New home permits in Kansas City, MO

Data through September 2026 · updated 18 Oct 2026

1,273 new home permits were issued in Kansas City, October 2024 through September 2026: about 636 a year and 5% of all permits. 712 new home permits in the last 12 months (Oct 2025–Sep 2026), 27% more than the 561 in the 12 months before. The busiest month is October. The usual one took 316 days from issue to the city's final. 64156 has the most, 259.

1,273permits issued
712last 12 months
Octbusiest month
316days, usual issue to final
76%finished
Sep 2026records through

New home permits by month

Permits issued each month, October 2024 through September 2026.

Oct 2024: 49Oct2024Nov 2024: 24Dec 2024: 37Jan 2025: 57Jan2025Feb 2025: 42Mar 2025: 44Apr 2025: 50May 2025: 58Jun 2025: 41Jul 2025: 73JulAug 2025: 39Sep 2025: 47Oct 2025: 93Nov 2025: 30Dec 2025: 39Jan 2026: 36Jan2026Feb 2026: 55Mar 2026: 67Apr 2026: 48May 2026: 63Jun 2026: 63Jul 2026: 66JulAug 2026: 98Sep 2026: 54
The same numbers as a table
MonthPermits
Oct 202449
Nov 202424
Dec 202437
Jan 202557
Feb 202542
Mar 202544
Apr 202550
May 202558
Jun 202541
Jul 202573
Aug 202539
Sep 202547
Oct 202593
Nov 202530
Dec 202539
Jan 202636
Feb 202655
Mar 202667
Apr 202648
May 202663
Jun 202663
Jul 202666
Aug 202698
Sep 202654

Download this table (CSV)

When new home permits are filed

By calendar month, 100 = an average month (the thin line). October is the busiest (134), November the quietest (51). A busy month at the permit counter usually means a longer wait for a contractor.

January: 88 (100 = an average month)February: 91 (100 = an average month)March: 105 (100 = an average month)April: 92 (100 = an average month)May: 114 (100 = an average month)June: 98 (100 = an average month)July: 131 (100 = an average month)August: 129 (100 = an average month)September: 95 (100 = an average month)October: 134 (100 = an average month)134November: 51 (100 = an average month)December: 72 (100 = an average month)JFMAMJJASOND
The same numbers as a table
MonthIndex
January88
February91
March105
April92
May114
June98
July131
August129
September95
October134
November51
December72

Download this table (CSV)

How long a new home permit takes

Permits issued Oct 2024–Sep 2025, at least 12 months before the file ends. Usual days is the middle permit among the 425 with a final date.

MeasureValue
Permits issued Oct 2024–Sep 2025561
Finished75.8%
Expired0.0%
Usual days, issue to final316
Middle half, days257–390

Download this table (CSV)

ZIP codes with the most new home permits

Counted at the property's ZIP code. Share is the part of the city's 1,273 new home permits.

ZIP codePermitsShare
6415625920%
6415520916%
6415419115%
6415718014%
64153877%
64152574%
64158343%
64119292%
64151272%
64136272%

Download this table (CSV)

The city's own permit types

How the city filed these permits. We group its types into kinds of work; this is the split.

Permit typePermitsShare
Single Family - New1,07384%
Townhouse - New18715%
Duplex - New131%

Download this table (CSV)

How Kansas City compares with other cities

From our cross-city data studies: the same measure, read the same way, for every city we cover.

Nearby permit data

New home permits for other places in Kansas City. Each permit office keeps its own file, so the numbers are not added together.

How these numbers are made

Source: City of Kansas City, MO Open Data, City Issued Permits (data.kcmo.org, dataset w8jz-wjgn), read 18 Oct 2026. We count permits issued October 2024 through September 2026; denied and withdrawn permits are left out.

Residential permits the City of Kansas City, Missouri issues inside the city limits (in Jackson, Clay, Platte and Cass counties): building, electrical, mechanical, plumbing and demolition permits for single-family homes, duplexes and townhouses. Commercial permits, public works street and excavation permits, water service, zoning approvals and certificates of occupancy in the same file are not counted. Kansas City, Kansas, Independence, Overland Park and the other metro cities run their own permit offices and are not in this file.

  • The city's current permit file names no contractor, so there are no contractor lists, rankings or firm pages for Kansas City.
  • The city's valuation field is blank or zero on almost every residential permit in the window, so we show no costs.
  • The city's permit counts fall to less than half their usual level in May 2024, so the window starts in October 2024, well after the counts settle.
  • Roof replacements and rooftop solar have no permit type of their own in this file, so there are no roofing or solar counts. A permit the city files under the building type 'Other', or as a deck, counts under Other.
  • A new house gets separate building, electrical, mechanical and plumbing permits, so one project can count several times, once under each kind of work. Burglar and security alarm permits, filed as electrical, count under Other.
  • A final date comes from the city's finaled date on permits it shows as Closed or Work Completed. The ZIP code is the one on the permit's address.

Counts are permits, not jobs: one job can need several permits. Nobody paid to be on this page and nobody can. Sources and definitions →

Cite this page

Free to reuse with attribution (CC BY 4.0). Please credit Contractor Records and link to this page. Suggested citation:

Contractor Records, "New home permits in Kansas City, MO", https://contractorrecords.com/kansas-city/new-home-permits, data through September 2026, from the City of Kansas City, Missouri City Planning & Development Department building-permit records.

Link to a table: By month · Season · Days to final · By ZIP code · Permit types.

Download the tables (CSV): New homes permits by month · New homes permits by calendar month (index) · New homes permits: days to final · New homes permits by ZIP code · New homes permits by permit type.

Common questions

  • How many new home permits does Kansas City issue a year?About 636 a year in Kansas City: 1,273 permits issued October 2024 through September 2026, 712 of them in the last 12 months.
  • How long does a new home permit take in Kansas City?The usual one took 316 days from issue to the city's final inspection, and the middle half took 257 to 390 days (425 permits issued Oct 2024–Sep 2025 that reached a final). The wait to get the permit issued is not in this file.
  • When do people in Kansas City file the most new home permits?October (134 against an average month of 100); November is the quietest (51). If you can choose, a quiet month at the permit counter can mean contractors have more room in their schedules.
  • Which ZIP code has the most new home permits in Kansas City?64156, with 259 of the 1,273 (20%); then 64155 (209).