Demolition permits in Kansas City, MO

Data through September 2026 · updated 18 Oct 2026

430 demolition permits were issued in Kansas City, October 2024 through September 2026: about 215 a year and 2% of all permits. 208 demolition permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 222 in the 12 months before. The busiest month is April. The usual one took 21 days from issue to the city's final. 64127 has the most, 56.

430permits issued
208last 12 months
Aprbusiest month
21days, usual issue to final
75%finished
Sep 2026records through

Demolition permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 27Oct2024Nov 2024: 27Dec 2024: 18Jan 2025: 7Jan2025Feb 2025: 14Mar 2025: 16Apr 2025: 22May 2025: 27Jun 2025: 9Jul 2025: 25JulAug 2025: 13Sep 2025: 17Oct 2025: 17Nov 2025: 12Dec 2025: 20Jan 2026: 11Jan2026Feb 2026: 13Mar 2026: 30Apr 2026: 30May 2026: 15Jun 2026: 12Jul 2026: 15JulAug 2026: 15Sep 2026: 18
The same numbers as a table
MonthPermits
Oct 202427
Nov 202427
Dec 202418
Jan 20257
Feb 202514
Mar 202516
Apr 202522
May 202527
Jun 20259
Jul 202525
Aug 202513
Sep 202517
Oct 202517
Nov 202512
Dec 202520
Jan 202611
Feb 202613
Mar 202630
Apr 202630
May 202615
Jun 202612
Jul 202615
Aug 202615
Sep 202618

Download this table (CSV)

When demolition permits are filed

By calendar month, 100 = an average month (the thin line). April is the busiest (145), January the quietest (50). A busy month at the permit counter usually means a longer wait for a contractor.

January: 50 (100 = an average month)February: 75 (100 = an average month)March: 128 (100 = an average month)April: 145 (100 = an average month)145May: 117 (100 = an average month)June: 59 (100 = an average month)July: 112 (100 = an average month)August: 78 (100 = an average month)September: 98 (100 = an average month)October: 123 (100 = an average month)November: 109 (100 = an average month)December: 106 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January50
February75
March128
April145
May117
June59
July112
August78
September98
October123
November109
December106

Download this table (CSV)

How long a demolition permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 166 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025222
Finished74.8%
Expired0.5%
Usual days, issue to final21
Middle half, days12–41

Download this table (CSV)

ZIP codes with the most demolition permits

Counted at the property's ZIP code. Share is the part of the city's 430 demolition permits.

ZIP codePermitsShare
641275613%
641304611%
64111348%
64128348%
64114256%
64131256%
64132225%
64126205%
64113184%
64109153%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Complete Building Demolition35282%
Interior Demolition Only6816%
Partial Building Demolition102%

Download this table (CSV)

Nearby permit data

Demolition permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kansas City, MO Open Data, City Issued Permits (data.kcmo.org, dataset w8jz-wjgn), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Kansas City, Missouri issues inside the city limits (in Jackson, Clay, Platte and Cass counties): building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes and townhouses. Commercial permits, public works street and excavation permits, water service, zoning approvals and certificates of occupancy in the same file are not counted. Kansas City, Kansas, Independence, Overland Park and the other metro cities run their own permit offices and are not in this file.

  • The city's current permit file names no contractor, so there are no contractor lists, rankings or firm pages for Kansas City.
  • The city's valuation field is blank or zero on almost every residential permit in the window, so we show no costs.
  • The city's permit counts fall to less than half their usual level in May 2024, so the window starts in October 2024, well after the counts settle.
  • Roof replacements and rooftop solar have no permit type of their own in this file, so there are no roofing or solar counts. A permit the city files under the building type 'Other', or as a deck, counts under Other.
  • A new house gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work. Burglar and security alarm permits, filed as electrical, count under Other.
  • A final date comes from the city's finaled date on permits it shows as Closed or Work Completed. The ZIP code is the one on the permit's address.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Demolition permits in Kansas City, MO", https://contractorrecords.com/kansas-city/demolition-permits, data through September 2026, from the City of Kansas City, Missouri City Planning & Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Demolition permits by month · Demolition permits by calendar month (index) · Demolition permits: days to final · Demolition permits by ZIP code · Demolition permits by permit type.

Common questions

  • How many demolition permits does Kansas City issue a year?About 215 a year in Kansas City: 430 permits issued October 2024 through September 2026, 208 of them in the last 12 months.
  • How long does a demolition permit take in Kansas City?The usual one took 21 days from issue to the city's final inspection, and the middle half took 12 to 41 days (166 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kansas City file the most demolition permits?April (145 against an average month of 100); January is the quietest (50). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most demolition permits in Kansas City?64127, with 56 of the 430 (13%); then 64130 (46).