Data through September 2026 · updated 18 Oct 2026

8,430 electrical permits were issued in Kansas City, October 2024 through September 2026: about 4,215 a year and 33% of all permits. 4,077 electrical permits in the last 12 months (Oct 2025–Sep 2026), 6% fewer than the 4,353 in the 12 months before. The busiest month is July. The usual one took 40 days from issue to the city's final. 64130 has the most, 682.

8,430permits issued
4,077last 12 months
Julbusiest month
40days, usual issue to final
63%finished
Sep 2026records through

Electrical permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 377Oct2024Nov 2024: 342Dec 2024: 371Jan 2025: 219Jan2025Feb 2025: 268Mar 2025: 311Apr 2025: 374May 2025: 372Jun 2025: 421Jul 2025: 466JulAug 2025: 450Sep 2025: 382Oct 2025: 394Nov 2025: 289Dec 2025: 343Jan 2026: 299Jan2026Feb 2026: 330Mar 2026: 290Apr 2026: 342May 2026: 293Jun 2026: 399Jul 2026: 362JulAug 2026: 315Sep 2026: 421
The same numbers as a table
MonthPermits
Oct 2024377
Nov 2024342
Dec 2024371
Jan 2025219
Feb 2025268
Mar 2025311
Apr 2025374
May 2025372
Jun 2025421
Jul 2025466
Aug 2025450
Sep 2025382
Oct 2025394
Nov 2025289
Dec 2025343
Jan 2026299
Feb 2026330
Mar 2026290
Apr 2026342
May 2026293
Jun 2026399
Jul 2026362
Aug 2026315
Sep 2026421

Download this table (CSV)

When electrical permits are filed

By calendar month, 100 = an average month (the thin line). July is the busiest (118), January the quietest (74). A busy month at the permit counter usually means a longer wait for a contractor.

January: 74 (100 = an average month)February: 85 (100 = an average month)March: 86 (100 = an average month)April: 102 (100 = an average month)May: 95 (100 = an average month)June: 117 (100 = an average month)July: 118 (100 = an average month)118August: 109 (100 = an average month)September: 114 (100 = an average month)October: 110 (100 = an average month)November: 90 (100 = an average month)December: 102 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January74
February85
March86
April102
May95
June117
July118
August109
September114
October110
November90
December102

Download this table (CSV)

How long an electrical permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 2,750 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 20254,353
Finished63.2%
Expired0.4%
Usual days, issue to final40
Middle half, days14–152

Download this table (CSV)

ZIP codes with the most electrical permits

Counted at the property's ZIP code. Share is the part of the city's 8,430 electrical permits.

ZIP codePermitsShare
641306828%
641144836%
641554185%
641563875%
641133855%
641313794%
641343764%
641573634%
641323604%
641273444%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Electrical General5,67867%
Electrical with Service1,99224%
Electrical Reconnect5216%
Electrical General - Townhouse1792%
Electrical Limited Service60under 1%

Download this table (CSV)

How Kansas City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

Electrical permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kansas City, MO Open Data, City Issued Permits (data.kcmo.org, dataset w8jz-wjgn), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Kansas City, Missouri issues inside the city limits (in Jackson, Clay, Platte and Cass counties): building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes and townhouses. Commercial permits, public works street and excavation permits, water service, zoning approvals and certificates of occupancy in the same file are not counted. Kansas City, Kansas, Independence, Overland Park and the other metro cities run their own permit offices and are not in this file.

  • The city's current permit file names no contractor, so there are no contractor lists, rankings or firm pages for Kansas City.
  • The city's valuation field is blank or zero on almost every residential permit in the window, so we show no costs.
  • The city's permit counts fall to less than half their usual level in May 2024, so the window starts in October 2024, well after the counts settle.
  • Roof replacements and rooftop solar have no permit type of their own in this file, so there are no roofing or solar counts. A permit the city files under the building type 'Other', or as a deck, counts under Other.
  • A new house gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work. Burglar and security alarm permits, filed as electrical, count under Other.
  • A final date comes from the city's finaled date on permits it shows as Closed or Work Completed. The ZIP code is the one on the permit's address.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "Electrical permits in Kansas City, MO", https://contractorrecords.com/kansas-city/electrical-permits, data through September 2026, from the City of Kansas City, Missouri City Planning & Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): Electrical permits by month · Electrical permits by calendar month (index) · Electrical permits: days to final · Electrical permits by ZIP code · Electrical permits by permit type.

Common questions

  • How many electrical permits does Kansas City issue a year?About 4,215 a year in Kansas City: 8,430 permits issued October 2024 through September 2026, 4,077 of them in the last 12 months.
  • How long does an electrical permit take in Kansas City?The usual one took 40 days from issue to the city's final inspection, and the middle half took 14 to 152 days (2,750 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kansas City file the most electrical permits?July (118 against an average month of 100); January is the quietest (74). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.