The busiest generator installer in the City of Little Rock in the last 12 months on file was Generator Supercenter, with 45 generator permits; 28 generator installers pulled 213 generator permits on homes there from May 2023 to April 2026, and 84% of their permits a year or more old reached completion.
11 of them filed one in the last 12 months on file. Next were Northside Power & Electric, LLC (19 permits) and Tri-State Water Power & Air (3); busy is not the same as careful. Little Rock, AR generator permits carry no filed job value, so this list compares firms on permits filed, finishing and recent activity only. Side by side: permits filed, share finished and permits in the last 12 months on file for each firm. Pick what you value and the list re-orders.
Data through April 2026 · updated
Get references and proof of insurance before you sign. Hiring a generator installer →
The top 5 of the 11 firms that filed a generator permit in the last 12 months on file, May 2025–Apr 2026, ranked by how many they filed, with each firm's permits in the whole file and the share of its permits a year or more old that were finished. This is volume, not quality: a busy firm is not necessarily a careful one.
| # | Contractor | Last 12 mo | Permits | Finished |
|---|---|---|---|---|
| 1 | Generator Supercenter | 45 | 105 | 74% |
| 2 | Northside Power & Electric, LLC | 19 | 29 | 83% |
| 3 | Tri-State Water Power & Air | 3 | 24 | 90% |
| 4 | Paschal Home Services | 2 | 3 | — |
| 5 | Codeman Electrical Solutions | 2 | 2 | — |
The 8 ZIP codes with the most generator permits on homes from May 2023 to April 2026. Each opens permits by trade and the most active firms there.
72211 (40) 72207 (27) 72204 (25) 72212 (25) 72227 (23) 72223 (22) 72205 (17) 72209 (14)
Before you move a slider, the list is in a default order built only from the permit record: how much of each firm’s record is this kind of job (weight 30), how often its permits reached completion (25) and how many permits it filed in the last 12 months on file (15). Each measure is ranked against the other 28 firms and pulled toward the middle when a record is short.
The order comes from the Little Rock permit file, not from reviews: 11 of 28 generator installers filed a permit in the last 12 months on file and 84% of their permits a year or more old were finished. Nobody pays to be listed or to move up, and there are no star ratings or reviews. The sliders and presets change the weights, and the order changes with them. How the records work in Little Rock.
From our cross-city data studies: the same measure, read the same way, for every city we cover.
We do not rate contractors. In this page’s default order, which uses only the permit record through Apr 2026, the top 3 are Tri-State Water Power & Air (24 permits, 90% finished), Northside Power & Electric, LLC (29 permits, 83% finished) and Mister Sparky Electric (8 permits). By permits filed alone, the most active is Generator Supercenter with 105.
28 firms are on the list; the busiest filed 45 generator permits in the last 12 months on file and the middle firm filed 1 in the whole file. Line them up on the same public measures: permits filed and share of permits finished. Pick what matters to you and the list re-orders, for example recent activity if you need someone soon. The order comes from the permit record only, and nobody pays to be listed or to move up.
28 firms filed at least one generator permit on homes in the City of Little Rock from May 2023 to April 2026; 11 of them filed one in the last 12 months on file.
We have not matched license records to Little Rock firms, so ask for the license number and check it yourself with Arkansas Board of Electrical Examiners roster.
Three you can check against this page: “How many generator permits have you filed in Little Rock?” (the middle firm here filed 1; 11 of 28 filed one in the last 12 months on file); “What does your quote include: the permit fee and the city inspection?”; “Will you pull the permit in your company’s name, and when is the final inspection?” (84% of older generator permits here were finished). All 10 questions and how to check each →
On this page: 28 firms filed 213 generator permits from May 2023 to April 2026, and each firm’s name opens its own permit record. Every number comes from City of Little Rock Planning and Development permits on single-family, duplex and manufactured homes (the City's periodic permit download, the edition that runs to April 30, 2026). To see one permit itself, search the address or permit number with the Little Rock permit office. How the records work in Little Rock →
Little Rock generator permits carry no filed job value, so we can’t rank generator installers by price. Get two or three written quotes; ask whether the permit fee and the city inspection are included; shortlist from the 11 firms that filed in the last 12 months on file.
We do not rate or collect reviews. Instead each of the 28 generator installers here is shown with its permit record: 213 permits and the share finished. Read reviews on other sites and use this page to check them against the record. Reviews vs permit records →
Every number on this page comes from City of Little Rock Planning and Development permits on single-family, duplex and manufactured homes (the City's periodic permit download, the edition that runs to April 30, 2026): 28 firms filed 213 generator permits on homes in the City of Little Rock from May 2023 to April 2026, and 11 of them filed one in the last 12 months on file. The middle firm has 1 permit in the whole file. A short record leaves more uncertainty, and some jobs never require a permit.
No usable job value is recorded for this permit type, so no typical cost is shown. See how we compare records.
Most Little Rock generator permits are filed in April (134 against an average month of 100); July is the quietest (57). When each trade is busiest in Little Rock →