1,736 remodel and repair permits were issued in Kansas City, October 2024 through September 2026: about 868 a year and 7% of all permits. 871 remodel and repair permits in the last 12 months (Oct 2025–Sep 2026), about the same as the 865 in the 12 months before. The busiest month is July. The usual one took 127 days from issue to the city's final. 64130 has the most, 167.

1,736permits issued
871last 12 months
Julbusiest month
127days, usual issue to final
49%finished
Sep 2026records through

Remodel and repair permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 82Oct2024Nov 2024: 58Dec 2024: 61Jan 2025: 71Jan2025Feb 2025: 54Mar 2025: 54Apr 2025: 76May 2025: 75Jun 2025: 71Jul 2025: 92JulAug 2025: 80Sep 2025: 91Oct 2025: 70Nov 2025: 56Dec 2025: 54Jan 2026: 55Jan2026Feb 2026: 72Mar 2026: 70Apr 2026: 94May 2026: 93Jun 2026: 72Jul 2026: 80JulAug 2026: 85Sep 2026: 70
The same numbers as a table
MonthPermits
Oct 202482
Nov 202458
Dec 202461
Jan 202571
Feb 202554
Mar 202554
Apr 202576
May 202575
Jun 202571
Jul 202592
Aug 202580
Sep 202591
Oct 202570
Nov 202556
Dec 202554
Jan 202655
Feb 202672
Mar 202670
Apr 202694
May 202693
Jun 202672
Jul 202680
Aug 202685
Sep 202670

Download this table (CSV)

When remodel and repair permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (119), November the quietest (79). A busy month at the permit counter usually means a longer wait for a contractor.

January: 87 (100 = an average month)February: 87 (100 = an average month)March: 86 (100 = an average month)April: 118 (100 = an average month)May: 116 (100 = an average month)June: 99 (100 = an average month)July: 119 (100 = an average month)119August: 114 (100 = an average month)September: 111 (100 = an average month)October: 105 (100 = an average month)November: 79 (100 = an average month)December: 79 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January87
February87
March86
April118
May116
June99
July119
August114
September111
October105
November79
December79

Download this table (CSV)

How long a remodel and repair permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 426 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025865
Finished49.2%
Expired2.0%
Usual days, issue to final127
Middle half, days61–216

Download this table (CSV)

ZIP codes with the most remodel and repair permits

Counted at the property's ZIP code. Share is the part of the city's 1,736 remodel and repair permits.

ZIP codePermitsShare
6413016710%
641271237%
641141126%
641281046%
64113825%
64131754%
64134734%
64124724%
64109714%
64132674%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family - Interior Remodel1,66896%
Duplex - Interior Remodel523%
Townhouse - Interior Remodel16under 1%

Download this table (CSV)

How Kansas City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Remodel and repair permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kansas City, MO Open Data, City Issued Permits (data.kcmo.org, dataset w8jz-wjgn), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Kansas City, Missouri issues inside the city limits (in Jackson, Clay, Platte and Cass counties): building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes and townhouses. Commercial permits, public works street and excavation permits, water service, zoning approvals and certificates of occupancy in the same file are not counted. Kansas City, Kansas, Independence, Overland Park and the other metro cities run their own permit offices and are not in this file.

  • The city's current permit file names no contractor, so there are no contractor lists, rankings or firm pages for Kansas City.
  • The city's valuation field is blank or zero on almost every residential permit in the window, so we show no costs.
  • The city's permit counts fall to less than half their usual level in May 2024, so the window starts in October 2024, well after the counts settle.
  • Roof replacements and rooftop solar have no permit type of their own in this file, so there are no roofing or solar counts. A permit the city files under the building type 'Other', or as a deck, counts under Other.
  • A new house gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work. Burglar and security alarm permits, filed as electrical, count under Other.
  • A final date comes from the city's finaled date on permits it shows as Closed or Work Completed. The ZIP code is the one on the permit's address.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Remodel and repair permits in Kansas City, MO", https://contractorrecords.com/kansas-city/remodel-permits, data through September 2026, from the City of Kansas City, Missouri City Planning & Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Remodels & repairs permits by month · Remodels & repairs permits by calendar month (index) · Remodels & repairs permits: days to final · Remodels & repairs permits by ZIP code · Remodels & repairs permits by permit type.

Common questions

  • How many remodel and repair permits does Kansas City issue a year?About 868 a year in Kansas City: 1,736 permits issued October 2024 through September 2026, 871 of them in the last 12 months.
  • How long does a remodel and repair permit take in Kansas City?The usual one took 127 days from issue to the city's final inspection, and the middle half took 61 to 216 days (426 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kansas City file the most remodel and repair permits?July (119 against an average month of 100); November is the quietest (79). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most remodel and repair permits in Kansas City?64130, with 167 of the 1,736 (10%); then 64127 (123).