree-removal and land-disturbance permits in the same file are not counted. Alpharetta, Milton, Duluth and the rest of Fulton and Forsyth counties run their own permit offices and are not in this file.

  • The city's file names no contractor, so there are no contractor lists, rankings or firm pages for Johns Creek.
  • The file has no job value, no final inspection date and no ZIP code, so we show no costs, no time to final and no ZIP pages.
  • A residential building permit in the file doesn't say whether it is a new house, an addition or a remodel, so those permits are counted together under other.
  • The city last refreshed its permit file in mid-August 2026, so the window ends in July 2026.
  • Trade permits are counted as home permits when the parcel's tax class is residential; trade permits on parcels we couldn't match are left out.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "HVAC permits in Johns Creek, GA", https://contractorrecords.com/johns-creek/hvac-permits, data through July 2026, from the City of Johns Creek Community Development Department building-permit records.

Link to a table: By month · Season · How many get finished.

Download the tables (CSV): HVAC permits by month · HVAC permits by calendar month (index) · HVAC permits: finished share.

Common questions

  • How many HVAC permits does Johns Creek issue a year?About 628 a year in Johns Creek: 1,255 permits issued August 2024 through July 2026, 633 of them in the last 12 months on file (to July 2026).
  • When do people in Johns Creek file the most HVAC permits?June (121 against an average month of 100); February is the quietest (65). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.